Kilrea Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to Sep 2026
- Last 24 months
- 10 permits filed
109 permits since 2000: 90 completed, 6 in progress, 8 never finaled, 5 expired or cancelled.
Of the 8 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 109.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 23, 2026 | In progress filed Sep 2026, not yet issued | 3801 Ocean Av | revision to approved permit 202508203539 remove laundry sink from garageDetails
revision to approved permit 202508203539 remove laundry sink from garage | |
| Aug 27, 2026 | In progress issued Aug 2026 | 101 Harrison St | suite#103: replace kitchen cabinets, stone counter tops, flooring & recessed lights, due to waterleak damage.Details
suite#103: replace kitchen cabinets, stone counter tops, flooring & recessed lights, due to waterleak damage. | $40,000 |
| Jul 27, 2026 | In progress issued Sep 2026 | 91 Palm Av | remodel (e) 719 sf ground floor into attached 719 sf 1 bedroom adu in (e) tenancy in common duplex.Details
remodel (e) 719 sf ground floor into attached 719 sf 1 bedroom adu in (e) tenancy in common duplex. | $100,000 |
| Jun 12, 2026 | Completed final sign-off Sep 2026 | 36 Denslowe Dr | remodel two bathrooms like for like. removing tub in primary bathroom.Details
remodel two bathrooms like for like. removing tub in primary bathroom. | $50,000 |
| Feb 26, 2026 | In progress filed Feb 2026, not yet issued | 3801 Ocean Av | revision 202508203539- (n) sink in pantryDetails
revision 202508203539- (n) sink in pantry | |
| Sep 30, 2025 | Completed final sign-off Feb 2026 | 617 Broderick St | apt a: bathroom remodel: covert shower to tub. same location. no layout change.Details
apt a: bathroom remodel: covert shower to tub. same location. no layout change. | $15,000 |
| Aug 20, 2025 | In progress issued Sep 2025 | 3801 Ocean Av | partial renovation to single family home including kitchen, full and half bath, conversion of closet to bath. replacement of window @ frontDetails
partial renovation to single family home including kitchen, full and half bath, conversion of closet to bath. replacement of window @ front | $158,828 |
| May 22, 2025 | Completed final sign-off Aug 2025 | 2941 Washington St | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $40,000 |
| Feb 7, 2025 | Completed final sign-off Oct 2025 | 1401 Hyde St | new opening at wall between kitchen and den at all 4 floors, and all 4 units.Details
new opening at wall between kitchen and den at all 4 floors, and all 4 units. | $20,000 |
| Oct 15, 2024 | Completed final sign-off Jan 2025 | 198 Wawona St | kitchen remodel - replace cabinets & counter tops. no moving of walls, all work within (e) kitchen.Details
kitchen remodel - replace cabinets & counter tops. no moving of walls, all work within (e) kitchen. | $50,000 |
| Aug 6, 2024 | Completed final sign-off Feb 2025 | 223 Crestmont Dr | replace (2) existing decks at the back of building to fix dryrot deck structure in kind.Details
replace (2) existing decks at the back of building to fix dryrot deck structure in kind. | $50,000 |
| Jul 29, 2024 | Completed final sign-off Jun 2025 | 2199 Divisadero St | full gut remodel of powder room. no moving of walls or structural work. installation of speakers and light fixtures.Details
full gut remodel of powder room. no moving of walls or structural work. installation of speakers and light fixtures. | $20,000 |
| Jul 16, 2024 | Completed final sign-off Oct 2024 | 214 11th Av | permeation grouting below permeter footing. work in accordance with 210 11th ave #202303304734Details
permeation grouting below permeter footing. work in accordance with 210 11th ave #202303304734 | $3,000 |
| Jul 16, 2024 | Completed final sign-off Oct 2024 | 206 11th Av | permeation grouting below permeter footings. work in accordance with 210 11th ave #202303304734Details
permeation grouting below permeter footings. work in accordance with 210 11th ave #202303304734 | $3,000 |
| May 2, 2024 | Completed final sign-off Mar 2025 | 55 Grattan St | revision to bpa# 202311090495: modify interior layout and remove skylights.Details
revision to bpa# 202311090495: modify interior layout and remove skylights. | |
