Jason Powers
- Listed as
- architect, engineer
- Firm
- Zfa Structural Engineers
- Based in
- San Francisco
- On San Francisco permits
- Feb 2019 to Oct 2026
97 permits since 2000 (engineer on 94 permits, architect on 3 permits): 44 completed, 45 in progress, 2 never finaled, 6 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 2, 2026 | In progress filed Oct 2026, not yet issued | 60 Laidley St | minor footprint revisions: smaller bay wdw at front, recessed front entry, expansion under (ew) roof at rear and into (e) crawlspace. interior layout updates. new siding, new exterior doors and windows.Details
minor footprint revisions: smaller bay wdw at front, recessed front entry, expansion under (ew) roof at rear and into (e) crawlspace. interior layout updates. new siding, new exterior doors and windows. | $490,000 | |
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 315 Amber Dr | remodel of existing 1965 house, including remodel of kitchen, 2 baths and increased height of front rooms on level 2. ground fl addition to fill in existing soft story: extended garage/storage area. new entry and office/bedroom. remodel of existing entry to include new bath and laundry room locationDetails
remodel of existing 1965 house, including remodel of kitchen, 2 baths and increased height of front rooms on level 2. ground fl addition to fill in existing soft story: extended garage/storage area. new entry and office/bedroom. remodel of existing entry to include new bath and laundry room location | $575,000 | |
| Sep 17, 2026 | In progress filed Sep 2026, not yet issued | 273 Dolores St | Kadon Construction | erect type vb 2-story adu residence in rear of yard.Details
erect type vb 2-story adu residence in rear of yard. | $235,000 |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 2652 Broadway | Stroub Construction | the project scope: interior remodel of a existing 3 story building including: relocation & remodel of kitchen and 4 bathrooms. add addition of the half bath. exterior work is limited to relocation in-kind of select windows on east facade, & enlargement of the window on north side at 3rd floor.Details
the project scope: interior remodel of a existing 3 story building including: relocation & remodel of kitchen and 4 bathrooms. add addition of the half bath. exterior work is limited to relocation in-kind of select windows on east facade, & enlargement of the window on north side at 3rd floor. | $1,230,000 |
| Aug 21, 2026 | In progress filed Aug 2026, not yet issued | 265 Page St | interior remodel & conversion of non-habitable area to habitable space, kitchen remodel, add 1 bathrooom, no additional dwelling unit, no change of alteration of street facade, replace rear windowsDetails
interior remodel & conversion of non-habitable area to habitable space, kitchen remodel, add 1 bathrooom, no additional dwelling unit, no change of alteration of street facade, replace rear windows | $150,000 | |
| Aug 21, 2026 | In progress filed Aug 2026, not yet issued | 307 Moultrie St | interior remodel to relocate stairs and make code complaint. kitchen remodel and adding/replacing dormer, adding/replacing windows, and replacing doors.Details
interior remodel to relocate stairs and make code complaint. kitchen remodel and adding/replacing dormer, adding/replacing windows, and replacing doors. | $350,000 | |
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 135 27th Av | construction of new adu in rear lot yard, type v-b, 2-story adu.Details
construction of new adu in rear lot yard, type v-b, 2-story adu. | $170,000 | |
| Jul 14, 2026 | In progress filed Jul 2026, not yet issued | 135 27th Av | partial remodel of an existing detached garage.Details
partial remodel of an existing detached garage. | $15,000 | |
| Jun 25, 2026 | In progress filed Jun 2026, not yet issued | 3160 Jackson St | revision to 202203220486, to the superstructure and soil shoring for excavation of basement to incorporate the effects of the shoring of the project at 50 predisio.Details
revision to 202203220486, to the superstructure and soil shoring for excavation of basement to incorporate the effects of the shoring of the project at 50 predisio. | ||
| May 21, 2026 | In progress issued Jul 2026 | 200 Dolores St | Amd General Construction Inc | replacement of 2 deteriorated beams in kind, remove/repl the subfloor balcony on (2nd and 3rd floors).put new torch down roof. separate hot works permit req'd from sffdDetails
replacement of 2 deteriorated beams in kind, remove/repl the subfloor balcony on (2nd and 3rd floors).put new torch down roof. separate hot works permit req'd from sffd | $30,000 |
| May 19, 2026 | In progress filed May 2026, not yet issued | 99 Manchester St | Leafair Construction | remove (e) wood stairs + supports from 1st fl to ground level add new wood deck (composite decking) w/ aluminum spiral stair. replace (e) wood door @ rear w/ same. replace (e) first floor rear elev. alum windows w/ same. replace (e) on grade conc slab w/ pavers. remove rear facade shingles and..Details
remove (e) wood stairs + supports from 1st fl to ground level add new wood deck (composite decking) w/ aluminum spiral stair. replace (e) wood door @ rear w/ same. replace (e) first floor rear elev. alum windows w/ same. replace (e) on grade conc slab w/ pavers. remove rear facade shingles and.. | $100,000 |
| May 4, 2026 | In progress issued May 2026 | 85 05th Av | Barrett Karber Built Llc | revision to pa# 202509094858: this revision omits foundation work along gridline 1 between d and e9. the existing footing was found to have sufficient embedment and bearing capacity.Details
revision to pa# 202509094858: this revision omits foundation work along gridline 1 between d and e9. the existing footing was found to have sufficient embedment and bearing capacity. | |
