Back to bathroom remodel contractors
North Bay Construction
- Based in
- San Francisco
- On San Francisco permits
- Jul 2007 to Aug 2026
- Last 24 months
- 20 permits filed
153 permits since 2000: 122 completed, 11 in progress, 9 never finaled, 11 expired or cancelled.
Of the 9 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
79 bathroom remodel permits: 71 completed, 3 in progress, 2 never finaled, 3 expired or cancelled. Typically 2 days from filing to permit and 201 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2026 | In progress issued Aug 2026 | 1662 Page St | interior renovation of existing condo within existing building envelope. renovate existing kitchen, replace outswing exterior door to in-swing laundry. relocate bath to pantry, remove 1/2 bath to create bath 2. non-bearing walls not touched.Details
interior renovation of existing condo within existing building envelope. renovate existing kitchen, replace outswing exterior door to in-swing laundry. relocate bath to pantry, remove 1/2 bath to create bath 2. non-bearing walls not touched. | $112,447 |
| Feb 18, 2026 | Completed final sign-off Aug 2026 | 827 Scott St | unit 827- kitchen and bathroom remodel to in kind like for like no wall removal or layout change. repair water intrusion to ground level, ground storage room includes foundation waterproofing and drywall repairDetails
unit 827- kitchen and bathroom remodel to in kind like for like no wall removal or layout change. repair water intrusion to ground level, ground storage room includes foundation waterproofing and drywall repair | $140,000 |
| Sep 17, 2025 | Completed final sign-off Apr 2026 | 1082 Ashbury St | reconfiguration of main level interior walls to relocate (n) kitchen and (n) powder room within (e) envelope. (n) rear & side facade windows, (n) exterior rear facade material. remodel of upper level full bathroom and relocation of laundry room, no reconfiguration of upper level interior walls.Details
reconfiguration of main level interior walls to relocate (n) kitchen and (n) powder room within (e) envelope. (n) rear & side facade windows, (n) exterior rear facade material. remodel of upper level full bathroom and relocation of laundry room, no reconfiguration of upper level interior walls. | $90,000 |
| Aug 21, 2025 | In progress issued Oct 2025 | 15 Park Hill Av | revision to pa: 201908068086(s1):second unit deleted; ground fl renovation for a family room & full bath. demo exterior stairs to floor two. at 2nd fl, renovate kitchen and bathroom. at third fl, add a bathroom and renovate (e) bathroom. all new windows to replace existing. new skylights.Details
revision to pa: 201908068086(s1):second unit deleted; ground fl renovation for a family room & full bath. demo exterior stairs to floor two. at 2nd fl, renovate kitchen and bathroom. at third fl, add a bathroom and renovate (e) bathroom. all new windows to replace existing. new skylights. | |
| Mar 26, 2025 | Completed final sign-off Jun 2026 | 1912 09th Av | alter site to pa #202309066000: partial removal (e) flat roof, select interior walls & single glazed windows. (n) partial flat roof w/ buildable envelope (no increase height), (n) interior remodel 2/f: (n) primary bath, remodel (e) kitchen, (n) windows front facade, kitchen, living & primary bath.Details
alter site to pa #202309066000: partial removal (e) flat roof, select interior walls & single glazed windows. (n) partial flat roof w/ buildable envelope (no increase height), (n) interior remodel 2/f: (n) primary bath, remodel (e) kitchen, (n) windows front facade, kitchen, living & primary bath. | |
| Jan 29, 2025 | Completed final sign-off Jan 2026 | 572 Clipper St | revisions to existing approved permit pa#2024-1003-2272. new revisions to include a new skylight on the flat roof at rear of house, enlarged window at side of house, door at rear side of house. new bathroom layout.Details