| Feb 29, 2024 | In progress issued Feb 2024 | 2631 Clay St | replace sections of wood siding at back of building. approx 1000 sqftDetails
replace sections of wood siding at back of building. approx 1000 sqft | $25,000 |
| Feb 7, 2024 | Completed final sign-off May 2024 | 1643 41st Av | remodel two bathrooms (1) no structural work. all work performed within existing bathroom walls.Details
remodel two bathrooms (1) no structural work. all work performed within existing bathroom walls. | $35,000 |
| Nov 9, 2023 | Completed final sign-off Mar 2025 | 55 Grattan St | remodel kitchen & bath at 1st fl; remodel kitchen & bath @ 2nd fl; provide stair to existing attic and convert to habitalbe space. modify interior layout to 1st and 2nd floor.add (n) skylightDetails
remodel kitchen & bath at 1st fl; remodel kitchen & bath @ 2nd fl; provide stair to existing attic and convert to habitalbe space. modify interior layout to 1st and 2nd floor.add (n) skylight | $225,000 |
| Oct 2, 2023 | Completed final sign-off May 2024 | 1643 41st Av | kitchen remodel in kind: replace cabinets and countertops. no structural work. no floor layout change. no wall layout change.Details
kitchen remodel in kind: replace cabinets and countertops. no structural work. no floor layout change. no wall layout change. | $45,000 |
| Sep 21, 2023 | Completed final sign-off Jan 2024 | 53 Walter St | revision to pa# 201805229818. 1st fl only. add wetbar and half bath. no structural work.Details
revision to pa# 201805229818. 1st fl only. add wetbar and half bath. no structural work. | $12,000 |
| Sep 1, 2023 | Completed final sign-off Jan 2025 | 278 Upper Tr | front window replacement, reframe upper floor windows. new shearwalls at front wall. remove (e) stucco from facade and replace in kind.Details
front window replacement, reframe upper floor windows. new shearwalls at front wall. remove (e) stucco from facade and replace in kind. | $50,000 |
| Aug 25, 2023 | Completed final sign-off Jan 2024 | 4428 23rd St | revision to permit 201812128116 to include retaining wall at rear yard per inspectors request to address complaint#: 202307010Details
revision to permit 201812128116 to include retaining wall at rear yard per inspectors request to address complaint#: 202307010 | $20,000 |
| Aug 3, 2023 | Completed final sign-off May 2024 | 53 Walter St | to obtain final inspection for work approved under pa #202010136418, #202101213034, #202001131779. all work is complete.Details
to obtain final inspection for work approved under pa #202010136418, #202101213034, #202001131779. all work is complete. | |
| Aug 3, 2023 | Completed final sign-off May 2024 | 53 Walter St | to obtain final inspection for work approved under pa# 201805229818. all work is complete.Details
to obtain final inspection for work approved under pa# 201805229818. all work is complete. | |
| Aug 3, 2023 | Completed final sign-off Jan 2024 | 53 Walter St | to obtain final inspection for work approved under pa#202109148434. all work is complete.Details
to obtain final inspection for work approved under pa#202109148434. all work is complete. | |
| Jul 31, 2023 | Never finaled issued Aug 2023, no final | 2619 Baker St | extend rear roof deck at 4th fl.Details
extend rear roof deck at 4th fl. | $7,000 |
| May 12, 2023 | Never finaled issued May 2023, no final | 2619 Baker St | remove parapet at rear bldg at 4th flrDetails
remove parapet at rear bldg at 4th flr | $3,000 |
| Mar 30, 2023 | Completed final sign-off Aug 2025 | 210 11th Av | horizontal addition at first level of single family home.remodel on second and third level. excavation for new foundation, approx 46 cu. yds. max depth 1'-10"Details
horizontal addition at first level of single family home.remodel on second and third level. excavation for new foundation, approx 46 cu. yds. max depth 1'-10" | $184,567 |
| Mar 2, 2023 | Completed final sign-off Apr 2023 | 2619 Baker St | revision to pa# 202302141944, sequence excavation along gridline a deepen foundations as directed by soil engineer.Details
revision to pa# 202302141944, sequence excavation along gridline a deepen foundations as directed by soil engineer. | |
