Back to kitchen remodel contractors
Kilrea Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Sep 2009 to Sep 2026
- Last 24 months
- 10 permits filed
109 permits since 2000: 90 completed, 6 in progress, 8 never finaled, 5 expired or cancelled.
Of the 8 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
33 kitchen remodel permits: 29 completed, 2 in progress, 2 expired or cancelled. Typically 2 days from filing to permit and 181 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2026 | In progress issued Aug 2026 | 101 Harrison St | suite#103: replace kitchen cabinets, stone counter tops, flooring & recessed lights, due to waterleak damage.Details
suite#103: replace kitchen cabinets, stone counter tops, flooring & recessed lights, due to waterleak damage. | $40,000 |
| Aug 20, 2025 | In progress issued Sep 2025 | 3801 Ocean Av | partial renovation to single family home including kitchen, full and half bath, conversion of closet to bath. replacement of window @ frontDetails
partial renovation to single family home including kitchen, full and half bath, conversion of closet to bath. replacement of window @ front | $158,828 |
| May 22, 2025 | Completed final sign-off Aug 2025 | 2941 Washington St | kitchen and bathroom remodelDetails
kitchen and bathroom remodel | $40,000 |
| Feb 7, 2025 | Completed final sign-off Oct 2025 | 1401 Hyde St | new opening at wall between kitchen and den at all 4 floors, and all 4 units.Details
new opening at wall between kitchen and den at all 4 floors, and all 4 units. | $20,000 |
| Oct 15, 2024 | Completed final sign-off Jan 2025 | 198 Wawona St | kitchen remodel - replace cabinets & counter tops. no moving of walls, all work within (e) kitchen.Details
kitchen remodel - replace cabinets & counter tops. no moving of walls, all work within (e) kitchen. | $50,000 |
| Nov 9, 2023 | Completed final sign-off Mar 2025 | 55 Grattan St | remodel kitchen & bath at 1st fl; remodel kitchen & bath @ 2nd fl; provide stair to existing attic and convert to habitalbe space. modify interior layout to 1st and 2nd floor.add (n) skylightDetails
remodel kitchen & bath at 1st fl; remodel kitchen & bath @ 2nd fl; provide stair to existing attic and convert to habitalbe space. modify interior layout to 1st and 2nd floor.add (n) skylight | $225,000 |
| Oct 2, 2023 | Completed final sign-off May 2024 | 1643 41st Av | kitchen remodel in kind: replace cabinets and countertops. no structural work. no floor layout change. no wall layout change.Details
kitchen remodel in kind: replace cabinets and countertops. no structural work. no floor layout change. no wall layout change. | $45,000 |
| Jan 19, 2023 | Completed final sign-off Jun 2023 | 160 Hancock St | #2. remodel of 2 bathrooms and kitchen. no structural work.Details
#2. remodel of 2 bathrooms and kitchen. no structural work. | $80,000 |
| Sep 13, 2021 | Completed final sign-off Mar 2022 | 231 Roosevelt Wy | apt 2: remodel (e) kitchen & 2 bathrooms, in-kind. h.e. lighting and controlled per cec 150.0(k)Details
apt 2: remodel (e) kitchen & 2 bathrooms, in-kind. h.e. lighting and controlled per cec 150.0(k) | $90,000 |
| Jun 3, 2021 | Completed final sign-off Aug 2021 | 2583 45th Av | kitchen remodel in kind. no moving of walls,replace cabinets and countertopsDetails
kitchen remodel in kind. no moving of walls,replace cabinets and countertops | $20,000 |
| Jan 13, 2020 | Completed final sign-off Jan 2024 | 53 Walter St | remove lath & laster and kitchen, living bathrooms for structural investigationg. repair & replace inkin after investigation.Details
remove lath & laster and kitchen, living bathrooms for structural investigationg. repair & replace inkin after investigation. | $1,000 |
| Oct 23, 2019 | Completed final sign-off Feb 2021 | 4135 21st St | interior remodel witin (e) building envelope, new deck at rear with new exterior guardrail and stairs, new skylights, work includes 1 new kitchen, new bathrooms, and a new laundryDetails
interior remodel witin (e) building envelope, new deck at rear with new exterior guardrail and stairs, new skylights, work includes 1 new kitchen, new bathrooms, and a new laundry | $350,000 |
| Jun 3, 2019 | Completed final sign-off Mar 2020 | 1830 Lake St | kitchen & powder room remodel. deck addition.Details
kitchen & powder room remodel. deck addition. | $75,000 |