revisions to existing approved permit pa#2024-1003-2272. new revisions to include a new skylight on the flat roof at rear of house, enlarged window at side of house, door at rear side of house. new bathroom layout. | |
| Oct 3, 2024 | Completed final sign-off Jan 2026 | 572 Clipper St | renovation/addition of (e) bed & baths lower level, convert 323 sf, non habitable space to habitable area new bedroom, bath, closet, new door and windows. main level kitchen renovation, converting bathroom to powder room. upper level bathroom renovation.Details
renovation/addition of (e) bed & baths lower level, convert 323 sf, non habitable space to habitable area new bedroom, bath, closet, new door and windows. main level kitchen renovation, converting bathroom to powder room. upper level bathroom renovation. | $85,000 |
| Sep 5, 2024 | Completed final sign-off Mar 2025 | 525 27th St | unit 2- 3 bathroom remodel like for like in kind remodelDetails
unit 2- 3 bathroom remodel like for like in kind remodel | $85,000 |
| Jun 6, 2024 | Completed final sign-off Mar 2025 | 178 Page St | 3rd fl remodel. remove wall between kitchen and dining. remove partial walls between family and hallway, living and office. kitchen remodel and 2 baths remodel.Details
3rd fl remodel. remove wall between kitchen and dining. remove partial walls between family and hallway, living and office. kitchen remodel and 2 baths remodel. | $100,000 |
| May 13, 2024 | Completed final sign-off Nov 2024 | 1120 Cole St | bathroom remodel like for like. tile floor & shower walls. plumbing change toilet & vanity, showerDetails
bathroom remodel like for like. tile floor & shower walls. plumbing change toilet & vanity, shower | $30,000 |
| Apr 15, 2024 | Completed final sign-off Jul 2024 | 1683 37th Av | bathroom remodel- new tile new floor change vanity. toilet and tub to stay in same location. in kind, no wood opening.Details
bathroom remodel- new tile new floor change vanity. toilet and tub to stay in same location. in kind, no wood opening. | $55,000 |
| Nov 1, 2023 | Completed final sign-off Jun 2024 | 1701 Jackson St | unit 508: guest bathroom and master bathroom remodel: new tile, replace plumbing fixtures in place, and electrical ie plugs & switches & sconces. like for likeDetails
unit 508: guest bathroom and master bathroom remodel: new tile, replace plumbing fixtures in place, and electrical ie plugs & switches & sconces. like for like | $80,000 |
| Nov 1, 2023 | Completed final sign-off Jan 2024 | 1247 Harrison St | remodel (e) bathroom - new tile - replace vanity and shower head and valve. shower pan.Details
remodel (e) bathroom - new tile - replace vanity and shower head and valve. shower pan. | $50,000 |
| Oct 10, 2023 | Completed final sign-off Mar 2025 | 1824 Jackson St | remodel kitchen, primary bath. work to include relocating structural wall. new plumbing fixtures, lighting, finishes, milllwork cabinetry to be added. no additinal sq footage. no horizontal or vertical expansions.Details
remodel kitchen, primary bath. work to include relocating structural wall. new plumbing fixtures, lighting, finishes, milllwork cabinetry to be added. no additinal sq footage. no horizontal or vertical expansions. | $350,000 |
| Oct 3, 2023 | Completed final sign-off Sep 2024 | 2578 Broadway | remodel existing bathroom. sink, tub, toilet, tiling, plumbing, electrical. all in-kind.Details
remodel existing bathroom. sink, tub, toilet, tiling, plumbing, electrical. all in-kind. | $70,000 |
| Jun 6, 2023 | Completed final sign-off Nov 2023 | 2509 Filbert St | (2) bathroom remodels. (2) fire place remodels, change front of fire place box to stone surround.Details
(2) bathroom remodels. (2) fire place remodels, change front of fire place box to stone surround. | $120,000 |
| Mar 30, 2023 | Completed final sign-off Oct 2025 | 858 25th Av | extend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side.Details