| Jan 19, 2023 | Completed final sign-off Jun 2023 | 160 Hancock St | #2. remodel of 2 bathrooms and kitchen. no structural work.Details
#2. remodel of 2 bathrooms and kitchen. no structural work. | $80,000 |
| May 2, 2022 | Completed final sign-off Mar 2023 | 746 27th Av | geo grout foundations due to work at 742 27th ave.Details
geo grout foundations due to work at 742 27th ave. | $4,000 |
| May 2, 2022 | Completed final sign-off Mar 2023 | 742 27th Av | temporary shoring of the (e) residence superstructure for work permitted by pa #201907035056. all shoring scope remains within the property and does not cross property lines.Details
temporary shoring of the (e) residence superstructure for work permitted by pa #201907035056. all shoring scope remains within the property and does not cross property lines. | $10,000 |
| May 2, 2022 | Completed final sign-off Mar 2023 | 738 27th Av | geo grout foundation due to work at 742 27th aveDetails
geo grout foundation due to work at 742 27th ave | $4,000 |
| Mar 11, 2022 | Never finaled filed Mar 2022, never issued | 2475 Washington St | convert (e) office building into 2 residential units. exterior restoration. interor renovation. raise structureDetails
convert (e) office building into 2 residential units. exterior restoration. interor renovation. raise structure | $2,400,000 |
| Dec 9, 2021 | Expired or cancelled withdrawn Aug 2023 | 53 Walter St | create new 8' wide garage door for two off-street spaces. garage door to be located below ground level of (e) residence. install new curb cut.Details
create new 8' wide garage door for two off-street spaces. garage door to be located below ground level of (e) residence. install new curb cut. | $29,750 |
| Sep 14, 2021 | Expired or cancelled expired Jan 2024 | 53 Walter St | new deck 30" above grade @ rear, not visible from street, new retaining wall at deckDetails
new deck 30" above grade @ rear, not visible from street, new retaining wall at deck | $19,525 |
| Sep 13, 2021 | Completed final sign-off Mar 2022 | 231 Roosevelt Wy | apt 2: remodel (e) kitchen & 2 bathrooms, in-kind. h.e. lighting and controlled per cec 150.0(k)Details
apt 2: remodel (e) kitchen & 2 bathrooms, in-kind. h.e. lighting and controlled per cec 150.0(k) | $90,000 |
| Jul 8, 2021 | Completed final sign-off Jan 2022 | 2724 Lyon St | modify existing permit 202104067984 to move rear stairsDetails
modify existing permit 202104067984 to move rear stairs | |
| Jun 3, 2021 | Completed final sign-off Aug 2021 | 2583 45th Av | kitchen remodel in kind. no moving of walls,replace cabinets and countertopsDetails
kitchen remodel in kind. no moving of walls,replace cabinets and countertops | $20,000 |
| Apr 6, 2021 | Never finaled issued Jun 2021, no final | 2724 Lyon St | new stairs down to rear yard from existing rear deck, and replace windows in-kind at rear. replace guardrail at existing rear deck.Details
new stairs down to rear yard from existing rear deck, and replace windows in-kind at rear. replace guardrail at existing rear deck. | $20,000 |
| Jan 21, 2021 | Expired or cancelled expired May 2024 | 55 Walter St | new private roof deck above (e) 4th floor unit. roof deck to be accessed via private open stair and will be 500sf.Details
new private roof deck above (e) 4th floor unit. roof deck to be accessed via private open stair and will be 500sf. | $115,000 |
| Oct 13, 2020 | Completed final sign-off Feb 2022 | 1150 Sacramento St | units #403 & #503 only: two story interior renovation. upgrade plumbing fixtures in place. upgrade electrical fixtures and switches in place. new partitions, finishes, and mill work in select areas. no work to load bearing constructionDetails
units #403 & #503 only: two story interior renovation. upgrade plumbing fixtures in place. upgrade electrical fixtures and switches in place. new partitions, finishes, and mill work in select areas. no work to load bearing construction | $35,000 |
| Oct 13, 2020 | Completed final sign-off Jan 2024 | 53 Walter St | provide temporary building shoring & excavation sequenceDetails
provide temporary building shoring & excavation sequence | $15,000 |
| May 13, 2020 | Completed final sign-off Mar 2021 | 132 Church St | replace rear yard stairs in-kindDetails
