Block 5517, lot 021F
85 Mirabel Ave
- City’s use
- Single Family Residential
- Built
- 1938
- Stories
- 1
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 1,904 sq ft
- Lot
- 3,023 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 23, 2026 | Completed final sign-off Sep 2026 | 85 Mirabel Av | Planart Construction Corp | to obtain final inspection for work approved under pa#202407267403 all work is completeDetails
to obtain final inspection for work approved under pa#202407267403 all work is complete | |
| Jul 26, 2024 | Completed final sign-off Sep 2026 | 85 Mirabel Av | Planart Construction Corp | revision to bpa# 202303103513: remove the new stair connection north of gird line a from the scope of work. the rest of the project is as proposed per original project.Details
revision to bpa# 202303103513: remove the new stair connection north of gird line a from the scope of work. the rest of the project is as proposed per original project. | |
| Mar 10, 2023 | Completed final sign-off Sep 2026 | 85 Mirabel Av | Planart Construction Corp | addition consists of bay windows over sidewalk. widened garage door, new entry, roof deck on 3rd flr facing rear yard. new firewall @ new stair & deck. new hardscape deck @ rear. new stair connection to rear yard terraces & stairs.Details
addition consists of bay windows over sidewalk. widened garage door, new entry, roof deck on 3rd flr facing rear yard. new firewall @ new stair & deck. new hardscape deck @ rear. new stair connection to rear yard terraces & stairs. | $600,000 |
| Aug 11, 2014 | Completed final sign-off Feb 2015 | 85 Mirabel Av | Tosick Remodels | bathroom remodel; demo to studs: replace with novertical fiberglass. required, new plumbing fixtures, tub, vanity, sink & toilet. new drywall, tile backer, new tile & finishes. insulation, replace existing exhaust fan/gfci.Details
bathroom remodel; demo to studs: replace with novertical fiberglass. required, new plumbing fixtures, tub, vanity, sink & toilet. new drywall, tile backer, new tile & finishes. insulation, replace existing exhaust fan/gfci. | $15,000 |
| Nov 30, 2011 | Completed final sign-off Dec 2011 | 85 Mirabel Av | H R Wellington Const Inc | as per h.r. wellington report #882204 dated 9/23/11. item 3a: faulty grades have led to moisture penetration; fungus damage to foundation mudsills and lower wood framing members. cutup the base & the wall. remove all loose and deteriorated concrete. install a new steel reinforced curb wallDetails
as per h.r. wellington report #882204 dated 9/23/11. item 3a: faulty grades have led to moisture penetration; fungus damage to foundation mudsills and lower wood framing members. cutup the base & the wall. remove all loose and deteriorated concrete. install a new steel reinforced curb wall | $1,200 |
| Jun 17, 2011 | Never finaled issued Jun 2011, no final | 85 Mirabel Av | street space & sidewalkDetails
street space & sidewalk | ||
| Nov 22, 2006 | Completed final sign-off Nov 2006 | 85 Mirabel Av | renew app #200512059453 for final inspectionDetails
renew app #200512059453 for final inspection | ||
| Dec 5, 2005 | Expired or cancelled expired Aug 2006 | 85 Mirabel Av | revision to permit app#200312112125. alternate 1 hr. roof/clg. assembly.Details
revision to permit app#200312112125. alternate 1 hr. roof/clg. assembly. | ||
| Dec 5, 2005 | Completed final sign-off Aug 2006 | 85 Mirabel Av | renew app#9608887,#9905887 for final inspection.Details
renew app#9608887,#9905887 for final inspection. | ||
| Dec 11, 2003 | Completed final sign-off Aug 2006 | 85 Mirabel Av | add 150 s.f.to 1/f & 250 s.f. to 2/f.remodel (e) 1/f bedroom,den,mech,crawlspace into 2 bedrooms,Details
add 150 s.f.to 1/f & 250 s.f. to 2/f.remodel (e) 1/f bedroom,den,mech,crawlspace into 2 bedrooms, | $25,000 | |
| Nov 14, 2001 | Expired or cancelled expired Mar 2002 | 85 Mirabel Av | sidewalk repairDetails
sidewalk repair | ||
| Nov 8, 2001 | Completed final sign-off Jun 2002 | 85 Mirabel Av | remove:(e) kitchen base cabinets, flooring & replace w/(n) relocate (e) kitchen sink remove(e) bathrDetails
remove:(e) kitchen base cabinets, flooring & replace w/(n) relocate (e) kitchen sink remove(e) bathr | $1,500 | |
| Jan 22, 2001 | Completed final sign-off Feb 2001 | 85 Mirabel Av | Pioneer Builders | removed & domp existing deck at rear of house install 2 steps 8" rise 10" thread to the garage fronDetails
removed & domp existing deck at rear of house install 2 steps 8" rise 10" thread to the garage fron | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Planart Construction Corp (3), H R Wellington Const Inc, Pioneer Builders, Tosick Remodels
- Architects
- Brent Martin (2)
- Engineers
- David Crestfield (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.