extend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side. | $100,000 |
| Feb 27, 2023 | Completed final sign-off Oct 2023 | 840 Lake St | #1: kitchen & bath remodel, demo kitchen & bathroom to studs ano structural install new kitchen cabinets and bathroom tileDetails
#1: kitchen & bath remodel, demo kitchen & bathroom to studs ano structural install new kitchen cabinets and bathroom tile | $80,000 |
| Aug 3, 2022 | Completed final sign-off Feb 2023 | 715 Cole St | replacement of (2) bathroom windows - 3rd floor. with 2 ft of property line. windows need replacement not moving the frame. swap in and swap out same opening. not visible from street same sizeDetails
replacement of (2) bathroom windows - 3rd floor. with 2 ft of property line. windows need replacement not moving the frame. swap in and swap out same opening. not visible from street same size | $3,000 |
| Jul 22, 2022 | In progress issued Nov 2024 | 44 Woodland Av | convert unconditioned grd fl storage and part of garage into family room, home office, and full bath. reconfigure (e) kitchen and powder room on 2nd floor. add scope 4/19/24- add (n) master suite bath and walk in closet on 3rd floor within (e) building envelopeDetails
convert unconditioned grd fl storage and part of garage into family room, home office, and full bath. reconfigure (e) kitchen and powder room on 2nd floor. add scope 4/19/24- add (n) master suite bath and walk in closet on 3rd floor within (e) building envelope | $145,000 |
| Jul 7, 2022 | Completed final sign-off Oct 2024 | 706 10th Av | interior remodel connecting the front of house to the (e) rear addition. reconfiguration of interior stairs. reconfiguring upper level bathroom & bedroom. reconfiguring of lower level suite & bathroom & kitchen remodeled. no sq ft. added. widening of garage door & garage area within (e) envelope.Details
interior remodel connecting the front of house to the (e) rear addition. reconfiguration of interior stairs. reconfiguring upper level bathroom & bedroom. reconfiguring of lower level suite & bathroom & kitchen remodeled. no sq ft. added. widening of garage door & garage area within (e) envelope. | $300,000 |
| Aug 3, 2021 | Completed final sign-off Nov 2023 | 715 Cole St | 1/f: add guest bedrm, bathrm, closet. extend (e) mechanical room. 2/f: expand kitchen, relocate dining room, convert bath into powder rm and closet. 3/f: remodel master bedrm, bathrm, remove chimney. roof replacementDetails
1/f: add guest bedrm, bathrm, closet. extend (e) mechanical room. 2/f: expand kitchen, relocate dining room, convert bath into powder rm and closet. 3/f: remodel master bedrm, bathrm, remove chimney. roof replacement | $150,000 |
| Jan 27, 2021 | Never finaled issued Jan 2021, no final | 674 Sanchez St | revision to pa# 202007170429. scope of work reduction. to delete bathroom remodel portion of project at 2nd floor.Details
revision to pa# 202007170429. scope of work reduction. to delete bathroom remodel portion of project at 2nd floor. | |
| Dec 9, 2020 | Completed final sign-off Mar 2021 | 1751 Silver Av | revision to bpa#201610210942; reduction in scope of work. 2/f-unit 2: no work done including new bathroom, closets, kitchen & all new walls not added except (e) roof deck repairs. 1/f: no work done @ new circular stair, (e) stair & door remain as is. (work not done for this project)Details
revision to bpa#201610210942; reduction in scope of work. 2/f-unit 2: no work done including new bathroom, closets, kitchen & all new walls not added except (e) roof deck repairs. 1/f: no work done @ new circular stair, (e) stair & door remain as is. (work not done for this project) | |
| Sep 19, 2020 | Completed final sign-off Jun 2021 | 728 Lyon St | 3rd floor: enlarge doorway betweeen room & hallway, add opening between dining & living room. reconfigure three bathrooms. basement: add 3 doorways & partition walls.Details