replace rear yard stairs in-kind | $15,983 |
| Jan 13, 2020 | Completed final sign-off Jan 2024 | 53 Walter St | remove lath & laster and kitchen, living bathrooms for structural investigationg. repair & replace inkin after investigation.Details
remove lath & laster and kitchen, living bathrooms for structural investigationg. repair & replace inkin after investigation. | $1,000 |
| Oct 23, 2019 | Completed final sign-off Feb 2021 | 4135 21st St | interior remodel witin (e) building envelope, new deck at rear with new exterior guardrail and stairs, new skylights, work includes 1 new kitchen, new bathrooms, and a new laundryDetails
interior remodel witin (e) building envelope, new deck at rear with new exterior guardrail and stairs, new skylights, work includes 1 new kitchen, new bathrooms, and a new laundry | $350,000 |
| Aug 29, 2019 | Never finaled issued Jan 2020, no final | 426 Jersey St | street spaceDetails
street space | |
| Jul 19, 2019 | Completed final sign-off Sep 2020 | 426 Jersey St | bld shoring to accomodate partial foundation replacementDetails
bld shoring to accomodate partial foundation replacement | $4,000 |
| Jul 3, 2019 | Completed final sign-off Oct 2023 | 742 27th Av | renovate (e) interiors. two-story vertical addition and horizontal addtion at rear.Details
renovate (e) interiors. two-story vertical addition and horizontal addtion at rear. | $250,000 |
| Jun 3, 2019 | Completed final sign-off Mar 2020 | 1830 Lake St | kitchen & powder room remodel. deck addition.Details
kitchen & powder room remodel. deck addition. | $75,000 |
| May 17, 2019 | Completed final sign-off Nov 2019 | 131 Peru Av | remodel (e) sfd. interior work only. no exterior work. reconfigure inter partitions, remodel kitchen and bathroom. new finishesDetails
remodel (e) sfd. interior work only. no exterior work. reconfigure inter partitions, remodel kitchen and bathroom. new finishes | $150,000 |
| Dec 12, 2018 | Completed final sign-off Jan 2024 | 4428 23rd St | horizontal and vertical addition at rear. change to facade. addition of garage/garage door.Details
horizontal and vertical addition at rear. change to facade. addition of garage/garage door. | $500,000 |
| Oct 5, 2018 | Completed final sign-off Apr 2019 | 181 Capistrano Av | remove center load bearing wall at 1st floor storage area. add new 14 feet wide opening to rear yard.Details
remove center load bearing wall at 1st floor storage area. add new 14 feet wide opening to rear yard. | $25,000 |
| Oct 3, 2018 | Completed final sign-off Mar 2019 | 105 Fillmore St | addition of 1 new bathroom, new shower, toilet and sink. new lighting and recetacle new interior finishes. convert (e) closet to new bathroom. all work in unit 105aDetails
addition of 1 new bathroom, new shower, toilet and sink. new lighting and recetacle new interior finishes. convert (e) closet to new bathroom. all work in unit 105a | $20,000 |
| Jul 10, 2018 | Completed final sign-off Sep 2020 | 426 Jersey St | add a 3/f to (e) 2story bldg, 2 story horizontal extension incl. 2/f & 3/f decks. renovation of entire bldg, (n) stairway & addition of master bedrm & bath. another bedrm & bath on the 3/f to accommodate a family of four, fully 13r sprinkler. in an otherwise 2 story tight . quarters.**maher n/a**.Details
add a 3/f to (e) 2story bldg, 2 story horizontal extension incl. 2/f & 3/f decks. renovation of entire bldg, (n) stairway & addition of master bedrm & bath. another bedrm & bath on the 3/f to accommodate a family of four, fully 13r sprinkler. in an otherwise 2 story tight . quarters.**maher n/a**. | $670,000 |
| Jun 7, 2018 | Completed final sign-off Jul 2019 | 55 Child St | replace existing original aluminum windows at upper floor, street facing with aluminum windows. no change to existing opening size. no emergency egress needed at 4th fl per 1029.1 u factor = 0.32 maxDetails
replace existing original aluminum windows at upper floor, street facing with aluminum windows. no change to existing opening size. no emergency egress needed at 4th fl per 1029.1 u factor = 0.32 max | $9,000 |
