Robert Smith
- Listed as
- architect, designer, engineer
- Firm
- Smithworks Engineering
- Based in
- Mill Valley
- On San Francisco permits
- May 2014 to Jun 2026
23 permits since 2000 (engineer on 17 permits, architect on 6 permits, designer on 1 permit): 8 completed, 8 in progress, 3 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 23, 2026 | In progress issued Jun 2026 | 3352 Market St | Citidev Inc. | revision to 202512161885 adding a grade beam below a shear wall on the existing structural plan. engineer assumed e foundation adequate for support but not deep enough. plumbingb fixtures in e downstiars bath are directly on ltop of new grade beam location so had to remove for access and reinstallDetails
revision to 202512161885 adding a grade beam below a shear wall on the existing structural plan. engineer assumed e foundation adequate for support but not deep enough. plumbingb fixtures in e downstiars bath are directly on ltop of new grade beam location so had to remove for access and reinstall | $25,000 |
| May 29, 2026 | In progress issued Jun 2026 | 100 California St | West Coast Build Aka Fairway Constructio | revision to pa# 202512192291, to show changes in design to vestibule, structural drawings included.Details
revision to pa# 202512192291, to show changes in design to vestibule, structural drawings included. | |
| Feb 6, 2026 | In progress issued Jul 2026 | 3342 Fulton St | Wei Li Construction | additions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and closets.Details
additions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and closets. | $230,000 |
| Dec 19, 2025 | In progress issued Feb 2026 | 100 California St | West Coast Build Aka Fairway Constructio | 1st floor: new fidelity investment center. new partitions and office, new ducts, power, & lighting.Details
1st floor: new fidelity investment center. new partitions and office, new ducts, power, & lighting. | $1,134,601 |
| Dec 16, 2025 | In progress issued Feb 2026 | 3352 Market St | Citidev Inc. | interior renovation and small rear addition totaling 32 sq ft. this work includes new finishes, fixtures, casework, lighting, plumbing, and electircal at the kitchen, bath #1 and bath #2. will required electrical panel upgrade and full remodel of knob and tube. new siding at the facade attached to..Details
interior renovation and small rear addition totaling 32 sq ft. this work includes new finishes, fixtures, casework, lighting, plumbing, and electircal at the kitchen, bath #1 and bath #2. will required electrical panel upgrade and full remodel of knob and tube. new siding at the facade attached to.. | $650,000 |
| Nov 12, 2025 | In progress issued Jun 2026 | 1909 Broderick St | Macken Construction | foundation replacement and basement addition including 770sf of unconditioned storage /mechanical space. site retaining wall and stairDetails
foundation replacement and basement addition including 770sf of unconditioned storage /mechanical space. site retaining wall and stair | $115,000 |
| Aug 14, 2025 | In progress issued Nov 2025 | 104 11th Av | horizontal addition on all three floors. build a new foundation throughout and lower garage level 1'-0" replace all exterior doors and windows. interior remodel throughout. new 150 sqft rear deck.Details
horizontal addition on all three floors. build a new foundation throughout and lower garage level 1'-0" replace all exterior doors and windows. interior remodel throughout. new 150 sqft rear deck. | $190,000 | |
| Jan 31, 2024 | In progress issued Jan 2024 | 1691 21st Av | Rinaldi Construction | revision to 202310185958 additional hold downs & structural upgrade to st facade framing and in-kind replacement of stucco in frontDetails
revision to 202310185958 additional hold downs & structural upgrade to st facade framing and in-kind replacement of stucco in front | |
| Oct 25, 2022 | Completed final sign-off May 2025 | 1231 19th Av | addition of a 375 sq. ft. accessory dwelling unit (adu) to 1st floor of an existing 3-story, 6 unit apartment building under the state program.Details
addition of a 375 sq. ft. accessory dwelling unit (adu) to 1st floor of an existing 3-story, 6 unit apartment building under the state program. | $92,500 | |
| Jul 6, 2022 | Expired or cancelled expired Apr 2026 | 6 August Al | Rinaldi Construction | alter (e) 2 unit bldg: 1st fl add usable space @ (n) media room/den add 2 ext'r doors, window & access stair @ south facade add bathrm, relocate furnace. 2nd fl replace (e) deck & stair, add door & window, 3rd fl relocate bath modify stair (n) ext'r glazed assembly north facade, (n) balconyDetails
alter (e) 2 unit bldg: 1st fl add usable space @ (n) media room/den add 2 ext'r doors, window & access stair @ south facade add bathrm, relocate furnace. 2nd fl replace (e) deck & stair, add door & window, 3rd fl relocate bath modify stair (n) ext'r glazed assembly north facade, (n) balcony | $950,000 |
