Block 1079, lot 018
2345 Post St
- City’s use
- Multi-Family Residential
- Built
- 1925
- Stories
- 3
- Units
- 22
- Rooms
- 22 bathrooms
- Building
- 15,750 sq ft
- Lot
- 6,250 sq ft
- Zoning
- NC3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 30, 2026 | Completed final sign-off Sep 2026 | 2345 Post St | Nbay Construction And Remodeling Inc | comply with nov# 202649420: repair main garage area due to car accident. restore the shear wall, holdowns, and any damaged structural area to its original condition.Details
comply with nov# 202649420: repair main garage area due to car accident. restore the shear wall, holdowns, and any damaged structural area to its original condition. | $100,000 |
| Jun 9, 2025 | Completed final sign-off Oct 2025 | 2345 Post St | Nbay Construction And Remodeling Inc | unit #4: remodel in kind (e) kitchen & bathroom. install subpanel, upgrade electrical for kitchen & bathroom. no change to floor layout. no change to wall layout. no structural work.Details
unit #4: remodel in kind (e) kitchen & bathroom. install subpanel, upgrade electrical for kitchen & bathroom. no change to floor layout. no change to wall layout. no structural work. | $40,000 |
| May 16, 2024 | Completed final sign-off May 2024 | 2345 Post St | Luminous Fire Alarm | as built for 202402055246 (upgrade fire alarm to comply with 1103.7.6.1)Details
as built for 202402055246 (upgrade fire alarm to comply with 1103.7.6.1) | |
| Feb 5, 2024 | Completed final sign-off May 2024 | 2345 Post St | Luminous Fire Alarm | fire alarm upgrade comply with 1103.7.6.1Details
fire alarm upgrade comply with 1103.7.6.1 | $44,000 |
| May 5, 2022 | Completed final sign-off May 2022 | 2345 Post St | Nbay Construction And Remodeling Inc | to comply w/nov #202182969. repair or replace extg garage door in kind per car accident.Details
to comply w/nov #202182969. repair or replace extg garage door in kind per car accident. | $1,000 |
| Sep 5, 2017 | Completed final sign-off Nov 2017 | 2345 Post St | Jones Bros Construction & Design Inc | apt #38: remodel existing kitchen & bathroom. replace cabinets and counter top.Details
apt #38: remodel existing kitchen & bathroom. replace cabinets and counter top. | $30,000 |
| Mar 14, 2016 | Never finaled issued Mar 2016, no final | 2345 Post St | street space permitDetails
street space permit | ||
| Oct 23, 2015 | Completed final sign-off Sep 2016 | 2345 Post St | Nbay Construction, Jones Bros Construction Inc | structural upgrade. install shear walls and moment frames per soft story ordinance, 2012 iebc appendix a-4. mandatory seismic retrofit.Details
structural upgrade. install shear walls and moment frames per soft story ordinance, 2012 iebc appendix a-4. mandatory seismic retrofit. | $50,000 |
| Sep 17, 2014 | Never finaled issued Sep 2014, no final | 2345 Post St | street space permitDetails
street space permit | ||
| Aug 26, 2014 | Completed final sign-off Feb 2015 | 2345 Post St | Jones Bros Construction Inc | install wood siding for east wall face to the yard, not facing the street.Details
install wood siding for east wall face to the yard, not facing the street. | $20,000 |
| Jun 13, 2014 | Completed final sign-off Sep 2014 | 2345 Post St | Jones Bros Construction Inc | replace the boiler for the water heater. fix the door for the water heater room door.Details
replace the boiler for the water heater. fix the door for the water heater room door. | $5,000 |
| Apr 14, 2014 | Completed final sign-off Sep 2014 | 2345 Post St | Jones Bros Construction Inc | replace wood siding for the west wall face to the side yard (not visible from the street). about 5,000 sq ft. no windows or doors impacted by this repair. maintain all egress at all times.Details
replace wood siding for the west wall face to the side yard (not visible from the street). about 5,000 sq ft. no windows or doors impacted by this repair. maintain all egress at all times. | $20,000 |
| Nov 15, 2013 | Completed final sign-off Dec 2013 | 2345 Post St | Jones Bros Construction Inc | repair the backyard siding (around 100 sq. ft.)and one windowDetails
repair the backyard siding (around 100 sq. ft.)and one window | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Jones Bros Construction Inc (5), Nbay Construction And Remodeling Inc (3), Luminous Fire Alarm (2), Jones Bros Construction & Design Inc, Nbay Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.