- 0 permits filed
22 permits since 2000: 21 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2021 | Completed final sign-off Aug 2021 | 441 24th Av | unit #7: remodel (e) kitchen ugrade electrical for kitchenDetails
unit #7: remodel (e) kitchen ugrade electrical for kitchen | $12,000 |
| Aug 3, 2020 | Completed final sign-off Sep 2022 | 2485 Post St | remove the proposed fire sprinkler system installation for the new ground unit. (reference permit app #2017-1221-7187 s1.)Details
remove the proposed fire sprinkler system installation for the new ground unit. (reference permit app #2017-1221-7187 s1.) | |
| Aug 5, 2019 | Completed final sign-off Jan 2020 | 1281 Mcallister St | unit 1281a: remodel existing (2) bathrooms (5' x 7') & kitchen (10' x 10')Details
unit 1281a: remodel existing (2) bathrooms (5' x 7') & kitchen (10' x 10') | $39,500 |
| Jul 10, 2019 | Never finaled issued Jul 2019, no final | 2760 San Bruno Av | approx 1500 sq ft of siding. install cement siding for courtyard walls (not visible to street). and not facing to street. repair dry rot if necessry. replace total 8 windows and 2 patio door (all not facing to street).all work is non-structural no framing modifications.Details
approx 1500 sq ft of siding. install cement siding for courtyard walls (not visible to street). and not facing to street. repair dry rot if necessry. replace total 8 windows and 2 patio door (all not facing to street).all work is non-structural no framing modifications. | $40,000 |
| Apr 8, 2019 | Completed final sign-off Sep 2019 | 751 14th Av | remodel (e) kitchen & bathDetails
remodel (e) kitchen & bath | $18,000 |
| Apr 13, 2018 | Completed final sign-off Apr 2019 | 621 Huron Av | construct two bedrooms, family room, laundry area & one full bathroom at ground floor; n/a maherDetails
construct two bedrooms, family room, laundry area & one full bathroom at ground floor; n/a maher | $52,000 |
| Feb 9, 2018 | Completed final sign-off Apr 2018 | 2525 23rd Av | comply w/ compliant #201835721. construct laundry room & half bath room at ground floor.Details
comply w/ compliant #201835721. construct laundry room & half bath room at ground floor. | $12,000 |
| Dec 21, 2017 | Completed final sign-off Sep 2022 | 2485 Post St | horizontal addition. conversion of (e) bedroom & part of garage to a new unit. replace rotted wood members in the (e) garage. install new elec & gas meters. horizontal addition & alteration of (e) 2 bedroom, 1 bath unit to a 3 bedroom, 2 baths. convert part of the garage to a new internal stair.Details
horizontal addition. conversion of (e) bedroom & part of garage to a new unit. replace rotted wood members in the (e) garage. install new elec & gas meters. horizontal addition & alteration of (e) 2 bedroom, 1 bath unit to a 3 bedroom, 2 baths. convert part of the garage to a new internal stair. | $185,000 |
| Mar 1, 2017 | Completed final sign-off May 2017 | 105 Lake St | #7. remodel existing kitchen & bathroom, no structural remodel.Details
#7. remodel existing kitchen & bathroom, no structural remodel. | $18,000 |
| Sep 2, 2016 | Completed final sign-off May 2017 | 269 Dorland St | revision to app#2016-0805-4373 for revising apartment unit number. reconfiguration on unit #269a dorland street.Details
revision to app#2016-0805-4373 for revising apartment unit number. reconfiguration on unit #269a dorland street. | |
| Aug 30, 2016 | Completed final sign-off Oct 2016 | 1520 Geneva Av | remodel existing bathroom, no sheetrock removed.Details
remodel existing bathroom, no sheetrock removed. | $8,000 |
| Aug 18, 2016 | Completed final sign-off Dec 2016 | 62 Rosewood Dr | remodel existing master bathroomDetails
remodel existing master bathroom | $10,000 |
| Aug 5, 2016 | Completed final sign-off Jul 2017 | 267 Dorland St | structural upgrade: install shear wall & moment frames per sfbc chp 34b using 2012 iebc appendix a-4Details
structural upgrade: install shear wall & moment frames per sfbc chp 34b using 2012 iebc appendix a-4 | $50,000 |
| Aug 5, 2016 | Completed final sign-off May 2017 | 267 Dorland St | reconfigure unit #267a: two bedrooms, one bath,one kitchen and living room.Details
reconfigure unit #267a: two bedrooms, one bath,one kitchen and living room. | $40,000 |
| Jul 11, 2016 | Completed final sign-off Aug 2016 | 1688 Wallace Av | #304: remodel two existing, bathrooms & a kitchen.Details
#304: remodel two existing, bathrooms & a kitchen. | $25,000 |
| Jun 24, 2016 | Completed final sign-off Jan 2017 | 3150 Mission St | unit #1: remove existing plaster and lathe for whole unit. rebuild closets. install insulation and sheetrock drywall for whole unit.Details
unit #1: remove existing plaster and lathe for whole unit. rebuild closets. install insulation and sheetrock drywall for whole unit. | $3,000 |
| May 31, 2016 | Completed final sign-off Jan 2017 | 3150 Mission St | work in unit #1: remodel (e) kitchen and bathroom. update electrical to the building code for kitchen and bathroom.Details
work in unit #1: remodel (e) kitchen and bathroom. update electrical to the building code for kitchen and bathroom. | $18,000 |
| May 18, 2016 | Completed final sign-off Sep 2016 | 1509 Golden Gate Av | revision to ref pa 2015 1104 1748: structural upgradeDetails
revision to ref pa 2015 1104 1748: structural upgrade | |
| Mar 25, 2016 | Completed final sign-off Nov 2016 | 1940 Ellis St | soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4Details
soft story retrofit per sfbc chapter 34b, 2012 iebc appendix a-4 | $38,000 |
| Nov 4, 2015 | Completed final sign-off Sep 2016 | 1509 Golden Gate Av | structural upgrade: install shear walls & moment frames per soft story sfbc chapter 34b; ordinance 2012 iebc appendix a-4. n/a maher ordinanceDetails
structural upgrade: install shear walls & moment frames per soft story sfbc chapter 34b; ordinance 2012 iebc appendix a-4. n/a maher ordinance | $60,000 |
| Oct 23, 2015 | Completed final sign-off Sep 2016 | 2345 Post St | structural upgrade. install shear walls and moment frames per soft story ordinance, 2012 iebc appendix a-4. mandatory seismic retrofit.Details
structural upgrade. install shear walls and moment frames per soft story ordinance, 2012 iebc appendix a-4. mandatory seismic retrofit. | $50,000 |
| Apr 29, 2015 | Completed final sign-off Apr 2017 | 1940 Ellis St | replace (e) exxterior wood siding with new redwood/red cedar wood siding. not visible from street. east wall around 4,000 sq. ft.Details
replace (e) exxterior wood siding with new redwood/red cedar wood siding. not visible from street. east wall around 4,000 sq. ft. | $40,000 |