| May 22, 2018 | Expired or cancelled expired Jan 2024 | 53 Walter St | vert & horiz addition. interior remodel; reconfigure kitchens, baths, (n) rear addition with decks,existing egress stair facing rear yard. raise existing home by 14" .convert portion of interior storage space to new dwelling unit. replace (e) foundation, full seismic upgrade to bldg.Details
vert & horiz addition. interior remodel; reconfigure kitchens, baths, (n) rear addition with decks,existing egress stair facing rear yard. raise existing home by 14" .convert portion of interior storage space to new dwelling unit. replace (e) foundation, full seismic upgrade to bldg. | $360,000 |
| May 11, 2018 | Completed final sign-off Feb 2019 | 105 Fillmore St | interior remodel, add bath, remodel kitchen and bath. replace north and west windows in kind with insulated units. ugrade elec panel.replace all lighting with high eff lights. add wall and ceiling insulation. new int finishes. e forced air sytem to remain. add in house washer/dryerDetails
interior remodel, add bath, remodel kitchen and bath. replace north and west windows in kind with insulated units. ugrade elec panel.replace all lighting with high eff lights. add wall and ceiling insulation. new int finishes. e forced air sytem to remain. add in house washer/dryer | $150,000 |
| Jan 24, 2018 | Completed final sign-off Aug 2018 | 436 Valley St | seismic upgrade lowest level; partial interior remodel to 1st flr - (e) kitchen, garage, bedroom & entry, add new bathroom & laundry rm, replace 5(e) windows on front facade in kind w/alum clad wood windows(visible from the st) . replace (e) lightwell windows. mep. no expansion of bld envDetails
seismic upgrade lowest level; partial interior remodel to 1st flr - (e) kitchen, garage, bedroom & entry, add new bathroom & laundry rm, replace 5(e) windows on front facade in kind w/alum clad wood windows(visible from the st) . replace (e) lightwell windows. mep. no expansion of bld env | $300,000 |
| Nov 17, 2017 | Completed final sign-off Jun 2019 | 3012 Cesar Chavez St | new 1st floor rear addition to infill under extg structural to create new master bedroom suite. new furnace and water heater to be located in garage. new deck above a portion of addition with new spiral stair access. bedroom to have direct access to public way.Details
new 1st floor rear addition to infill under extg structural to create new master bedroom suite. new furnace and water heater to be located in garage. new deck above a portion of addition with new spiral stair access. bedroom to have direct access to public way. | $100,000 |
| Aug 7, 2017 | Completed final sign-off Feb 2018 | 2305 Washington St | reconfiguration of 3rd fl. partitions, elec, lighting, change powder rm to full bath, reconfigure br 4 to street side, complies with rescue windowDetails
reconfiguration of 3rd fl. partitions, elec, lighting, change powder rm to full bath, reconfigure br 4 to street side, complies with rescue window | |
| Jun 21, 2017 | Completed final sign-off Feb 2018 | 2305 Washington St | interior remodel, add new bath, refurbish e 2,replace kitchen cabinets, fixtures. reframe some int non bearing wall. upgrade elc, plmg. replace all lighting,wall,floor, clg finishes.replace int doors trim and hardware and floor finishes.add ext wall insulation,clg insulationDetails
interior remodel, add new bath, refurbish e 2,replace kitchen cabinets, fixtures. reframe some int non bearing wall. upgrade elc, plmg. replace all lighting,wall,floor, clg finishes.replace int doors trim and hardware and floor finishes.add ext wall insulation,clg insulation | $200,000 |
| Mar 9, 2017 | Never finaled issued Mar 2017, no final | 2555 Divisadero St | to renew bpa # 201407080641, 201009150963, 201505136251, 201603172324 to complete work and obtain a final inspection.Details
to renew bpa # 201407080641, 201009150963, 201505136251, 201603172324 to complete work and obtain a final inspection. | $70,000 |
| Feb 23, 2017 | Completed final sign-off Sep 2017 | 188 Haight St | interior partition changes; master bedroom, mud/laundry, bath and wetbar renovation; plumbing, electrical and mechanical work; doors & windows envelope changesDetails
interior partition changes; master bedroom, mud/laundry, bath and wetbar renovation; plumbing, electrical and mechanical work; doors & windows envelope changes | $50,000 |