| May 17, 2019 | Completed final sign-off Nov 2019 | 131 Peru Av | remodel (e) sfd. interior work only. no exterior work. reconfigure inter partitions, remodel kitchen and bathroom. new finishesDetails
remodel (e) sfd. interior work only. no exterior work. reconfigure inter partitions, remodel kitchen and bathroom. new finishes | $150,000 |
| May 22, 2018 | Expired or cancelled expired Jan 2024 | 53 Walter St | vert & horiz addition. interior remodel; reconfigure kitchens, baths, (n) rear addition with decks,existing egress stair facing rear yard. raise existing home by 14" .convert portion of interior storage space to new dwelling unit. replace (e) foundation, full seismic upgrade to bldg.Details
vert & horiz addition. interior remodel; reconfigure kitchens, baths, (n) rear addition with decks,existing egress stair facing rear yard. raise existing home by 14" .convert portion of interior storage space to new dwelling unit. replace (e) foundation, full seismic upgrade to bldg. | $360,000 |
| May 11, 2018 | Completed final sign-off Feb 2019 | 105 Fillmore St | interior remodel, add bath, remodel kitchen and bath. replace north and west windows in kind with insulated units. ugrade elec panel.replace all lighting with high eff lights. add wall and ceiling insulation. new int finishes. e forced air sytem to remain. add in house washer/dryerDetails
interior remodel, add bath, remodel kitchen and bath. replace north and west windows in kind with insulated units. ugrade elec panel.replace all lighting with high eff lights. add wall and ceiling insulation. new int finishes. e forced air sytem to remain. add in house washer/dryer | $150,000 |
| Jan 24, 2018 | Completed final sign-off Aug 2018 | 436 Valley St | seismic upgrade lowest level; partial interior remodel to 1st flr - (e) kitchen, garage, bedroom & entry, add new bathroom & laundry rm, replace 5(e) windows on front facade in kind w/alum clad wood windows(visible from the st) . replace (e) lightwell windows. mep. no expansion of bld envDetails
seismic upgrade lowest level; partial interior remodel to 1st flr - (e) kitchen, garage, bedroom & entry, add new bathroom & laundry rm, replace 5(e) windows on front facade in kind w/alum clad wood windows(visible from the st) . replace (e) lightwell windows. mep. no expansion of bld env | $300,000 |
| Jun 21, 2017 | Completed final sign-off Feb 2018 | 2305 Washington St | interior remodel, add new bath, refurbish e 2,replace kitchen cabinets, fixtures. reframe some int non bearing wall. upgrade elc, plmg. replace all lighting,wall,floor, clg finishes.replace int doors trim and hardware and floor finishes.add ext wall insulation,clg insulationDetails
interior remodel, add new bath, refurbish e 2,replace kitchen cabinets, fixtures. reframe some int non bearing wall. upgrade elc, plmg. replace all lighting,wall,floor, clg finishes.replace int doors trim and hardware and floor finishes.add ext wall insulation,clg insulation | $200,000 |
| Jul 8, 2016 | Completed final sign-off Nov 2016 | 1347 33rd Av | kitchen remodel, bathroom remodel, 2bd flr bathroom addition including 11 sf of lightwell infill. replace (e) windows in walls at the 2nd flr exteriorDetails
kitchen remodel, bathroom remodel, 2bd flr bathroom addition including 11 sf of lightwell infill. replace (e) windows in walls at the 2nd flr exterior | $40,000 |
| Jun 28, 2016 | Completed final sign-off Jan 2017 | 843 South Van Ness Av | apt 8: replace kitchen cabinets & stone counter tops. cosmetic kitchen remodel, no structural work.Details
apt 8: replace kitchen cabinets & stone counter tops. cosmetic kitchen remodel, no structural work. | $15,000 |
| Mar 31, 2016 | Completed final sign-off Jul 2016 | 834 Page St | kitchen, bathroom & laundry room remodel @ unit 834.Details
kitchen, bathroom & laundry room remodel @ unit 834. | $60,000 |
| Jan 12, 2016 | Completed final sign-off Apr 2016 | 60 Woodward St | #a-interior remodel 60a woodward apt unit at 2nd fl. remodel (e) kitchen and bath. new bedroom to replace (e) living room. no structural work.Details
#a-interior remodel 60a woodward apt unit at 2nd fl. remodel (e) kitchen and bath. new bedroom to replace (e) living room. no structural work. | $40,000 |