3rd floor: enlarge doorway betweeen room & hallway, add opening between dining & living room. reconfigure three bathrooms. basement: add 3 doorways & partition walls. | $70,000 |
| Aug 22, 2020 | Completed final sign-off Aug 2021 | 901 Guerrero St | #901 - interior renovation on 2nd floor. remodel kitchen, bath, poweder room. connect existing rooms 208 & 210 with framed openings. infill existing door opening at room 211 with 1-hour rated wall.Details
#901 - interior renovation on 2nd floor. remodel kitchen, bath, poweder room. connect existing rooms 208 & 210 with framed openings. infill existing door opening at room 211 with 1-hour rated wall. | $60,000 |
| Aug 22, 2020 | Completed final sign-off Jan 2022 | 72 Rossi Av | remodel (e) single family residence. 10 sq ft lightwell infill, interior remodel of kitchen and bathroom at level 2, interior remodel of stair in-kind, window replacement at front. new and in-kind replacement of windows at rear.Details
remodel (e) single family residence. 10 sq ft lightwell infill, interior remodel of kitchen and bathroom at level 2, interior remodel of stair in-kind, window replacement at front. new and in-kind replacement of windows at rear. | $450,000 |
| Jul 17, 2020 | Completed final sign-off May 2021 | 674 Sanchez St | 2/f: in kind remodel of kitchen and bathroom at 2nd floor. replace cabinetry, appliances, plumbing fixtures and countertops. no structural work at bath and kitchen. at rear elevation 2/f. replace redwood siding, and dryrot repair.Details
2/f: in kind remodel of kitchen and bathroom at 2nd floor. replace cabinetry, appliances, plumbing fixtures and countertops. no structural work at bath and kitchen. at rear elevation 2/f. replace redwood siding, and dryrot repair. | $72,000 |
| Nov 8, 2019 | Completed final sign-off Jan 2021 | 3872 19th St | minor alterations to lower level, including improvements to lighting and electrical,alterations to (e) bathroomDetails
minor alterations to lower level, including improvements to lighting and electrical,alterations to (e) bathroom | $40,000 |
| Oct 22, 2019 | Completed final sign-off Jan 2021 | 1250 Jones St | kitchen and bathroom remodel (e) samy layout.Details
kitchen and bathroom remodel (e) samy layout. | $209,000 |
| Aug 9, 2019 | Completed final sign-off Jun 2020 | 3318 California St | kitchen and master bathroom remodel extg. kitchen sq ft 48, new lighting in living room and bedrooms and hall. master bath sq ft 64. 5/8" sheetrock type "x". new engineerd flooring. replace extg engineered flooring. no alteration to wall.Details
kitchen and master bathroom remodel extg. kitchen sq ft 48, new lighting in living room and bedrooms and hall. master bath sq ft 64. 5/8" sheetrock type "x". new engineerd flooring. replace extg engineered flooring. no alteration to wall. | $200,000 |
| Mar 6, 2019 | Completed final sign-off Jul 2019 | 1990 Jefferson St | remodel master bathroom, guest bathroom, powder room and kitchen. no wall modification no structural work.Details
remodel master bathroom, guest bathroom, powder room and kitchen. no wall modification no structural work. | $100,000 |
| Jan 11, 2019 | Expired or cancelled expired Aug 2022 | 11 17th Av | enclose basement area under existing house with double height family room plus guest bedroom, exercise room and 2 baths. widen garage by incorporating adjacent hallwayDetails
enclose basement area under existing house with double height family room plus guest bedroom, exercise room and 2 baths. widen garage by incorporating adjacent hallway | $300,000 |
| Nov 26, 2018 | Completed final sign-off Jun 2019 | 523 Pierce St | remodel kitchen, (1) powder room, (1) master bathroom.Details
remodel kitchen, (1) powder room, (1) master bathroom. | $130,000 |
| Nov 26, 2018 | Completed final sign-off Jun 2019 | 1706 Vallejo St | remodel (2) bathrooms, kitchenDetails