| Feb 22, 2017 | Completed final sign-off Jan 2019 | 188 Haight St | add 2 flat skylights and 1 window.Details
add 2 flat skylights and 1 window. | $2,500 |
| Dec 8, 2016 | Completed final sign-off Oct 2018 | 2555 Webster St | new larger roof deck to replace small deck. access to use (e) elevator & stair penthouse.Details
new larger roof deck to replace small deck. access to use (e) elevator & stair penthouse. | $50,000 |
| Nov 21, 2016 | Completed final sign-off Feb 2018 | 2815 Franklin St | convert the (e) 1st floor utility area to a family room including new windows & doors in the rear wall, a bathroom & a laundry room. replace rear wall siding. install new skylights in teh 2nd floor ceiling & a rated parapet next to the skylights.Details
convert the (e) 1st floor utility area to a family room including new windows & doors in the rear wall, a bathroom & a laundry room. replace rear wall siding. install new skylights in teh 2nd floor ceiling & a rated parapet next to the skylights. | $93,957 |
| Jul 19, 2016 | Completed final sign-off Dec 2016 | 245 Justin Dr | remove + replace stucco at front of building remove + replace 5 front windows with new wood windows in kind. each window single section no work to existing stair treads or riserDetails
remove + replace stucco at front of building remove + replace 5 front windows with new wood windows in kind. each window single section no work to existing stair treads or riser | $15,000 |
| Jul 8, 2016 | Completed final sign-off Nov 2016 | 1347 33rd Av | kitchen remodel, bathroom remodel, 2bd flr bathroom addition including 11 sf of lightwell infill. replace (e) windows in walls at the 2nd flr exteriorDetails
kitchen remodel, bathroom remodel, 2bd flr bathroom addition including 11 sf of lightwell infill. replace (e) windows in walls at the 2nd flr exterior | $40,000 |
| Jun 28, 2016 | Completed final sign-off Jan 2017 | 843 South Van Ness Av | apt 8: replace kitchen cabinets & stone counter tops. cosmetic kitchen remodel, no structural work.Details
apt 8: replace kitchen cabinets & stone counter tops. cosmetic kitchen remodel, no structural work. | $15,000 |
| Apr 27, 2016 | Completed final sign-off Sep 2016 | 198 Wawona St | remodel 2 cosmetic bathroom, no new fixtures. plumbing stays in same location, all new electrical, no structural .Details
remodel 2 cosmetic bathroom, no new fixtures. plumbing stays in same location, all new electrical, no structural . | $30,000 |
| Mar 31, 2016 | Completed final sign-off Jul 2016 | 834 Page St | kitchen, bathroom & laundry room remodel @ unit 834.Details
kitchen, bathroom & laundry room remodel @ unit 834. | $60,000 |
| Feb 9, 2016 | Completed final sign-off Jun 2016 | 4311 24th St | remove wall between living room and dining room/den @ 2nd flr. install steel beam to reinforce floor at 3rd level support. remodel master bath at 3rd flr, with same fixture locationDetails
remove wall between living room and dining room/den @ 2nd flr. install steel beam to reinforce floor at 3rd level support. remodel master bath at 3rd flr, with same fixture location | $80,000 |
| Jan 12, 2016 | Completed final sign-off Apr 2016 | 60 Woodward St | #a-interior remodel 60a woodward apt unit at 2nd fl. remodel (e) kitchen and bath. new bedroom to replace (e) living room. no structural work.Details
#a-interior remodel 60a woodward apt unit at 2nd fl. remodel (e) kitchen and bath. new bedroom to replace (e) living room. no structural work. | $40,000 |
| Sep 14, 2015 | Completed final sign-off Jan 2017 | 843 South Van Ness Av | expansion to existing residence on 4th flr. convert exterior roof deck area off of living space inteo new office space. sprinkler/alarm deferred.Details
expansion to existing residence on 4th flr. convert exterior roof deck area off of living space inteo new office space. sprinkler/alarm deferred. | $30,000 |
| Aug 25, 2015 | Completed final sign-off Apr 2016 | 2555 Webster St | paint front exterior of building and replace tile at base with new stone-finish tile in approximately 12"x35" size and 1/8" grout joint around garage door & front steps.Details