| Apr 9, 2026 | In progress filed Apr 2026, not yet issued | 35 Commonwealth Av | excavate & lower ground floor for new habitable space. interior remodel at all floors, new garage door and driveway, new interior stairs, removal of (2) fireplaces. new skylight, no expansion of existingDetails
excavate & lower ground floor for new habitable space. interior remodel at all floors, new garage door and driveway, new interior stairs, removal of (2) fireplaces. new skylight, no expansion of existing | $500,000 | |
| Apr 8, 2026 | In progress issued Apr 2026 | 1270 11th Av | revision to pa#: 202508284100. resizing existing shaft. relocation of proposed fireplace in bedroom 1. inclusion of interior elevations. addition of structural details for load bearing walls.Details
revision to pa#: 202508284100. resizing existing shaft. relocation of proposed fireplace in bedroom 1. inclusion of interior elevations. addition of structural details for load bearing walls. | $8,000 | |
| Feb 25, 2026 | In progress issued Mar 2026 | 2038 Powell St | non combustible open slat screen and overhang on north side of the side yard. no interior renovation proposed.Details
non combustible open slat screen and overhang on north side of the side yard. no interior renovation proposed. | $2,000 | |
| Feb 12, 2026 | In progress filed Feb 2026, not yet issued | 80 San Fernando Wy | D V Rasmussen & Son Inc. | new basement excavation & replace (e) foundation walls. rebuild main level sunroom, trellis & chemney in same location (like for like). re-frame & strenhthen roof framing. replace garage door. new exterior windows, doors in (e) locations, new exterior paint. new partitions. interior finishes,Details
new basement excavation & replace (e) foundation walls. rebuild main level sunroom, trellis & chemney in same location (like for like). re-frame & strenhthen roof framing. replace garage door. new exterior windows, doors in (e) locations, new exterior paint. new partitions. interior finishes, | $750,000 |
| Feb 6, 2026 | In progress issued Apr 2026 | 371 31st Av | revision to pa # 2024-0426-0879: family rm flooring & lighting reno, walk-in closet reno, garage lighting & elec reno, retaining wall structural detail revisions, rear yard material changes from impervious to perviouse misc field revisionsDetails
revision to pa # 2024-0426-0879: family rm flooring & lighting reno, walk-in closet reno, garage lighting & elec reno, retaining wall structural detail revisions, rear yard material changes from impervious to perviouse misc field revisions | $12,000 | |
| Jan 27, 2026 | In progress issued Jan 2026 | 120 San Buenaventura Wy | Mone Construction Co Inc | placement of new retaining wall at rear of property to replace existing.Details
placement of new retaining wall at rear of property to replace existing. | $45,000 |
| Jan 8, 2026 | In progress issued Jul 2026 | 83 Mirabel Av | Planart Construction Corp | vertical addition. renovation throughout (e) 1st & 2nd floor. horizontal addition @ rear. 3rd story addition includes new kitchen, bath & living space. new rear yard stairs & deck require for fire access & secondary egress. new siding, doors, windows & roof. no work within rear yard setback.Details
vertical addition. renovation throughout (e) 1st & 2nd floor. horizontal addition @ rear. 3rd story addition includes new kitchen, bath & living space. new rear yard stairs & deck require for fire access & secondary egress. new siding, doors, windows & roof. no work within rear yard setback. | $475,000 |
| Dec 24, 2025 | In progress issued Feb 2026 | 117 Fair Oaks St | Creggan Construction Inc | demo & renovate condition area of (e) basement. 125 sf conditioned addition to (e) basement below (e) floors. conditioned area renovation to include: 1 (n) bedroom, 1 (n) bathroom. demo (e) closets at 1st fl to create (n) interior stair to basement. no expansion to building massing. no other changesDetails
demo & renovate condition area of (e) basement. 125 sf conditioned addition to (e) basement below (e) floors. conditioned area renovation to include: 1 (n) bedroom, 1 (n) bathroom. demo (e) closets at 1st fl to create (n) interior stair to basement. no expansion to building massing. no other changes | $175,000 |
| Oct 25, 2025 | In progress issued Feb 2026 | 3718 20th St | Mueller Nicholls Inc | interior renovation. no veritcal or horizontal addition. preserving the front facade. replace vinyl windows on the front facade with wood windows. changes to fenestrations on other facades, not readily visible from public right of way. approx 12" partial expansion of ground floor garage intoDetails
interior renovation. no veritcal or horizontal addition. preserving the front facade. replace vinyl windows on the front facade with wood windows. changes to fenestrations on other facades, not readily visible from public right of way. approx 12" partial expansion of ground floor garage into | $1,750,000 |
| Oct 16, 2025 | In progress issued Mar 2026 | 85 05th Av | Barrett Karber Built Llc | renovation & expansion of (e) 1-story sfd into a 2-story 2752sf sfd and 268sf habitable roof open air roof deck. new construction of reinforced foundation and expansion of erection of structure, hardscaping, landscape design, plumbing and electrical upgrades and finishes.Details
renovation & expansion of (e) 1-story sfd into a 2-story 2752sf sfd and 268sf habitable roof open air roof deck. new construction of reinforced foundation and expansion of erection of structure, hardscaping, landscape design, plumbing and electrical upgrades and finishes. | $950,000 |
| Oct 1, 2025 | In progress issued Feb 2026 | 3217 Baker St | Colindres & Associates | horizontal addition to barhroom on 3/f.replace window in kind at front facade. enclose (e) lightwell. new hallway & renovation of (e) family room on 1/f. renovation of (e) kitchen & bathrooms on 2/f.Details