remodel (2) bathrooms, kitchen | $230,000 |
| Sep 25, 2018 | Completed final sign-off Mar 2020 | 1937 Chestnut St | 3rd flr-demo wall betwn dning and kitchen. remodel kitch, bath & pwder rm, (n) drway from kitch to (e) hall. add (n) windows in kitch stair landing. replace (e) int doors. (n) stair to replace (e) stair from 3rd to 4th flr. (n) lts. 4th flr-demo wall betwn livrm & bedrm 2. remodel kitch, 2 bathsDetails
3rd flr-demo wall betwn dning and kitchen. remodel kitch, bath & pwder rm, (n) drway from kitch to (e) hall. add (n) windows in kitch stair landing. replace (e) int doors. (n) stair to replace (e) stair from 3rd to 4th flr. (n) lts. 4th flr-demo wall betwn livrm & bedrm 2. remodel kitch, 2 baths | $300,000 |
| Aug 21, 2018 | Completed final sign-off May 2019 | 101 States St | replace e windows and doors interior and exterior, see schedules. no changes bisible from street. n 24"x60" window at 3rd level. replce e interior wall at stairway. new recessed lighting at main level, move e sink at 3rd fl bathDetails
replace e windows and doors interior and exterior, see schedules. no changes bisible from street. n 24"x60" window at 3rd level. replce e interior wall at stairway. new recessed lighting at main level, move e sink at 3rd fl bath | $30,000 |
| Aug 10, 2018 | Never finaled issued Aug 2018, no final | 656 Douglass St | bathroom remodel, change out toilet, vanity (e), upgrade shower, bring electrical to code, seize 6'x7' sq ftDetails
bathroom remodel, change out toilet, vanity (e), upgrade shower, bring electrical to code, seize 6'x7' sq ft | $40,000 |
| Apr 4, 2018 | Completed final sign-off Dec 2018 | 1200 Gough St | kitchen and bathroom remodel - same location. replace fixtures, new can lights in kitchen, living room and bedroomDetails
kitchen and bathroom remodel - same location. replace fixtures, new can lights in kitchen, living room and bedroom | $70,000 |
| Jan 17, 2018 | Completed final sign-off Mar 2018 | 1438 Green St | unit # 2b kitchen & bathroom cabinet & replace fixtures in place, upgrade bathroom replace tub , vanity , sink & toilet. all same location plus tiling tub walls & floor, no walls moved, removed added or infilled all (e) layout to remain unchangedDetails
unit # 2b kitchen & bathroom cabinet & replace fixtures in place, upgrade bathroom replace tub , vanity , sink & toilet. all same location plus tiling tub walls & floor, no walls moved, removed added or infilled all (e) layout to remain unchanged | $80,000 |
| Nov 9, 2017 | Completed final sign-off Jul 2018 | 2028 Jefferson St | remodel existing kitchen, guest bathroom, master bathroom and powder room. maher n/aDetails
remodel existing kitchen, guest bathroom, master bathroom and powder room. maher n/a | $100,000 |
| Oct 5, 2017 | Completed final sign-off May 2018 | 2243 Fulton St | renovate (e) bathroom, convert closet to new bathroom, add pocket doors to (e) home office spacem replace cabinetry in kitchen, new lighting, remove interior service stair to garage.Details
renovate (e) bathroom, convert closet to new bathroom, add pocket doors to (e) home office spacem replace cabinetry in kitchen, new lighting, remove interior service stair to garage. | $45,000 |
| Aug 14, 2017 | Completed final sign-off Jul 2018 | 1080 Chestnut St | remodel existing 2 bathrooms and one kitchen + new lighting. no structural work - walls. n/a maherDetails
remodel existing 2 bathrooms and one kitchen + new lighting. no structural work - walls. n/a maher | $200,000 |
| Jul 31, 2017 | Completed final sign-off Nov 2017 | 858 25th Av | remodel 2 bathrooms.Details
remodel 2 bathrooms. | $125,000 |
| May 24, 2017 | Completed final sign-off Sep 2017 | 1310 Greenwich St | bathroom & kitchen remodel. n/a for maher.Details
bathroom & kitchen remodel. n/a for maher. | $70,000 |
