Judith Mattingly
- Listed as
- architect, engineer
- Firm
- Mattingly Thaler Archit.
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Feb 2026
19 permits since 2000 (architect on 18 permits, engineer on 1 permit): 12 completed, 1 in progress, 2 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 6, 2026 | In progress issued Jul 2026 | 3342 Fulton St | Wei Li Construction | additions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and closets.Details
additions to rear of house at first, second, and third floor. new stair to connect first and second floors, convert rear storage space to office, reconfigure and remodel third floor bathrooms and closets. | $230,000 |
| Aug 25, 2025 | Completed final sign-off May 2026 | 3625 19th St | San Francisco Design Build | remodel kitchen and bathroom, replace bath, kitchen and hallway windows. move bedroom wall, add closet.Details
remodel kitchen and bathroom, replace bath, kitchen and hallway windows. move bedroom wall, add closet. | $68,000 |
| Sep 12, 2024 | Completed final sign-off Mar 2025 | 101 Lombard St | rev to pa# 2024-0523-2874: to remove the interior (e) straight and install a spiral stair fill in stair opening and decrease opening at spiral stair relapce (e) 8' door with glass panel and replace (e) glass panel with 8' door. unit# 11eDetails
rev to pa# 2024-0523-2874: to remove the interior (e) straight and install a spiral stair fill in stair opening and decrease opening at spiral stair relapce (e) 8' door with glass panel and replace (e) glass panel with 8' door. unit# 11e | $23,000 | |
| Sep 11, 2024 | Completed final sign-off Oct 2025 | 858 25th Av | North Bay Construction | rev 202303304778: foundation revision to remove and replace (e) substandard foundation.Details
rev 202303304778: foundation revision to remove and replace (e) substandard foundation. | $2,000 |
| Jun 28, 2023 | Completed final sign-off Jan 2024 | 4659 18th St | North Bay Construction | remodel kitchen with new applilances and cabinets; relocate sink, install electric washer and dryer; convert a swinging door to a pocket door between office and kitchen.Details
remodel kitchen with new applilances and cabinets; relocate sink, install electric washer and dryer; convert a swinging door to a pocket door between office and kitchen. | $115,000 |
| Mar 30, 2023 | Completed final sign-off Oct 2025 | 858 25th Av | North Bay Construction | extend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side.Details
extend (e) 1st room to rear lot. the addition is a family room with full bath and kitchenette. extend (e) 2nd flr deck over the top of the addition. the stair from the deck is relocated to the side. | $100,000 |
| Feb 3, 2023 | Completed final sign-off Aug 2023 | 455 Connecticut St | Crown Construction San Francisco | revision to 202103317570. expand existing roof deck to front of second floor wall, and to side of second floor wall. move railing to edge of existing roof.Details
revision to 202103317570. expand existing roof deck to front of second floor wall, and to side of second floor wall. move railing to edge of existing roof. | $5,000 |
| Jul 28, 2022 | Completed final sign-off May 2026 | 1919 47th Av | 2-story rear addition with primary bedroom suite, guest bedroom and family room. relocate & remodel 1st fl bath & laundry. remodel (e) 2nd fl bathroom. relocate 2nd fl kitchen. enlarge entry stairs. widen & recess garage door. widen entry gate. add deck & stair at rear of house.Details
2-story rear addition with primary bedroom suite, guest bedroom and family room. relocate & remodel 1st fl bath & laundry. remodel (e) 2nd fl bathroom. relocate 2nd fl kitchen. enlarge entry stairs. widen & recess garage door. widen entry gate. add deck & stair at rear of house. | $500,000 | |
| May 17, 2022 | Never finaled issued Jun 2022, no final | 2542 15th Av | Reed Design Dba Design Solutions | replace rear exterior stair with new wood stair. repair deteriorated front stucco, repair front stairs for dryrot (no structural work front stairs)Details
replace rear exterior stair with new wood stair. repair deteriorated front stucco, repair front stairs for dryrot (no structural work front stairs) | $15,000 |