paint front exterior of building and replace tile at base with new stone-finish tile in approximately 12"x35" size and 1/8" grout joint around garage door & front steps. | $10,000 |
| Aug 20, 2015 | Completed final sign-off Aug 2015 | 3012 Cesar Chavez St | revision to pa 2015-0619-9407. add new skylight at 2nd floor back of house family room.Details
revision to pa 2015-0619-9407. add new skylight at 2nd floor back of house family room. | $500 |
| Aug 18, 2015 | Completed final sign-off Oct 2015 | 208 Fair Oaks St | remodel one bathroom. same number of plumbing fixts. no structural work.Details
remodel one bathroom. same number of plumbing fixts. no structural work. | $13,720 |
| Aug 4, 2015 | Completed final sign-off Oct 2015 | 208 Fair Oaks St | 2nd floor: non-structural interior remodel - kitchen, provide 1 window at kitchen. close 1 window at kitchen.Details
2nd floor: non-structural interior remodel - kitchen, provide 1 window at kitchen. close 1 window at kitchen. | $13,000 |
| Jul 29, 2015 | Expired or cancelled withdrawn Aug 2015 | 208 Fair Oaks St | non-structural interior remodel 208 fair oaks at 2nd floor: remodel kitchen provide new laundry at hallway. close one window at kitchen. provide one new window at kitchen.Details
non-structural interior remodel 208 fair oaks at 2nd floor: remodel kitchen provide new laundry at hallway. close one window at kitchen. provide one new window at kitchen. | $13,000 |
| Jul 3, 2015 | Completed final sign-off Jul 2015 | 278 Upper Tr | fix complaint 2015-007591 enf. add metal and cable rail to top of existing fence at back property line. total height of fence including steel rail to the top is less than 6 feet.Details
fix complaint 2015-007591 enf. add metal and cable rail to top of existing fence at back property line. total height of fence including steel rail to the top is less than 6 feet. | $2,000 |
| Feb 23, 2015 | Completed final sign-off Apr 2016 | 2555 Webster St | demo kitchen, bathroom and fireplace, will replace under separate permit.Details
demo kitchen, bathroom and fireplace, will replace under separate permit. | $5,000 |
| Nov 6, 2014 | Completed final sign-off Feb 2015 | 208 Fair Oaks St | #208a- new bedroom and closet, new window at back wall. #210a- new closet.Details
#208a- new bedroom and closet, new window at back wall. #210a- new closet. | $20,000 |
| Sep 23, 2014 | Completed final sign-off Nov 2014 | 278 Upper Tr | revision to app#201408295048. reinforce extg foundation. install new psl beam and new sleeper beamDetails
revision to app#201408295048. reinforce extg foundation. install new psl beam and new sleeper beam | $5,000 |
| Aug 29, 2014 | Completed final sign-off Nov 2014 | 278 Upper Tr | relocate stair to left side of property new 8' glass door at 2nd fl master bedroom, new 4' shearwall at rear of 2nd fl master bedroomDetails
relocate stair to left side of property new 8' glass door at 2nd fl master bedroom, new 4' shearwall at rear of 2nd fl master bedroom | $18,000 |
| Apr 22, 2014 | Completed final sign-off Jun 2014 | 198 Wawona St | bathroom remodel. all new plumbing and electrical. room size to remain the same. no structural work. lighting - high efficacy unless controlled by manual on occupancy sensor.Details
bathroom remodel. all new plumbing and electrical. room size to remain the same. no structural work. lighting - high efficacy unless controlled by manual on occupancy sensor. | $15,000 |
| Apr 22, 2014 | Completed final sign-off May 2014 | 153 Clifford Tr | change exisiting kitchen window to match rest of building existing wood windows at street same size.Details
change exisiting kitchen window to match rest of building existing wood windows at street same size. | $2,000 |
| Mar 18, 2014 | Completed final sign-off May 2014 | 155 Clifford Tr | replace kitchen window to match rest of existing wood windows. dual glaze wood sash. visible to the streetDetails
replace kitchen window to match rest of existing wood windows. dual glaze wood sash. visible to the street | $2,000 |
| Dec 30, 2013 | Completed final sign-off Apr 2014 | 58 Woodward St | remodel 58 woodward unit. new plmg, electrical. all new 5/8" type "x" gypsum sheetrock. replace 3 extg kitchen window sashes with aluminum inserts. all windows not visible from street.Details