| Feb 22, 2017 | Completed final sign-off Nov 2017 | 876 Douglass St | remodel (e) kitchen and (e) guest bathroom - new closet at foyer - remodel guest and master closets. no structural workDetails
remodel (e) kitchen and (e) guest bathroom - new closet at foyer - remodel guest and master closets. no structural work | $110,000 |
| Dec 19, 2016 | Completed final sign-off May 2017 | 2040 Franklin St | two bathrooms and one kitchen remodelDetails
two bathrooms and one kitchen remodel | $69,000 |
| Oct 21, 2016 | Completed final sign-off Mar 2021 | 1751 Silver Av | unit legalization ord #43-14. interior alteration only, no facade changes, no sq. ftge added, replace garage apt (bdrm, bath, kitchen) with new relocation of bdrm, bath, kitchen & living/rec rm on the (e) 1st flr.Details
unit legalization ord #43-14. interior alteration only, no facade changes, no sq. ftge added, replace garage apt (bdrm, bath, kitchen) with new relocation of bdrm, bath, kitchen & living/rec rm on the (e) 1st flr. | $40,000 |
| Sep 30, 2016 | Completed final sign-off Mar 2017 | 80 Denslowe Dr | remodel bathroom in kind; (n) plumbing, tile, fan, electrical; new shower pan & showerDetails
remodel bathroom in kind; (n) plumbing, tile, fan, electrical; new shower pan & shower | $20,000 |
| Sep 21, 2016 | Expired or cancelled expired Jul 2019 | 3872 19th St | demo bathroom and kitchenDetails
demo bathroom and kitchen | $2,000 |
| Jun 9, 2016 | Completed final sign-off Oct 2017 | 3118 22nd St | remove front car port enclosure. garage expansion & (e) deck expansion above. replace (e) primary entry stair @ side yard w/(n) stair.(n) slab @ proposed 1st flr habitable space/bath remodel. expansion of habitable space underneath (e) roof overhang.Details
remove front car port enclosure. garage expansion & (e) deck expansion above. replace (e) primary entry stair @ side yard w/(n) stair.(n) slab @ proposed 1st flr habitable space/bath remodel. expansion of habitable space underneath (e) roof overhang. | $100,000 |
| Jun 3, 2016 | Completed final sign-off Jul 2017 | 625 10th Av | renovation of (4) existing bathroom, kitchen, bedroom and add laundry room in garage.Details
renovation of (4) existing bathroom, kitchen, bedroom and add laundry room in garage. | $100,000 |
| Apr 12, 2016 | Completed final sign-off Oct 2017 | 3118 22nd St | new structural upgrade @ 1st flr. new structural work @ 2nd flr, new storage loft. interior reconfiguration of walls @ 1st & 2nd flrs. new fixtures & finishes in (e) bathroom & kitchen, 1 new bath @ 2nd flr. 2 new skylightsDetails
new structural upgrade @ 1st flr. new structural work @ 2nd flr, new storage loft. interior reconfiguration of walls @ 1st & 2nd flrs. new fixtures & finishes in (e) bathroom & kitchen, 1 new bath @ 2nd flr. 2 new skylights | $275,000 |
| Jan 25, 2016 | Completed final sign-off Jun 2016 | 501 Bella Vista Wy | bathroom remodel. new gas line to fireplace.Details
bathroom remodel. new gas line to fireplace. | $40,000 |
| Nov 6, 2015 | Expired or cancelled cancelled Jan 2026 | 11 17th Av | non-structural changes to ceiling joists, replace (e) clu joists & raise for higher ceiling in bedroom, bath, closet & study, revision to 201507171781.Details
non-structural changes to ceiling joists, replace (e) clu joists & raise for higher ceiling in bedroom, bath, closet & study, revision to 201507171781. | $5,600 |
| Sep 21, 2015 | Completed final sign-off Nov 2016 | 135 Cedro Av | bathroom remodel: new lights in living area. radiant floors.Details
bathroom remodel: new lights in living area. radiant floors. | $100,000 |
| Sep 11, 2015 | Completed final sign-off Jan 2016 | 2330 40th Av | legalize bathroom & living space, remove stove & kitchen area in garage level.Details
legalize bathroom & living space, remove stove & kitchen area in garage level. | $6,000 |