horizontal addition to barhroom on 3/f.replace window in kind at front facade. enclose (e) lightwell. new hallway & renovation of (e) family room on 1/f. renovation of (e) kitchen & bathrooms on 2/f. | $250,655 |
| Sep 10, 2025 | In progress issued Dec 2025 | 2755 Scott St | Ashbury Gen Constructing & Eng | revision to bpa 202309116282 to include a voluntary foundation strengthening while maintaining the existing unconditioned space. changes have noted with revision 3 clouds.Details
revision to bpa 202309116282 to include a voluntary foundation strengthening while maintaining the existing unconditioned space. changes have noted with revision 3 clouds. | $37,000 |
| Aug 28, 2025 | In progress issued Sep 2025 | 1270 11th Av | repair work due to fire damage. 1st fl: replace & repair (e) damaged adu; 2nd fl: replace and remodel (e) damaged dining & kitchen; remodel family room & interior finishes on rest of fl; restore and repair interior finishes; remodel (e) prim bedroom w/closets & dressing/office area.Details
repair work due to fire damage. 1st fl: replace & repair (e) damaged adu; 2nd fl: replace and remodel (e) damaged dining & kitchen; remodel family room & interior finishes on rest of fl; restore and repair interior finishes; remodel (e) prim bedroom w/closets & dressing/office area. | $650,000 | |
| Jul 3, 2025 | In progress issued Sep 2025 | 432 Dewey Bl | Ramos General Construction Inc. | renovate the (e) playroom into a master bathroom. renovate the (e) bedroom closet to provide for stairs to the room above the (e) garage. (e) storage room above the garage to be renovated into an office and closet w/ 8' ceiling.Details
renovate the (e) playroom into a master bathroom. renovate the (e) bedroom closet to provide for stairs to the room above the (e) garage. (e) storage room above the garage to be renovated into an office and closet w/ 8' ceiling. | $75,000 |
| Jun 26, 2025 | In progress filed Jun 2025, not yet issued | 483 16th Av | Stonebridge Construction Inc | remove (e) foundation and replace with (n). remove (e) level 1 wood fl and replace with new concrete slab fl at lower elevation. add new interior walls on lower level, along with (n) bath & (n) kitchenette. remove (e) wood stair from lvl 2 & replace with (n) wood stair. (n) conditioned spaceDetails
remove (e) foundation and replace with (n). remove (e) level 1 wood fl and replace with new concrete slab fl at lower elevation. add new interior walls on lower level, along with (n) bath & (n) kitchenette. remove (e) wood stair from lvl 2 & replace with (n) wood stair. (n) conditioned space | $275,000 |
| May 15, 2025 | Completed final sign-off Feb 2026 | 31 Romain St | Devlin/Mcnally Construction | demo e bathroom closet and bedroom at ground fl. extend gr floor and reonvate for a master bedroom suite with closet and bath and a new bedroom. deck to extend above over horizontal expansion.Details
demo e bathroom closet and bedroom at ground fl. extend gr floor and reonvate for a master bedroom suite with closet and bath and a new bedroom. deck to extend above over horizontal expansion. | $125,000 |
| May 1, 2025 | Completed final sign-off Jul 2026 | 389 27th St | North Dream Construction Inc | 3rd floor addition/renovation: extend (e) facade up, replacing the 3rd floor deck with (2) new bedrooms, (e) 3rd floor siting room to be renovated to become a hall and full bathroom.Details
3rd floor addition/renovation: extend (e) facade up, replacing the 3rd floor deck with (2) new bedrooms, (e) 3rd floor siting room to be renovated to become a hall and full bathroom. | $260,000 |
| Apr 24, 2025 | In progress issued Aug 2025 | 3845 26th St | Bay Home Remodeling | horizontal addition to (e) 2-unit residential bldg. new front windows. new front doors at entry, in-kind. renovation throughout levels 1-4. new stair core. new rear decks. 4-new dormers at level 4 with skylight. new sprinkler throughout levels 1-4. renovate bathrooms and 2-kitchens. new rear windowsDetails
horizontal addition to (e) 2-unit residential bldg. new front windows. new front doors at entry, in-kind. renovation throughout levels 1-4. new stair core. new rear decks. 4-new dormers at level 4 with skylight. new sprinkler throughout levels 1-4. renovate bathrooms and 2-kitchens. new rear windows | $501,000 |
| Apr 22, 2025 | In progress issued Apr 2026 | 3001 Pacific Av | Rod Heisler Construction | interior remodel(e)5-story sfr w/10-bedrooms, 6-full baths and 8-half baths w/new roof terrace @(e)roof lvl, horizontal addition of new single story w/roof terrace. interior remodel to(e) 1-story detached garage to include new interior pool. new count to be 7-bedrooms, 8-full baths and 4-half baths.Details
interior remodel(e)5-story sfr w/10-bedrooms, 6-full baths and 8-half baths w/new roof terrace @(e)roof lvl, horizontal addition of new single story w/roof terrace. interior remodel to(e) 1-story detached garage to include new interior pool. new count to be 7-bedrooms, 8-full baths and 4-half baths. | $2,500,000 |
| Apr 17, 2025 | Completed final sign-off Oct 2025 | 2038 Powell St | Bingo Builders | revision to pa 202410102716 replace and relocate existing stair and door to studio entranceDetails
revision to pa 202410102716 replace and relocate existing stair and door to studio entrance | $6,000 |
| Apr 14, 2025 | In progress issued Aug 2025 | 461 Anderson St | Blackline Construction | 1/f: replace garage door, enclose lightwell, remodel (e) bathroom, family room/den, add mudroom & storage room. 2/f: enclose (e) lightwell, add half bath, relocate (e) full bathroom, remodel kitchen.Details
1/f: replace garage door, enclose lightwell, remodel (e) bathroom, family room/den, add mudroom & storage room. 2/f: enclose (e) lightwell, add half bath, relocate (e) full bathroom, remodel kitchen. | $180,000 |