| May 16, 2022 | Completed final sign-off Feb 2024 | 3801 Jackson St | Jeff King And Company Inc | infill @ southwest corner of house, relocate rear yard wall, & dormer addition @ 4/f. fire sprinklers under bpa#202010025799Details
infill @ southwest corner of house, relocate rear yard wall, & dormer addition @ 4/f. fire sprinklers under bpa#202010025799 | $110,000 |
| Feb 9, 2022 | Never finaled issued Apr 2022, no final | 760 Elizabeth St | Ronan O'dea Inc Dba O'dea Ronan Inc | basement: remodel to add guest bedroom, laundry room, bathroom and office. 1/f: kitchen and dining room remodel, new staircase to basement. 2/f: bathroom remodel.Details
basement: remodel to add guest bedroom, laundry room, bathroom and office. 1/f: kitchen and dining room remodel, new staircase to basement. 2/f: bathroom remodel. | $260,000 |
| Oct 29, 2021 | Completed final sign-off Feb 2024 | 3801 Jackson St | Jeff King And Company Inc | relocating garage doors, driveways, and curb cuts from jackson st. to cherry st.Details
relocating garage doors, driveways, and curb cuts from jackson st. to cherry st. | $25,000 |
| Jul 2, 2020 | Completed final sign-off Sep 2023 | 670 28th Av | revision to foundation of extg permit app#201912240449Details
revision to foundation of extg permit app#201912240449 | $2,500 | |
| Aug 17, 2018 | Completed final sign-off Apr 2019 | 39 Wawona St | James E Martinez Dba Geological Design | kitchen remodel in extg location. no change in house foot printDetails
kitchen remodel in extg location. no change in house foot print | $38,500 |
| Sep 14, 2017 | Expired or cancelled cancelled Nov 2019 | 1231 19th Av | soft story retrofit per sfebc chapter 4d: fema p-807. garage door infill.Details
soft story retrofit per sfebc chapter 4d: fema p-807. garage door infill. | $12,500 | |
| Aug 9, 2017 | Completed final sign-off Dec 2017 | 3560 Baker St | Plath & Company Inc | interior remodel, replace wopod floor in selected area at lower level, alterations to lower level bathroom, open 1 wall between rooms, add beam at ceiling and closet. n/a ordinance #155-13Details
interior remodel, replace wopod floor in selected area at lower level, alterations to lower level bathroom, open 1 wall between rooms, add beam at ceiling and closet. n/a ordinance #155-13 | $40,000 |
| Jun 15, 2017 | Completed final sign-off Dec 2021 | 2527 Mcallister St | convert & excavate 1/f storage area to habitable space. facade workDetails
convert & excavate 1/f storage area to habitable space. facade work | $194,750 | |
| Dec 13, 2016 | Expired or cancelled cancelled May 2022 | 70 Lurline St | create an 8'x13' 2-story sideyard infill addition to an (e) 2-story single family home. 1st fl of addition is for laundry area. 2nd fl of addition for master bedroom expansion. remodel storage on 1st fl into office, guest room & bath.Details
create an 8'x13' 2-story sideyard infill addition to an (e) 2-story single family home. 1st fl of addition is for laundry area. 2nd fl of addition for master bedroom expansion. remodel storage on 1st fl into office, guest room & bath. | $81,800 | |
| Nov 18, 2016 | Never finaled issued Feb 2018, no final | 526 04th Av | convert rear area of garage to 2nd unit 700 sq ft. expand 2nd flr family rm. infill 6' 10" 137 sq ft. expand 3rd flr bdrms 10' 6" into rear yard 220 sq ft.Details
convert rear area of garage to 2nd unit 700 sq ft. expand 2nd flr family rm. infill 6' 10" 137 sq ft. expand 3rd flr bdrms 10' 6" into rear yard 220 sq ft. | $195,000 | |
| Jul 12, 2016 | Expired or cancelled withdrawn May 2017 | 3518 Webster St | construct hoistway for 2 stop elevator. remodel e bathroom, and closet near hoistway. legalize full bath, guest room, and laundry rm at lower level maher not reqDetails
construct hoistway for 2 stop elevator. remodel e bathroom, and closet near hoistway. legalize full bath, guest room, and laundry rm at lower level maher not req | $47,500 | |
| Jan 15, 2015 | Completed final sign-off May 2017 | 1386 Masonic Av | Mascheroni Construction | 97 sq ft kitchen addition. 185 sq ft (n) deck.Details
97 sq ft kitchen addition. 185 sq ft (n) deck. | $19,500 |
| May 29, 2014 | Never finaled issued Jun 2014, no final | 770 Guerrero St | Newel&Co.Inc. Dba:Robertson- Jensen &Co. | interior alteration of door opening in family room, kitchen remodel, bathroom remodel, relocation of laundry, replace 4 windows not visible in street. all work in top floor unit only.Details
interior alteration of door opening in family room, kitchen remodel, bathroom remodel, relocation of laundry, replace 4 windows not visible in street. all work in top floor unit only. | $60,000 |