| Jul 31, 2015 | Completed final sign-off Nov 2015 | 1825 15th St | apt #2: (3) bathrooms; replace tile on floor and walls. swap out plumbing fixtures and existing electrical fixtures. no walls moved, removed, added or infilled. all existing layouts to remain unchanged.Details
apt #2: (3) bathrooms; replace tile on floor and walls. swap out plumbing fixtures and existing electrical fixtures. no walls moved, removed, added or infilled. all existing layouts to remain unchanged. | $20,000 |
| Jul 17, 2015 | Completed final sign-off Apr 2016 | 11 17th Av | bath remodel with new fixtures & finishes, add lights @ bedroom, new cabinet in study. remove extg window and add 2 windows. not visible from street at rear wall.Details
bath remodel with new fixtures & finishes, add lights @ bedroom, new cabinet in study. remove extg window and add 2 windows. not visible from street at rear wall. | $50,000 |
| Jun 29, 2015 | Completed final sign-off Nov 2015 | 358 San Carlos St | replace tile in master bathroom, new fire wall,upgrade shower fixtures, replace sink in both bathrooms, build walk in closet, add light in bedroom, add 2 skylights.Details
replace tile in master bathroom, new fire wall,upgrade shower fixtures, replace sink in both bathrooms, build walk in closet, add light in bedroom, add 2 skylights. | $20,000 |
| May 26, 2015 | Completed final sign-off Sep 2015 | 2040 Franklin St | remodel bath & closet. all fire rated assemblies to be maintained. no structural work. non combustible framing. lighting shall be he or vacancy sensors (min 1 he)Details
remodel bath & closet. all fire rated assemblies to be maintained. no structural work. non combustible framing. lighting shall be he or vacancy sensors (min 1 he) | $30,000 |
| Mar 25, 2015 | Completed final sign-off Aug 2015 | 425 Upper Tr | apt #1: kitchen and bathroom remodel.Details
apt #1: kitchen and bathroom remodel. | $18,000 |
| Feb 25, 2015 | Completed final sign-off Jul 2015 | 1137 Taylor St | two bathroom remodel and kitchen remodel. no walls to be moved (no structural). fixtures and finishes only.Details
two bathroom remodel and kitchen remodel. no walls to be moved (no structural). fixtures and finishes only. | $65,000 |
| Sep 19, 2014 | Completed final sign-off Nov 2015 | 132 Ewing Tr | adding one bath @ office, remodle bath & replace (e) windows @ ground (garage) floor. remodel 2 bathroom & windows @ 2nd floor.Details
adding one bath @ office, remodle bath & replace (e) windows @ ground (garage) floor. remodel 2 bathroom & windows @ 2nd floor. | $160,000 |
| Sep 16, 2014 | Completed final sign-off Nov 2014 | 2328 California St | retile 3 bathrooms and remodel extg kitchen in kind.Details
retile 3 bathrooms and remodel extg kitchen in kind. | $48,000 |
| Dec 13, 2013 | Completed final sign-off Mar 2014 | 386 Hill St | remodel (1) bathroom main floor & remodel (1) showser area top floor, new tiling & new showerpan, no change in fixture configuration.Details
remodel (1) bathroom main floor & remodel (1) showser area top floor, new tiling & new showerpan, no change in fixture configuration. | $26,000 |
| Oct 30, 2013 | Completed final sign-off May 2014 | 521 Pierce St | bathroom remodel - new tub, shower, sink, new ceiling lights, new tile on floor & shower, new toilet, new ceiling fan.Details
bathroom remodel - new tub, shower, sink, new ceiling lights, new tile on floor & shower, new toilet, new ceiling fan. | $20,000 |
| Sep 12, 2013 | Completed final sign-off Jan 2014 | 2934 Folsom St | front bldg - remodel 2 bathrooms & kitchen - no change in wall, window & door.Details
front bldg - remodel 2 bathrooms & kitchen - no change in wall, window & door. | $45,000 |
| Jun 17, 2013 | Completed final sign-off Aug 2013 | 876 Douglass St | bathroom remodel. new shower, new vanity, new toilet, new electrical. move non-baring wall 5 inches. install ceiling fan. all plmg for shower, washer and dryer and toilet and sink.Details