| Jan 29, 2025 | In progress issued May 2025 | 475 Jersey St | Andrew G Construction | interior remodel condition portion of garage floor two new bedrooms and one new bathroom new laundry mep closet mudroom and storage. excavate rear yard to create new terrace new deck at gradeDetails
interior remodel condition portion of garage floor two new bedrooms and one new bathroom new laundry mep closet mudroom and storage. excavate rear yard to create new terrace new deck at grade | $25,000 |
| Jan 24, 2025 | Completed final sign-off Jul 2025 | 2582 Clay St | O'sullivan & Son Construction Inc | revision to pa# 2024-1202-5893 revision to lower exterior deck foot print & deck foundationDetails
revision to pa# 2024-1202-5893 revision to lower exterior deck foot print & deck foundation | |
| Jan 14, 2025 | Completed final sign-off Apr 2026 | 2400 Green St | Crown Construction San Francisco | revision to pa#: 202402236422. reconfiguratoin of basement, relocate exterior door and pg&e gas meter.Details
revision to pa#: 202402236422. reconfiguratoin of basement, relocate exterior door and pg&e gas meter. | |
| Jan 1, 2025 | Completed final sign-off Feb 2026 | 1 Northgate Dr | Javier Magana Construction Services | interior remodel: expand habitable space @ first floor, new plumbing and electrical. replace front exterior stairs, replace interior stairs, new steps @ rear yardDetails
interior remodel: expand habitable space @ first floor, new plumbing and electrical. replace front exterior stairs, replace interior stairs, new steps @ rear yard | $400,000 |
| Dec 17, 2024 | Completed final sign-off Jul 2026 | 761 Kansas St | Bbc Construction Inc. | (n) 246 sf roof deck. (n) 45 sf headhouse to provide an enclosed stair access to the roof deck. new 42" glass guardrail @ perimeterDetails
(n) 246 sf roof deck. (n) 45 sf headhouse to provide an enclosed stair access to the roof deck. new 42" glass guardrail @ perimeter | $350,000 |
| Dec 3, 2024 | Completed final sign-off Jul 2025 | 117 Fair Oaks St | Creggan Construction Inc | replace e non conforming exterior rear stair at e 2 family home in kind. add landing and rotate stair at lowest 4 treads to clear e bay window above. this modification approved per pre app meeting on july 29, 2024 stairs are a required second means of egressDetails
replace e non conforming exterior rear stair at e 2 family home in kind. add landing and rotate stair at lowest 4 treads to clear e bay window above. this modification approved per pre app meeting on july 29, 2024 stairs are a required second means of egress | $18,000 |
| Dec 3, 2024 | Completed final sign-off Jul 2025 | 115 Fair Oaks St | Creggan Construction Inc | replace e non conforming exterior rear stair at e 2 family home in kind. add landing and rotate stair at lowest 4 treads to clear e bay window above. this modification approved per pre app meeting on july 29, 2024 stairs are a required second means of egressDetails
replace e non conforming exterior rear stair at e 2 family home in kind. add landing and rotate stair at lowest 4 treads to clear e bay window above. this modification approved per pre app meeting on july 29, 2024 stairs are a required second means of egress | $18,000 |
| Dec 2, 2024 | In progress issued Jul 2025 | 620 Ortega St | rear yard remodel includes: existing deck and concrete patio to be removed, new retaining wall, new wood deck, new concrete stair and landing to lower yard area, new hot tub to be installed on wood deck.Details
rear yard remodel includes: existing deck and concrete patio to be removed, new retaining wall, new wood deck, new concrete stair and landing to lower yard area, new hot tub to be installed on wood deck. | $98,000 | |
| Nov 7, 2024 | In progress issued Feb 2025 | 701 Buena Vista West Av | alter site to pa 202207138359 - fill in 47sf building notch on 2/f for kitchen use.Details
alter site to pa 202207138359 - fill in 47sf building notch on 2/f for kitchen use. | $12,784 | |
| Oct 23, 2024 | In progress issued Jan 2025 | 475 Jersey St | Andrew G Construction | revision to pa #202406275393. structural revisions to foundation to support added geotechnical report.Details
revision to pa #202406275393. structural revisions to foundation to support added geotechnical report. | |
| Oct 21, 2024 | Completed final sign-off Jul 2026 | 49 Elsie St | Blackline Construction | the scope of work involves: removal and replacement of an existing exterior wood framed deck and stair structure in the rear yard of a single family home.Details
the scope of work involves: removal and replacement of an existing exterior wood framed deck and stair structure in the rear yard of a single family home. | $20,000 |
| Oct 10, 2024 | In progress issued Oct 2024 | 2038 Powell St | Plus One Construction Inc, Bingo Builders | renovation of existing 2 family dwelling. no expasion, 1 bath to be added, minor reconfiguration of walls and doors. remodel 2 kitchens and 3 bathroomsDetails
renovation of existing 2 family dwelling. no expasion, 1 bath to be added, minor reconfiguration of walls and doors. remodel 2 kitchens and 3 bathrooms | $100,000 |
| Oct 1, 2024 | Completed final sign-off Feb 2026 | 452 Molimo Dr | structural remodel of sfr including adding family room/bathroom to unfinished basement with new interior stairs, remodel kitchen, windows/doors, new finishes in 2nd floor bath, new laundry room. new basement slab/footing w/ perimter foundation, ~44" tall retaining wall. no shoring required.Details
structural remodel of sfr including adding family room/bathroom to unfinished basement with new interior stairs, remodel kitchen, windows/doors, new finishes in 2nd floor bath, new laundry room. new basement slab/footing w/ perimter foundation, ~44" tall retaining wall. no shoring required. | $238,000 | |