| Aug 4, 2015 | Completed final sign-off Oct 2015 | 208 Fair Oaks St | 2nd floor: non-structural interior remodel - kitchen, provide 1 window at kitchen. close 1 window at kitchen.Details
2nd floor: non-structural interior remodel - kitchen, provide 1 window at kitchen. close 1 window at kitchen. | $13,000 |
| Jul 29, 2015 | Expired or cancelled withdrawn Aug 2015 | 208 Fair Oaks St | non-structural interior remodel 208 fair oaks at 2nd floor: remodel kitchen provide new laundry at hallway. close one window at kitchen. provide one new window at kitchen.Details
non-structural interior remodel 208 fair oaks at 2nd floor: remodel kitchen provide new laundry at hallway. close one window at kitchen. provide one new window at kitchen. | $13,000 |
| Feb 23, 2015 | Completed final sign-off Apr 2016 | 2555 Webster St | demo kitchen, bathroom and fireplace, will replace under separate permit.Details
demo kitchen, bathroom and fireplace, will replace under separate permit. | $5,000 |
| Apr 22, 2014 | Completed final sign-off May 2014 | 153 Clifford Tr | change exisiting kitchen window to match rest of building existing wood windows at street same size.Details
change exisiting kitchen window to match rest of building existing wood windows at street same size. | $2,000 |
| Mar 18, 2014 | Completed final sign-off May 2014 | 155 Clifford Tr | replace kitchen window to match rest of existing wood windows. dual glaze wood sash. visible to the streetDetails
replace kitchen window to match rest of existing wood windows. dual glaze wood sash. visible to the street | $2,000 |
| Dec 30, 2013 | Completed final sign-off Apr 2014 | 58 Woodward St | remodel 58 woodward unit. new plmg, electrical. all new 5/8" type "x" gypsum sheetrock. replace 3 extg kitchen window sashes with aluminum inserts. all windows not visible from street.Details
remodel 58 woodward unit. new plmg, electrical. all new 5/8" type "x" gypsum sheetrock. replace 3 extg kitchen window sashes with aluminum inserts. all windows not visible from street. | $55,000 |
| Oct 25, 2013 | Completed final sign-off May 2014 | 155 Clifford Tr | kitchen remodel, bath remodel, new skylights, doors, interior openings. not visible from streetDetails
kitchen remodel, bath remodel, new skylights, doors, interior openings. not visible from street | $50,000 |
| Jun 5, 2013 | Completed final sign-off Nov 2013 | 177 Wawona St | remodel kitchen, new powerder room, remodel master bath, laundry room and closet. new lec, plumbing, door at kitchen to small addition to existing deckDetails
remodel kitchen, new powerder room, remodel master bath, laundry room and closet. new lec, plumbing, door at kitchen to small addition to existing deck | $85,000 |
| Oct 21, 2011 | Completed final sign-off Dec 2011 | 1285 Palou Av | install new kitchen cabinets + 3 outlets change to gfi. install new underground waste pipe in garage & new concrete garage slab. install wood guard rail at back garden. (yard area) replace existing windows with pvc windows. replace a few uneven driveway squares infront of house on propertyDetails
install new kitchen cabinets + 3 outlets change to gfi. install new underground waste pipe in garage & new concrete garage slab. install wood guard rail at back garden. (yard area) replace existing windows with pvc windows. replace a few uneven driveway squares infront of house on property | $30,000 |
| Aug 11, 2011 | Completed final sign-off Sep 2011 | 3 Richards Cr | install new kitchen cabinets, area less than 20 sq ft. minor repairs to exterior siding. no structural work, tile bathrooms. provide carbon monoxide detector per cbc. no new lighting.Details
install new kitchen cabinets, area less than 20 sq ft. minor repairs to exterior siding. no structural work, tile bathrooms. provide carbon monoxide detector per cbc. no new lighting. | $5,000 |
| Apr 20, 2010 | Completed final sign-off Feb 2012 | 884 Douglass St | revision to pa# 2009/12/21/3599. additional remodel work and horizontal addition. gr floor: add laundry room, office, bedroom, and media room. 2nd floor: kitchen remodel, family room, deck. 3rd floor: master bedroom and deck.Details
revision to pa# 2009/12/21/3599. additional remodel work and horizontal addition. gr floor: add laundry room, office, bedroom, and media room. 2nd floor: kitchen remodel, family room, deck. 3rd floor: master bedroom and deck. | $159,000 |