bathroom remodel. new shower, new vanity, new toilet, new electrical. move non-baring wall 5 inches. install ceiling fan. all plmg for shower, washer and dryer and toilet and sink. | $13,000 |
| May 15, 2013 | Completed final sign-off Aug 2013 | 874 Douglass St | 2 bathroom remodel-convert storage area to bedroom, convert/remodel 1 closet into 1 bathroom with closet & remodel/relocate (e) bathroomDetails
2 bathroom remodel-convert storage area to bedroom, convert/remodel 1 closet into 1 bathroom with closet & remodel/relocate (e) bathroom | $35,000 |
| Oct 25, 2012 | Completed final sign-off Dec 2012 | 135 Red Rock Wy | bathroom - upgrade cabinets and center vanity.Details
bathroom - upgrade cabinets and center vanity. | $6,500 |
| Sep 25, 2012 | Completed final sign-off Mar 2013 | 115 Moffitt St | extend ground floor out 2'6 to match 2nd fl rear wall above. replace rear deck in kind. to include master bedroom and bath, windows and door toward rear yardDetails
extend ground floor out 2'6 to match 2nd fl rear wall above. replace rear deck in kind. to include master bedroom and bath, windows and door toward rear yard | $30,000 |
| May 23, 2011 | Completed final sign-off Oct 2011 | 475 Diamond St | kitchen remodel. bathroom remodel. convert closet into laundry room. all work on unit 475 at 2nd floor. lighting changes must comply with cec 150(k)Details
kitchen remodel. bathroom remodel. convert closet into laundry room. all work on unit 475 at 2nd floor. lighting changes must comply with cec 150(k) | $24,000 |
| Apr 21, 2011 | Completed final sign-off Jul 2012 | 1683 37th Av | horizontal extension @ 1st floor & interior remodel. add bedroom & bath. rebuild (e) interior stairs. 2nd floor remodel: new roof deck, new doors to deck in (e) opennings, new furnace.Details
horizontal extension @ 1st floor & interior remodel. add bedroom & bath. rebuild (e) interior stairs. 2nd floor remodel: new roof deck, new doors to deck in (e) opennings, new furnace. | $65,000 |
| Mar 21, 2011 | Completed final sign-off Sep 2011 | 19 Delmar St | selective interior remodeling of an extg 3 story wood framed s.f.d./foundation work and seismic strenthening at garage and 1st floor. replacement of kitchen wndws and door at rear. redo 2 bthrms/reconfigure/relocate (1) bathroom.Details
selective interior remodeling of an extg 3 story wood framed s.f.d./foundation work and seismic strenthening at garage and 1st floor. replacement of kitchen wndws and door at rear. redo 2 bthrms/reconfigure/relocate (1) bathroom. | $65,000 |
| Sep 16, 2010 | Completed final sign-off Apr 2011 | 481 Diamond St | remodel 1st fl interior per plan, remodel kitchen, remodel 2 e full baths, 1 1/2 bath, replace e wd burning replace all e elum windows with n alunew stucco and redwood, replace with open mtl gaurdrailDetails
remodel 1st fl interior per plan, remodel kitchen, remodel 2 e full baths, 1 1/2 bath, replace e wd burning replace all e elum windows with n alunew stucco and redwood, replace with open mtl gaurdrail | $95,000 |
| Aug 27, 2010 | Completed final sign-off Dec 2010 | 700 Ulloa St | minor bath upgrade not to include moving walls or structural work. new tire and shower pan.Details
minor bath upgrade not to include moving walls or structural work. new tire and shower pan. | $5,000 |
| Apr 26, 2010 | Completed final sign-off Jul 2010 | 900 Clayton St | convert storage room into full bathroom at 1st floor.Details
convert storage room into full bathroom at 1st floor. | $12,500 |
| Sep 21, 2009 | Completed final sign-off Dec 2009 | 4901 17th St | remodeling (e) bathroom, tile work, change fixtures, tub, toilet, sink in same location, upgrade lighting, furring out walls at 2nd floor (one bathroom only). no structural workDetails
remodeling (e) bathroom, tile work, change fixtures, tub, toilet, sink in same location, upgrade lighting, furring out walls at 2nd floor (one bathroom only). no structural work | $7,700 |