| Sep 30, 2024 | Expired or cancelled cancelled Jun 2026 | 572 Hill St | Achill Beg Construction Inc | scope of wok includeds shoring design for pa#: 202208160669Details
scope of wok includeds shoring design for pa#: 202208160669 | $150,000 |
| Sep 26, 2024 | Completed final sign-off Mar 2026 | 55 San Buenaventura Wy | Andrew Gallagher Construction | in kind window & door replacements (all sides) (n) doors at rear of home. bathroom remodels. alterd space at basement level. new interior stairs replacing existing from 1st to basement. new wet bar at first fl, select (n) lighting & electrical throughout. (e) chimney at rear to be removed.Details
in kind window & door replacements (all sides) (n) doors at rear of home. bathroom remodels. alterd space at basement level. new interior stairs replacing existing from 1st to basement. new wet bar at first fl, select (n) lighting & electrical throughout. (e) chimney at rear to be removed. | $371,458 |
| Sep 25, 2024 | Completed final sign-off Jul 2025 | 2580 Clay St | O'sullivan & Son Construction Inc | renovation of (e) kitchen and bathrooms. main floor bathroom exterior wall to be infilled to align with footprint of (e) floor above. (e) fixtures to be replaced. new lighting, electrical, and exhaust fans to be installed. (2) new awning windows to be installed at bathrooms, (2) new sliding doors toDetails
renovation of (e) kitchen and bathrooms. main floor bathroom exterior wall to be infilled to align with footprint of (e) floor above. (e) fixtures to be replaced. new lighting, electrical, and exhaust fans to be installed. (2) new awning windows to be installed at bathrooms, (2) new sliding doors to | $87,000 |
| Aug 12, 2024 | Completed final sign-off Mar 2025 | 4438 17th St | Luxury Construction Llc | voluntary structural upgrades at foundation only. replacement concrete patio at rear yard w/drain. replacement concrete landing at front yard in kind (inside property line, connections to (e) storm water utilites). no interior workDetails
voluntary structural upgrades at foundation only. replacement concrete patio at rear yard w/drain. replacement concrete landing at front yard in kind (inside property line, connections to (e) storm water utilites). no interior work | $86,000 |
| Jun 27, 2024 | In progress issued Jul 2024 | 475 Jersey St | Andrew G Construction | kitchen remodel on 2nd fl. new stair to replace existing stair from garage. remove load bearing wall aadjacent to kitchen. new electrical and lighting @ area of workDetails
kitchen remodel on 2nd fl. new stair to replace existing stair from garage. remove load bearing wall aadjacent to kitchen. new electrical and lighting @ area of work | $40,000 |
| Jun 24, 2024 | Completed final sign-off Jan 2025 | 862 34th Av | revision to bpa# 202402236488: 65 sq ft bathroom addition. includes (n) toilet room and walk in shower. addition of landing and steps out to the rear yardDetails
revision to bpa# 202402236488: 65 sq ft bathroom addition. includes (n) toilet room and walk in shower. addition of landing and steps out to the rear yard | $78,000 | |
| May 28, 2024 | In progress filed May 2024, not yet issued | 2153 Lake St | Jeff King And Company Inc | reconfig of interior structural and non structural walls, (n) kitchen, (n) powder, (n) hvac and hw, (n) windows and ext door.Details
reconfig of interior structural and non structural walls, (n) kitchen, (n) powder, (n) hvac and hw, (n) windows and ext door. | $200,000 |
| Apr 26, 2024 | In progress issued Jul 2024 | 371 31st Av | replace front windows in-kind, replace rear & side windows & siding. rebuild e) rear deckto rear yard. partial infill lightwell @ 1st/f. 1st/f: demo powder rm, add bath. 2nd/f: add hank sink & exhaust. refinish e) shower & laundry area. demo wall btw kitchen & dining. n)165 sf habitable. roof improvDetails
replace front windows in-kind, replace rear & side windows & siding. rebuild e) rear deckto rear yard. partial infill lightwell @ 1st/f. 1st/f: demo powder rm, add bath. 2nd/f: add hank sink & exhaust. refinish e) shower & laundry area. demo wall btw kitchen & dining. n)165 sf habitable. roof improv | $78,000 | |
| Apr 25, 2024 | Expired or cancelled cancelled Aug 2024 | 3877 Jackson St | Custom Construction Enterprises | remodel of (e) 3-story, 2-unit historic bldg w/ udu including legalization of udu to adu, new interior finishes, fixtures, & lighting, replacement of (e) windows (except front windows), new roofing, removal of (e) rear decks, code upgrades to stairs & path of egress, paint & repair exterior finishesDetails
remodel of (e) 3-story, 2-unit historic bldg w/ udu including legalization of udu to adu, new interior finishes, fixtures, & lighting, replacement of (e) windows (except front windows), new roofing, removal of (e) rear decks, code upgrades to stairs & path of egress, paint & repair exterior finishes | $2,581,520 |
| Mar 27, 2024 | Completed final sign-off Nov 2024 | 715 Ashbury St | Deep Elm Construction Llc | revision to 202302101835: revision to size of new elevated rear yard deck, stair and firewall. deck elevation less than 10ft from grade. no work visible from street.Details
revision to 202302101835: revision to size of new elevated rear yard deck, stair and firewall. deck elevation less than 10ft from grade. no work visible from street. | $10,000 |
| Mar 8, 2024 | In progress issued Mar 2024 | 1679 35th Av | revision to pa# 2021-0629-3442; remove ground floor scoope of work from pa# 2021-06293442Details
revision to pa# 2021-0629-3442; remove ground floor scoope of work from pa# 2021-06293442 | ||
| Feb 27, 2024 | Completed final sign-off May 2024 | 766 30th Av | American Builders | new rear second floor deck with sliding doorDetails
new rear second floor deck with sliding door | $15,000 |
