Brent Martin
- Listed as
- architect, authorized agent-others
- Firm
- Martin Partners
- Based in
- San Francisco
- On San Francisco permits
- Oct 2020 to Dec 2024
14 permits since 2000 (architect on 13 permits, authorized agent-others on 1 permit): 12 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 4, 2024 | In progress filed Dec 2024, not yet issued | 681 12th Av | Via Construction | revision 202202117855 and boa 202403147835- change glass type on north and south facades from tinted to clear low e glassDetails
revision 202202117855 and boa 202403147835- change glass type on north and south facades from tinted to clear low e glass | |
| Jul 26, 2024 | Completed final sign-off Sep 2026 | 85 Mirabel Av | Planart Construction Corp | revision to bpa# 202303103513: remove the new stair connection north of gird line a from the scope of work. the rest of the project is as proposed per original project.Details
revision to bpa# 202303103513: remove the new stair connection north of gird line a from the scope of work. the rest of the project is as proposed per original project. | |
| Mar 14, 2024 | Completed final sign-off May 2026 | 681 12th Av | revision to special condition permit 202202117855- to comply with boa's decision no 24-001 to include roof as soild as refelect on plans dated 9/21/2022. this permit does not authorize any work until the first addendum of site pa#202202117855 is issued.Details
revision to special condition permit 202202117855- to comply with boa's decision no 24-001 to include roof as soild as refelect on plans dated 9/21/2022. this permit does not authorize any work until the first addendum of site pa#202202117855 is issued. | ||
| Jul 3, 2023 | Completed final sign-off Mar 2024 | 1900 Green St | Cook Construction | revisions to pa# 202202258702, front yard- replace front steps inkind (terrazzo), porch, and fence; in rear yard- install new outdoor sink, shower, gas fire/ grill, firepit and hot tub.Details
revisions to pa# 202202258702, front yard- replace front steps inkind (terrazzo), porch, and fence; in rear yard- install new outdoor sink, shower, gas fire/ grill, firepit and hot tub. | $200,000 |
| Mar 10, 2023 | Completed final sign-off Sep 2026 | 85 Mirabel Av | Planart Construction Corp | addition consists of bay windows over sidewalk. widened garage door, new entry, roof deck on 3rd flr facing rear yard. new firewall @ new stair & deck. new hardscape deck @ rear. new stair connection to rear yard terraces & stairs.Details
addition consists of bay windows over sidewalk. widened garage door, new entry, roof deck on 3rd flr facing rear yard. new firewall @ new stair & deck. new hardscape deck @ rear. new stair connection to rear yard terraces & stairs. | $600,000 |
| Oct 13, 2022 | Expired or cancelled cancelled Jan 2026 | 96 Caselli Av | Paramount Construction | demolish (e) roof framing, rebuild gable roof 3'-6" higher, add a stair from second floor to new 3rd floor. add four sets of dormers and a roof deck at north. create 725 sf of new habitable floor area.Details
demolish (e) roof framing, rebuild gable roof 3'-6" higher, add a stair from second floor to new 3rd floor. add four sets of dormers and a roof deck at north. create 725 sf of new habitable floor area. | $200,000 |
| Jul 25, 2022 | Completed final sign-off Jun 2024 | 681 12th Av | Hammerhouse Construction | revision to bpa# 202110291470. incorporating structural sketches based on existing conditions; foundation cap, stairs support, rear wall ties.Details
revision to bpa# 202110291470. incorporating structural sketches based on existing conditions; foundation cap, stairs support, rear wall ties. | $20,000 |
| Mar 4, 2022 | Completed final sign-off Nov 2022 | 620 Euclid Av | Hammerhouse Construction | rev to pa 202110291495: reinforce (e) parapet @ (e) roof deck to accept proposed future glass windscreen per possible future variance approval.Details
rev to pa 202110291495: reinforce (e) parapet @ (e) roof deck to accept proposed future glass windscreen per possible future variance approval. | $10,000 |
| Feb 25, 2022 | Completed final sign-off Jan 2024 | 1900 Green St | Cook Construction | exterior: replace vinyl windows with wood. front yard landscaping + fence. interior: convert garage to laundry. remove walls in kitchen. remodel basement, 1st fl & partial 2nd fl. remove brick fireplaces.Details
exterior: replace vinyl windows with wood. front yard landscaping + fence. interior: convert garage to laundry. remove walls in kitchen. remodel basement, 1st fl & partial 2nd fl. remove brick fireplaces. | $1,200,000 |
| Feb 24, 2022 | Completed final sign-off Jul 2022 | 96 Caselli Av | Paramount Construction | remodel interior of 96 caselli ave: remove walls between kitchen, living, dining. remove laundry nook, add toilet to bath, add lav to powder room.Details
remodel interior of 96 caselli ave: remove walls between kitchen, living, dining. remove laundry nook, add toilet to bath, add lav to powder room. | $40,000 |
| Feb 11, 2022 | Completed final sign-off May 2026 | 681 12th Av | Via Construction, Hammerhouse Construction | erect 1 story type 5 greenhouse/ceramic studio in rear yardDetails
erect 1 story type 5 greenhouse/ceramic studio in rear yard | $125,000 |
| Oct 29, 2021 | Completed final sign-off Nov 2022 | 620 Euclid Av | Hammerhouse Construction | replace extg 8' fence with 10' fence. remodel extg roof deck over garage. add a grill, refridgerator, heat lamps, fire pit.Details
replace extg 8' fence with 10' fence. remodel extg roof deck over garage. add a grill, refridgerator, heat lamps, fire pit. | $100,000 |
| Nov 19, 2020 | Completed final sign-off Aug 2021 | 1890 Green St | Bergquist Builders | remodel 2nd level unit. work includes: 1. remove non-struct. partition dividing kitchen & dining 2. add wall to create room. 3. replace gas fireplace w. direct vent gas insert. 4. replace windows at back in kind. 5. replace 3 curved panes at front. 6. replace front door glass.Details
remodel 2nd level unit. work includes: 1. remove non-struct. partition dividing kitchen & dining 2. add wall to create room. 3. replace gas fireplace w. direct vent gas insert. 4. replace windows at back in kind. 5. replace 3 curved panes at front. 6. replace front door glass. | $50,000 |
| Oct 23, 2020 | Completed final sign-off Aug 2021 | 91 Commonwealth Av | Bergquist Builders | rev to pa# 201907176106: fence replacement & voluntary strengthing, project consist of a modification to the work previously permitted pa# 201907176106 ,but not yet completed, modifications include new voluntary strengthing and adding shetting to walls, new shear wall & footing, replace (e) fence,Details
rev to pa# 201907176106: fence replacement & voluntary strengthing, project consist of a modification to the work previously permitted pa# 201907176106 ,but not yet completed, modifications include new voluntary strengthing and adding shetting to walls, new shear wall & footing, replace (e) fence, | $40,000 |