| Aug 31, 2021 | Completed final sign-off Jun 2022 | 3249 Pacific Av | North Bay Construction | remove part of wall between kitchen and family room, remodel kitchen, relocate 2 windows, add lighting.Details
remove part of wall between kitchen and family room, remodel kitchen, relocate 2 windows, add lighting. | $80,000 |
| Nov 18, 2020 | Never finaled issued Apr 2021, no final | 2542 15th Av | Siteline Construction | addition under existing main floor. remodel lower level to include 2 bedrooms, 1 bathroom, and 1 laundry. remove wall between kitchen and dining room and remodel kitchen. remodel main floor bathroom & add a bathroom in the rear main floor room. widen the existing internal stairDetails
addition under existing main floor. remodel lower level to include 2 bedrooms, 1 bathroom, and 1 laundry. remove wall between kitchen and dining room and remodel kitchen. remodel main floor bathroom & add a bathroom in the rear main floor room. widen the existing internal stair | $150,000 |
| Feb 7, 2020 | Expired or cancelled withdrawn Oct 2020 | 890 El Camino Del Mar | North Bay Construction | rev to p#201904248783: move (e) conc stair towards the street 6ft; move elevator vestibule door.Details
rev to p#201904248783: move (e) conc stair towards the street 6ft; move elevator vestibule door. | $10,000 |
| Dec 31, 2019 | Completed final sign-off Dec 2020 | 4252 21st St | Anstirman Construction | relocate kitchen, remodel (e) bath, add bath in (e) laundry area, add 2 skylights. convert (e) to new master bedroom.Details
relocate kitchen, remodel (e) bath, add bath in (e) laundry area, add 2 skylights. convert (e) to new master bedroom. | $80,000 |
| Jun 17, 2019 | Expired or cancelled expired Aug 2022 | 11 17th Av | North Bay Construction | replace sloped tile roof with taller flat roof. replace windows with painted wood casement windows. add wood trim at windows and brackets at roofing. only the front 4' of the building is affected.Details
replace sloped tile roof with taller flat roof. replace windows with painted wood casement windows. add wood trim at windows and brackets at roofing. only the front 4' of the building is affected. | $15,000 |
| Jun 6, 2019 | Expired or cancelled cancelled Jan 2026 | 11 17th Av | North Bay Construction | revision to 201901110116 voluntary stregthening of the front portion of the house foundation on addition to the original proposed scopeDetails
revision to 201901110116 voluntary stregthening of the front portion of the house foundation on addition to the original proposed scope | $50,000 |
| Apr 24, 2019 | Completed final sign-off Jan 2021 | 890 El Camino Del Mar | North Bay Construction | construct an elevator enclosure along the east side of the house, connecting (4) levels of the house.Details
construct an elevator enclosure along the east side of the house, connecting (4) levels of the house. | $88,000 |
| Jan 11, 2019 | Expired or cancelled expired Aug 2022 | 11 17th Av | North Bay Construction | enclose basement area under existing house with double height family room plus guest bedroom, exercise room and 2 baths. widen garage by incorporating adjacent hallwayDetails
enclose basement area under existing house with double height family room plus guest bedroom, exercise room and 2 baths. widen garage by incorporating adjacent hallway | $300,000 |
| Jul 17, 2015 | Completed final sign-off Apr 2016 | 11 17th Av | North Bay Construction | bath remodel with new fixtures & finishes, add lights @ bedroom, new cabinet in study. remove extg window and add 2 windows. not visible from street at rear wall.Details
bath remodel with new fixtures & finishes, add lights @ bedroom, new cabinet in study. remove extg window and add 2 windows. not visible from street at rear wall. | $50,000 |
| Jul 21, 2014 | Completed final sign-off Mar 2017 | 232 Guerrero St | Kl Construction Group | addition to rear of bldg on 3rd floor including 1 bath, 1 bedroom, 1 personal office and exercise roomDetails
addition to rear of bldg on 3rd floor including 1 bath, 1 bedroom, 1 personal office and exercise room | $98,000 |