| Jan 10, 2024 | In progress filed Jan 2024, not yet issued | 238 Fillmore St | remodel of multi-family residence / duplex. work includes:rear facade reconfiguration and remodel,interior layout (kitchen and bathroom) remodel, basement floor excavation & new foundation, structural upgrades, new exterior stair to access rear yard.Details
remodel of multi-family residence / duplex. work includes:rear facade reconfiguration and remodel,interior layout (kitchen and bathroom) remodel, basement floor excavation & new foundation, structural upgrades, new exterior stair to access rear yard. | $400,000 | |
| Dec 29, 2023 | Completed final sign-off May 2025 | 1616 Shrader St | Kadon Construction | renovate 2 full baths & laundry at 3/f, w/new floors throughtout, replace 2 fireplaces w/gas appliance, kitchen remodel and 2 new openings at 2/f, select new windows, new interior doors, new lighting and plumb fixtures @ areas altered. removal of 2 fire escapes, w/new sprinklers along path of egressDetails
renovate 2 full baths & laundry at 3/f, w/new floors throughtout, replace 2 fireplaces w/gas appliance, kitchen remodel and 2 new openings at 2/f, select new windows, new interior doors, new lighting and plumb fixtures @ areas altered. removal of 2 fire escapes, w/new sprinklers along path of egress | $84,000 |
| Dec 15, 2023 | In progress issued Apr 2024 | 2302 Steiner St | two fl. reclamation of eastern ligtwell to bring basement stair to code, remodel of int spaces on 1st fl., reconfigure of north facade to accommodate (n) door to courtyard exterior modifications incl (n) patio in (e) courtyard, opening the southern wall of unconditiond garage &Details
two fl. reclamation of eastern ligtwell to bring basement stair to code, remodel of int spaces on 1st fl., reconfigure of north facade to accommodate (n) door to courtyard exterior modifications incl (n) patio in (e) courtyard, opening the southern wall of unconditiond garage & | $237,000 | |
| Nov 17, 2023 | In progress issued Jul 2024 | 601 Ortega St | Christopher Gate Construction Inc | remodel (e) 4-bedrooms, kitchen, living/dining rooms, (3) full bathrooms, (2) (n)powder rooms, & laundry relocation. exterior, (2) new windows east facingn & (1) (n) window west facing.Details
remodel (e) 4-bedrooms, kitchen, living/dining rooms, (3) full bathrooms, (2) (n)powder rooms, & laundry relocation. exterior, (2) new windows east facingn & (1) (n) window west facing. | $590,000 |
| Oct 27, 2023 | Completed final sign-off Apr 2024 | 3439 Sacramento St | O'dwyer Construction Inc | revision to pa 2022-1025-5112 changes include addition of a glass guardrail, adjustments to planter and bench configurationDetails
revision to pa 2022-1025-5112 changes include addition of a glass guardrail, adjustments to planter and bench configuration | |
| Sep 14, 2023 | Completed final sign-off Feb 2025 | 140 Edgehill Wy | D K G Construction Inc | revision to pa# 202010176696 due to changes in (e) structural conditions of the building as requested by city inspector.Details
revision to pa# 202010176696 due to changes in (e) structural conditions of the building as requested by city inspector. | $50,000 |
| Sep 5, 2023 | In progress issued Mar 2024 | 1067 Green St | revision to pa# 202212087894. foundation strengthening of existing building, and alterations at basement level.Details
revision to pa# 202212087894. foundation strengthening of existing building, and alterations at basement level. | $85,000 | |
| Aug 25, 2023 | Completed final sign-off Jan 2024 | 4428 23rd St | Kilrea Construction Inc. | revision to permit 201812128116 to include retaining wall at rear yard per inspectors request to address complaint#: 202307010Details
revision to permit 201812128116 to include retaining wall at rear yard per inspectors request to address complaint#: 202307010 | $20,000 |
| Jul 28, 2023 | Completed final sign-off Jan 2026 | 250 Locust St | Mueller Nicholls Inc | renovation, window additions @ set-back stucco portion of (e) bldg, no changes to brick elevations/building height. structural stregthening @ ground/f, roof deck w/in (e)stem walls. no visible adjustments from public way.Details
renovation, window additions @ set-back stucco portion of (e) bldg, no changes to brick elevations/building height. structural stregthening @ ground/f, roof deck w/in (e)stem walls. no visible adjustments from public way. | $800,000 |
| Jun 20, 2023 | Expired or cancelled expired Jan 2026 | 357 Cumberland St | Cook Construction | revision to pa# 202003116723. addition of (n) below grade unconditioned storage room. 157 sqft. approc 67 cy of excavation.Details
revision to pa# 202003116723. addition of (n) below grade unconditioned storage room. 157 sqft. approc 67 cy of excavation. | $55,735 |
| May 8, 2023 | Completed final sign-off Sep 2023 | 35 Dolores Tr | Luxury Construction Llc | voluntary seismic strengthening of (e) 3-story, 2-unit residence @ ground floor w/steel moment frame around the (e) garage doorDetails
voluntary seismic strengthening of (e) 3-story, 2-unit residence @ ground floor w/steel moment frame around the (e) garage door | $25,000 |
| Feb 21, 2023 | Expired or cancelled withdrawn Mar 2023 | 238 Fillmore St | renovation of extg duplex: rear facade reconfiguration, interior layout (bathroom and kitchen). remodel, basement excavation and structural upgradeDetails
renovation of extg duplex: rear facade reconfiguration, interior layout (bathroom and kitchen). remodel, basement excavation and structural upgrade | $200,000 | |
| Feb 10, 2023 | Completed final sign-off Sep 2023 | 30 Walnut St | Arrow Builders Inc | revision to pa #202206277136. window replacement at 3rd floor and recessed floor at 2nd floor kitchen hall.Details
revision to pa #202206277136. window replacement at 3rd floor and recessed floor at 2nd floor kitchen hall. | $10,000 |
| Feb 3, 2023 | Completed final sign-off Aug 2023 | 455 Connecticut St | Crown Construction San Francisco | revision to 202103317570. expand existing roof deck to front of second floor wall, and to side of second floor wall. move railing to edge of existing roof.Details
