Back to bathroom remodel contractors
Nbay Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to Apr 2021
- Last 24 months
- 0 permits filed
22 permits since 2000: 21 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 11 completed. Typically 0 days from filing to permit and 150 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 5, 2019 | Completed final sign-off Jan 2020 | 1281 Mcallister St | unit 1281a: remodel existing (2) bathrooms (5' x 7') & kitchen (10' x 10')Details
unit 1281a: remodel existing (2) bathrooms (5' x 7') & kitchen (10' x 10') | $39,500 |
| Apr 8, 2019 | Completed final sign-off Sep 2019 | 751 14th Av | remodel (e) kitchen & bathDetails
remodel (e) kitchen & bath | $18,000 |
| Apr 13, 2018 | Completed final sign-off Apr 2019 | 621 Huron Av | construct two bedrooms, family room, laundry area & one full bathroom at ground floor; n/a maherDetails
construct two bedrooms, family room, laundry area & one full bathroom at ground floor; n/a maher | $52,000 |
| Feb 9, 2018 | Completed final sign-off Apr 2018 | 2525 23rd Av | comply w/ compliant #201835721. construct laundry room & half bath room at ground floor.Details
comply w/ compliant #201835721. construct laundry room & half bath room at ground floor. | $12,000 |
| Dec 21, 2017 | Completed final sign-off Sep 2022 | 2485 Post St | horizontal addition. conversion of (e) bedroom & part of garage to a new unit. replace rotted wood members in the (e) garage. install new elec & gas meters. horizontal addition & alteration of (e) 2 bedroom, 1 bath unit to a 3 bedroom, 2 baths. convert part of the garage to a new internal stair.Details
horizontal addition. conversion of (e) bedroom & part of garage to a new unit. replace rotted wood members in the (e) garage. install new elec & gas meters. horizontal addition & alteration of (e) 2 bedroom, 1 bath unit to a 3 bedroom, 2 baths. convert part of the garage to a new internal stair. | $185,000 |
| Mar 1, 2017 | Completed final sign-off May 2017 | 105 Lake St | #7. remodel existing kitchen & bathroom, no structural remodel.Details
#7. remodel existing kitchen & bathroom, no structural remodel. | $18,000 |
| Aug 30, 2016 | Completed final sign-off Oct 2016 | 1520 Geneva Av | remodel existing bathroom, no sheetrock removed.Details
remodel existing bathroom, no sheetrock removed. | $8,000 |
| Aug 18, 2016 | Completed final sign-off Dec 2016 | 62 Rosewood Dr | remodel existing master bathroomDetails
remodel existing master bathroom | $10,000 |
| Aug 5, 2016 | Completed final sign-off May 2017 | 267 Dorland St | reconfigure unit #267a: two bedrooms, one bath,one kitchen and living room.Details
reconfigure unit #267a: two bedrooms, one bath,one kitchen and living room. | $40,000 |
| Jul 11, 2016 | Completed final sign-off Aug 2016 | 1688 Wallace Av | #304: remodel two existing, bathrooms & a kitchen.Details
#304: remodel two existing, bathrooms & a kitchen. | $25,000 |
| May 31, 2016 | Completed final sign-off Jan 2017 | 3150 Mission St | work in unit #1: remodel (e) kitchen and bathroom. update electrical to the building code for kitchen and bathroom.Details
work in unit #1: remodel (e) kitchen and bathroom. update electrical to the building code for kitchen and bathroom. | $18,000 |