Minxi Liu
- Listed as
- architect
- Firm
- Urbn Impression
- Based in
- Oakland
- On San Francisco permits
- Sep 2006 to Feb 2025
13 permits since 2000 (architect on 13 permits): 9 completed, 1 in progress, 2 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 19, 2025 | In progress issued Jun 2025 | 1939 43rd Av | Bigo Construction Inc. | legalize horizontal addition of bedroom, hallway & part of family room. convert part of ground flr space to a part of family room. replace (e) gas furnace & duct system. install new electrical panel (meter to be installed by pg&e under pg&e neighborhood upgrade program) comply with nov 202428641.Details
legalize horizontal addition of bedroom, hallway & part of family room. convert part of ground flr space to a part of family room. replace (e) gas furnace & duct system. install new electrical panel (meter to be installed by pg&e under pg&e neighborhood upgrade program) comply with nov 202428641. | $98,300 |
| Aug 3, 2020 | Completed final sign-off Sep 2022 | 2485 Post St | Nbay Construction | remove the proposed fire sprinkler system installation for the new ground unit. (reference permit app #2017-1221-7187 s1.)Details
remove the proposed fire sprinkler system installation for the new ground unit. (reference permit app #2017-1221-7187 s1.) | |
| Aug 24, 2018 | Completed final sign-off May 2019 | 357 Bridgeview Dr | per adu ordinance# 162-16, ground floor space conversion to 2 bedroom & 1 bath. upgrade water meter.Details
per adu ordinance# 162-16, ground floor space conversion to 2 bedroom & 1 bath. upgrade water meter. | $60,000 | |
| Aug 2, 2018 | Completed final sign-off Jan 2019 | 575 29th St | replace deck guards with metal revision to 201807104144Details
replace deck guards with metal revision to 201807104144 | ||
| Jul 30, 2018 | Completed final sign-off Feb 2019 | 355 Bridgeview Dr | ground floor excavation within the building envelope, deepen footing, new windows & door for future adu, main fl. interior addition of a new bath, new wood stair to the rear yardDetails
ground floor excavation within the building envelope, deepen footing, new windows & door for future adu, main fl. interior addition of a new bath, new wood stair to the rear yard | $39,000 | |
| Jul 10, 2018 | Completed final sign-off Jan 2019 | 575 29th St | revision to ba # 201805038172 via 200711148137, comply w/ nov 201540442. interior aleration of kitchen & master bath, exterior stair at rear alteration.Details
revision to ba # 201805038172 via 200711148137, comply w/ nov 201540442. interior aleration of kitchen & master bath, exterior stair at rear alteration. | ||
| Dec 21, 2017 | Completed final sign-off Sep 2022 | 2485 Post St | Nbay Construction | horizontal addition. conversion of (e) bedroom & part of garage to a new unit. replace rotted wood members in the (e) garage. install new elec & gas meters. horizontal addition & alteration of (e) 2 bedroom, 1 bath unit to a 3 bedroom, 2 baths. convert part of the garage to a new internal stair.Details
horizontal addition. conversion of (e) bedroom & part of garage to a new unit. replace rotted wood members in the (e) garage. install new elec & gas meters. horizontal addition & alteration of (e) 2 bedroom, 1 bath unit to a 3 bedroom, 2 baths. convert part of the garage to a new internal stair. | $185,000 |
| Aug 14, 2013 | Never finaled issued Dec 2013, no final | 770 04th Av | convert bsmt to a bedroom, playroom & half bath. interior remodel. convert small roof to a balcony. window & door alteration. exterior entry stair modification. alteration of rear wood deck. replacing (e) windows in kind w/wood frame.Details
convert bsmt to a bedroom, playroom & half bath. interior remodel. convert small roof to a balcony. window & door alteration. exterior entry stair modification. alteration of rear wood deck. replacing (e) windows in kind w/wood frame. | $40,000 | |
| Jul 19, 2013 | Completed final sign-off Jun 2014 | 324 03rd Av | ground floor: convert storage & laundry to a bedroom. 2nd fl: alteration of kitchen, bath, dining room & stair. 3rd fl: convert 2 bedrooms to a master suite. attic fl: convert non-habitable space to a master suite & a sitting room. add 2 dormers. alter of rear exterior stair & replace (e) rear deckDetails
ground floor: convert storage & laundry to a bedroom. 2nd fl: alteration of kitchen, bath, dining room & stair. 3rd fl: convert 2 bedrooms to a master suite. attic fl: convert non-habitable space to a master suite & a sitting room. add 2 dormers. alter of rear exterior stair & replace (e) rear deck | $85,000 | |
| Aug 1, 2012 | Never finaled issued Aug 2012, no final | 2422 25th Av | kitchen & 2 bathrooms alteration, replace 4 windows (not facing the street) replace 1st floor roof with decking, add door to roof deck, replace 3 brick spot footing with concrete. change out electrical, heat & water heaterDetails
kitchen & 2 bathrooms alteration, replace 4 windows (not facing the street) replace 1st floor roof with decking, add door to roof deck, replace 3 brick spot footing with concrete. change out electrical, heat & water heater | $65,000 | |
| Dec 17, 2008 | Completed final sign-off Jan 2011 | 136 18th Av | K & K Construction | horizontal addition at rear on basement fl of a family rm, conversion of basement work room to a guest bedrm, interior alteration of 2 bathrms & closets, reconst of roof deck & stair, replace existing stair connecting 1st fl & basement at new location.Details
horizontal addition at rear on basement fl of a family rm, conversion of basement work room to a guest bedrm, interior alteration of 2 bathrms & closets, reconst of roof deck & stair, replace existing stair connecting 1st fl & basement at new location. | $150,000 |
| Sep 8, 2006 | Completed final sign-off Sep 2006 | 154 Miramar Av | lay down concrete to form landscaping landscaping on side of front yard per n.o.v. 200672355 landscaping will take up 281 sq. ft. out of 1351 sq. ft. (21% of total front yard space) provide floor drainsDetails
lay down concrete to form landscaping landscaping on side of front yard per n.o.v. 200672355 landscaping will take up 281 sq. ft. out of 1351 sq. ft. (21% of total front yard space) provide floor drains | $500 | |
| Sep 6, 2006 | Expired or cancelled expired Mar 2009 | 417 Moscow St | vertical (3rd story) addition of 1 master suite, 2-bedroom, 1 media room, and 2 bathroom, 1 laundry room. new 3/fl deck w/exterior stair, modify existing deck.Details
vertical (3rd story) addition of 1 master suite, 2-bedroom, 1 media room, and 2 bathroom, 1 laundry room. new 3/fl deck w/exterior stair, modify existing deck. | $130,000 |