revision to 202103317570. expand existing roof deck to front of second floor wall, and to side of second floor wall. move railing to edge of existing roof. | $5,000 |
| Nov 23, 2022 | Completed final sign-off Oct 2023 | 2020 Laguna St | repair and replace failing retaining wall at rear side property line. retaining wall at 10 feet or less to maintain existing grade.Details
repair and replace failing retaining wall at rear side property line. retaining wall at 10 feet or less to maintain existing grade. | $10,000 | |
| Nov 22, 2022 | Never finaled issued Aug 2023, no final | 3675 Clay St | Design Line Construction | horizontal addition. renovation on all floors.Details
horizontal addition. renovation on all floors. | $650,000 |
| Nov 3, 2022 | Completed final sign-off Mar 2024 | 1772 Vallejo St | Add A Garage Inc. | voluntary strengthening of existing brick masonry foundation. the strengthening compris of a conditions grade bram around the prrimeter existing brick masonry walls & replacement of isolated interior brick masonry pad footings with a contitions footing.Details
voluntary strengthening of existing brick masonry foundation. the strengthening compris of a conditions grade bram around the prrimeter existing brick masonry walls & replacement of isolated interior brick masonry pad footings with a contitions footing. | $20,000 |
| Sep 27, 2022 | Expired or cancelled withdrawn Oct 2025 | 2471 Washington St | conversion of the (e) one story commercial building into a two-unit residential building. scope includes the demolition of the (e) detached garage (under separate form 6 pa202208261357) and a four story vertical addition of residential occupancy.Details
conversion of the (e) one story commercial building into a two-unit residential building. scope includes the demolition of the (e) detached garage (under separate form 6 pa202208261357) and a four story vertical addition of residential occupancy. | $2,400,000 | |
| Sep 1, 2022 | Completed final sign-off Nov 2025 | 341 Hugo St | repair & replace fixtures in kind @ 4 (e) baths,repair(e)kitchen & replace fixtures,update & ground(e)outlets in all beds as needed.replace in kind 9 broken windows w/ wood clad tempered.3u value in kind @ same location,(e)exterior trim to be re-used.Details
repair & replace fixtures in kind @ 4 (e) baths,repair(e)kitchen & replace fixtures,update & ground(e)outlets in all beds as needed.replace in kind 9 broken windows w/ wood clad tempered.3u value in kind @ same location,(e)exterior trim to be re-used. | $78,000 | |
| Aug 26, 2022 | Expired or cancelled withdrawn Sep 2022 | 2471 Washington St | conversion of the (e) one story commercial building into a two-unit residential building. scope includes the demolition of the (e) detached garage (under separate form 6 pa202208261357) and a four story vertical addition of residential occupancy.Details
conversion of the (e) one story commercial building into a two-unit residential building. scope includes the demolition of the (e) detached garage (under separate form 6 pa202208261357) and a four story vertical addition of residential occupancy. | $2,400,000 | |
| Aug 16, 2022 | Completed final sign-off Jun 2026 | 572 Hill St | Achill Beg Construction Inc | horizontal addition, addition of a garage and interior remodel.Details
horizontal addition, addition of a garage and interior remodel. | $571,845 |
| Aug 3, 2022 | Completed final sign-off Jul 2024 | 2020 Laguna St | minor interior remodel & atrium infill: 2 kitchens & 4 baths remodels, convert atrium into habitable space for both floors, 2 new skylightsDetails
minor interior remodel & atrium infill: 2 kitchens & 4 baths remodels, convert atrium into habitable space for both floors, 2 new skylights | $50,000 | |
| Jul 29, 2022 | Completed final sign-off May 2023 | 562 Flood Av | kitchen remodel, enclose and relocate (e) stairs, remove the wall between kitchen and dining room, new skylightDetails
kitchen remodel, enclose and relocate (e) stairs, remove the wall between kitchen and dining room, new skylight | $48,000 | |
| Jul 28, 2022 | Completed final sign-off Sep 2024 | 17 Commonwealth Av | Clayton Timbrell & Co | partial remodel of sfd compromised of 2story over basement. foundation replacement, restoration of rear facade due to water infiltration dmg. replacement of ext cladding (in kind) and replacement of windows for dbl paned throughout.Details
partial remodel of sfd compromised of 2story over basement. foundation replacement, restoration of rear facade due to water infiltration dmg. replacement of ext cladding (in kind) and replacement of windows for dbl paned throughout. | $100,000 |
| Jul 1, 2022 | In progress issued Jan 2026 | 144 Laidley St | Barron Construction Inc. | bldg a: erect 4-story over 1 basement, type 5b, single family dwelling with 1 adu. project to include lot split. (demo under pa# 202207017611. new construction bldg b pa# 202207017622).Details
bldg a: erect 4-story over 1 basement, type 5b, single family dwelling with 1 adu. project to include lot split. (demo under pa# 202207017611. new construction bldg b pa# 202207017622). | $1,500,000 |
| May 25, 2022 | In progress issued Apr 2024 | 3756 Jackson St | Clayton Timbrell & Co | renovation of sfr. sow includes lower ground fl to create compliant ceiling height & upgrade fl layout. kitchen & bath remodel on all fl. lower 3rd fl ceiling height. exterior window & roof waterproofing / finishes. gh# 863-450-5651. ** maher: yes **Details
renovation of sfr. sow includes lower ground fl to create compliant ceiling height & upgrade fl layout. kitchen & bath remodel on all fl. lower 3rd fl ceiling height. exterior window & roof waterproofing / finishes. gh# 863-450-5651. ** maher: yes ** | $1,200,000 |