remodel 58 woodward unit. new plmg, electrical. all new 5/8" type "x" gypsum sheetrock. replace 3 extg kitchen window sashes with aluminum inserts. all windows not visible from street. | $55,000 |
| Dec 5, 2013 | Completed final sign-off May 2014 | 155 Clifford Tr | remove damaged lathe and plaster and replace with type "x" 5/8" gypsum sheetrock in bedrooms and living room, 500 sq.ft. of floor space, no structuralDetails
remove damaged lathe and plaster and replace with type "x" 5/8" gypsum sheetrock in bedrooms and living room, 500 sq.ft. of floor space, no structural | $3,000 |
| Oct 25, 2013 | Completed final sign-off May 2014 | 155 Clifford Tr | kitchen remodel, bath remodel, new skylights, doors, interior openings. not visible from streetDetails
kitchen remodel, bath remodel, new skylights, doors, interior openings. not visible from street | $50,000 |
| Oct 24, 2013 | Completed final sign-off Nov 2013 | 449 Staples Av | patch a few small dry rotted sections of wood siding with new siding at exterior of the building and install new hardy plank siding around deck doors and windows at back of house.Details
patch a few small dry rotted sections of wood siding with new siding at exterior of the building and install new hardy plank siding around deck doors and windows at back of house. | $4,000 |
| Jun 11, 2013 | Completed final sign-off Aug 2013 | 3658 Folsom St | repair dry-rotted framing at front corner of bldg along stairs. remove stucco, install new framing studs and plywood. replace section of stucco.Details
repair dry-rotted framing at front corner of bldg along stairs. remove stucco, install new framing studs and plywood. replace section of stucco. | $5,000 |
| Jun 5, 2013 | Completed final sign-off Nov 2013 | 177 Wawona St | remodel kitchen, new powerder room, remodel master bath, laundry room and closet. new lec, plumbing, door at kitchen to small addition to existing deckDetails
remodel kitchen, new powerder room, remodel master bath, laundry room and closet. new lec, plumbing, door at kitchen to small addition to existing deck | $85,000 |
| Mar 22, 2013 | Completed final sign-off May 2013 | 383 Crescent Av | cosmetic upgrade in bathroom & laundry room, new tile, vanity & toilet.Details
cosmetic upgrade in bathroom & laundry room, new tile, vanity & toilet. | $2,000 |
| Nov 13, 2012 | Completed final sign-off Feb 2013 | 2654 22nd Av | replace (e) deteriorating stairs with new stairs in kind, new pressure treated stringers & hot mopped water proofing with new treads & risers & stucco walls replace in kind. visible from streetDetails
replace (e) deteriorating stairs with new stairs in kind, new pressure treated stringers & hot mopped water proofing with new treads & risers & stucco walls replace in kind. visible from street | $10,000 |
| Jul 19, 2012 | Completed final sign-off Aug 2012 | 417 Roosevelt Wy | replace 11 redwood deck handrail posts to pressure treated wood on upper deck. work being done at 417 roosevelt way.Details
replace 11 redwood deck handrail posts to pressure treated wood on upper deck. work being done at 417 roosevelt way. | $2,000 |
| Mar 7, 2012 | Completed final sign-off May 2012 | 109 Buchanan St | new roof deck for unit 5 top floor unit. reframe roof at proposed deck location.Details
new roof deck for unit 5 top floor unit. reframe roof at proposed deck location. | $8,000 |
| Nov 7, 2011 | Never finaled issued Nov 2011, no final | 1285 Palou Av | added work to appl.# 2011110217370; install a handrail, risers on the steps & a 2x4 under guardrail to bring an (e) deck up to code.Details
added work to appl.# 2011110217370; install a handrail, risers on the steps & a 2x4 under guardrail to bring an (e) deck up to code. | $1,000 |
| Nov 3, 2011 | Completed final sign-off Dec 2011 | 4311 24th St | add shower stall, sink, toilet + under floor electric heat to room. no structural. converting laundry room to bathroom, & move laundry area to garage.Details
add shower stall, sink, toilet + under floor electric heat to room. no structural. converting laundry room to bathroom, & move laundry area to garage. | $18,000 |