Nbay Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2015 to Apr 2021
- Last 24 months
- 0 permits filed
22 permits since 2000: 21 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 330 days from filing to permit and 1412 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 21, 2017 | Completed final sign-off Sep 2022 | 2485 Post St | horizontal addition. conversion of (e) bedroom & part of garage to a new unit. replace rotted wood members in the (e) garage. install new elec & gas meters. horizontal addition & alteration of (e) 2 bedroom, 1 bath unit to a 3 bedroom, 2 baths. convert part of the garage to a new internal stair.Details
horizontal addition. conversion of (e) bedroom & part of garage to a new unit. replace rotted wood members in the (e) garage. install new elec & gas meters. horizontal addition & alteration of (e) 2 bedroom, 1 bath unit to a 3 bedroom, 2 baths. convert part of the garage to a new internal stair. | $185,000 |