| Jan 19, 2022 | Completed final sign-off Jun 2023 | 2832 Sacramento St | Ben Hardy & Company | repair and replace existing rear yard landscape wood. retaining walls to concrete retaining walls with shallow footing.Details
repair and replace existing rear yard landscape wood. retaining walls to concrete retaining walls with shallow footing. | $20,000 |
| Nov 3, 2021 | Completed final sign-off Aug 2025 | 4100 Folsom St | add adu unit at ground floor per government code section 65852.2. new rear deck, remodel interior staircase and 2nd floor closet, new rear spiral staircase to 2nd floor, 2nd floor bathroom remodel, new double door to existing closet.Details
add adu unit at ground floor per government code section 65852.2. new rear deck, remodel interior staircase and 2nd floor closet, new rear spiral staircase to 2nd floor, 2nd floor bathroom remodel, new double door to existing closet. | $220,000 | |
| Nov 1, 2021 | Completed final sign-off Mar 2023 | 1006 Capitol Av | revision of pa# 201909050729 s1 - r1: revise propertiy line foundation retaining walls to be designed for an undrained condition, (e) slab on grade to be demolished and replaced in kindDetails
revision of pa# 201909050729 s1 - r1: revise propertiy line foundation retaining walls to be designed for an undrained condition, (e) slab on grade to be demolished and replaced in kind | ||
| Oct 19, 2021 | Completed final sign-off Mar 2023 | 4085 Cesar Chavez St | Millsap Degnan & Associates | comply w/ not #201999598: repair existing retaining wall between the subject property and the adjacent neighbor at 4095 cesar chavez reference pa #202012019988.Details
comply w/ not #201999598: repair existing retaining wall between the subject property and the adjacent neighbor at 4095 cesar chavez reference pa #202012019988. | |
| Aug 31, 2021 | Completed final sign-off Jun 2022 | 3249 Pacific Av | North Bay Construction | remove part of wall between kitchen and family room, remodel kitchen, relocate 2 windows, add lighting.Details
remove part of wall between kitchen and family room, remodel kitchen, relocate 2 windows, add lighting. | $80,000 |
| Jul 8, 2021 | Never finaled filed Jul 2021, never issued | 2353 North Point St | relocate and enlarge garage door; alter third floor balcony, alter second and third floor railing, front facade changes including windows, gate, access door, rear facade addition at first floor, add spiral staircase, minor alteration to top floorDetails
relocate and enlarge garage door; alter third floor balcony, alter second and third floor railing, front facade changes including windows, gate, access door, rear facade addition at first floor, add spiral staircase, minor alteration to top floor | $50,000 | |
| Dec 3, 2020 | Completed final sign-off Feb 2023 | 1401 Lyon St | Seth Bernstein | voluntary foundation upgrade and sructural strengthening. kitchen and bath remodel, interior work only. no exterior work.Details
voluntary foundation upgrade and sructural strengthening. kitchen and bath remodel, interior work only. no exterior work. | $25,000 |
| Dec 2, 2020 | Completed final sign-off Jun 2021 | 1625 North Point St | Haley & Aldrich Construction Services | open up interior walls; update kitchen at rear of ground fl unit; update ground fl bathroom; update materials at shared ground fl spaces. no change to upper unit or exterior.Details
open up interior walls; update kitchen at rear of ground fl unit; update ground fl bathroom; update materials at shared ground fl spaces. no change to upper unit or exterior. | $75,000 |
| Oct 23, 2020 | Completed final sign-off Aug 2021 | 91 Commonwealth Av | Bergquist Builders | rev to pa# 201907176106: fence replacement & voluntary strengthing, project consist of a modification to the work previously permitted pa# 201907176106 ,but not yet completed, modifications include new voluntary strengthing and adding shetting to walls, new shear wall & footing, replace (e) fence,Details
rev to pa# 201907176106: fence replacement & voluntary strengthing, project consist of a modification to the work previously permitted pa# 201907176106 ,but not yet completed, modifications include new voluntary strengthing and adding shetting to walls, new shear wall & footing, replace (e) fence, | $40,000 |
| Nov 19, 2019 | Completed final sign-off Aug 2022 | 2531 Larkin St | Kieran Collins Construction, Puac Construction Llc | gr fl new partitions for new bedroom, new bath, media rm. 2nd fl new windows rear, new internal partitions, kitchen bath remodels, 3rd fl new dormers at rear and lightwell for new 2 bath, 2 bdrms, lower deck at rear, new deck at frontDetails
gr fl new partitions for new bedroom, new bath, media rm. 2nd fl new windows rear, new internal partitions, kitchen bath remodels, 3rd fl new dormers at rear and lightwell for new 2 bath, 2 bdrms, lower deck at rear, new deck at front | $400,000 |
| Nov 5, 2019 | Completed final sign-off Jul 2021 | 3742 Divisadero St | S A Baxter Inc. | revision 201710050524, removal of setback of front facade, addition bay window bump and addition of skylight at master bathDetails
revision 201710050524, removal of setback of front facade, addition bay window bump and addition of skylight at master bath | $5,000 |
| Oct 8, 2019 | Completed final sign-off Oct 2021 | 2640 Broderick St | The Toboni Group | voluntary seismic strengthening for existing single family dwellingDetails
voluntary seismic strengthening for existing single family dwelling | $50,000 |
| Feb 13, 2019 | Completed final sign-off Mar 2025 | 2898 Vallejo St | Ashbury Gen Constructing & Eng | revision to pa# 2017-0223-9944s. infill of (e) lightwell on 4th flr, east side. new elevator. ** maher n/a**Details
revision to pa# 2017-0223-9944s. infill of (e) lightwell on 4th flr, east side. new elevator. ** maher n/a** |