Javier Magana Construction Services
- Based in
- San Rafael
- On San Francisco permits
- Feb 2016 to Jul 2026
- Last 24 months
- 4 permits filed
18 permits since 2000: 10 completed, 2 in progress, 6 never finaled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 24, 2026 | In progress issued Jul 2026 | 30 Lopez Av | revision to 202605271951 for structural framing at door way.Details
revision to 202605271951 for structural framing at door way. | |
| May 27, 2026 | In progress issued Jun 2026 | 30 Lopez Av | convert existing storage to new bed and bath.Details
convert existing storage to new bed and bath. | $25,000 |
| Jul 25, 2025 | Completed final sign-off Feb 2026 | 1 Northgate Dr | revision to pa# 202411275851, exterior entry stairs to remain, (e) beam & posts in garage to remain, update to door schedule, repair dryrot, (n) dishwasher.Details
revision to pa# 202411275851, exterior entry stairs to remain, (e) beam & posts in garage to remain, update to door schedule, repair dryrot, (n) dishwasher. | |
| Jan 1, 2025 | Completed final sign-off Feb 2026 | 1 Northgate Dr | interior remodel: expand habitable space @ first floor, new plumbing and electrical. replace front exterior stairs, replace interior stairs, new steps @ rear yardDetails
interior remodel: expand habitable space @ first floor, new plumbing and electrical. replace front exterior stairs, replace interior stairs, new steps @ rear yard | $400,000 |
| Oct 3, 2024 | Completed final sign-off Dec 2024 | 1567 Union St | add island to kitchen at 2nd level. replace induction cooktop w/ gas range. install cabinet doors on (e) shelves above sink, convert (e) cabinet to drawers under sink area.Details
add island to kitchen at 2nd level. replace induction cooktop w/ gas range. install cabinet doors on (e) shelves above sink, convert (e) cabinet to drawers under sink area. | $8,700 |
| Feb 29, 2024 | Completed final sign-off Mar 2025 | 30 Lopez Av | residential tenant improvement to include remodel kitchen and master suite, add new powder room, replacement windows, add/remove wall(s) located on 2nd and 3rd floor. sepearte mep permits will need to be obtainedDetails
residential tenant improvement to include remodel kitchen and master suite, add new powder room, replacement windows, add/remove wall(s) located on 2nd and 3rd floor. sepearte mep permits will need to be obtained | $195,000 |
| Jul 11, 2022 | Completed final sign-off Dec 2022 | 14 San Carlos St | one existing bathroom remodel: includes retiling and replacement of all fixtures in existing locations. replacement of gfci and light fixtures in all existing locations.Details
one existing bathroom remodel: includes retiling and replacement of all fixtures in existing locations. replacement of gfci and light fixtures in all existing locations. | $18,000 |
| Jul 8, 2022 | Never finaled issued Jul 2022, no final | 1125 Hampshire St | one bathroom remodel.hallway bathroom include retiling and replacement of all fixtures in existing locations. replacement of gfci and light fixtures in all existing locations.Details
one bathroom remodel.hallway bathroom include retiling and replacement of all fixtures in existing locations. replacement of gfci and light fixtures in all existing locations. | $18,000 |
| Jun 8, 2022 | Completed final sign-off Jan 2025 | 101 Liberty St | remodel all (e) bathrooms. new windows & doors. repair (e) siding in-kind. relocate (e) wood shear wall at penthouse level. widen (e) roof deck at penthouse level.Details
remodel all (e) bathrooms. new windows & doors. repair (e) siding in-kind. relocate (e) wood shear wall at penthouse level. widen (e) roof deck at penthouse level. | $55,000 |
| Jul 30, 2019 | Completed final sign-off Nov 2020 | 1641 Lake St | kitchen remodel with bigger wall openings: remove (e) closet to make kitchen larger; relocate door opening for laundry.Details
kitchen remodel with bigger wall openings: remove (e) closet to make kitchen larger; relocate door opening for laundry. | $12,000 |
| Apr 23, 2019 | Never finaled issued Apr 2019, no final | 300 03rd St | unit 801: retile all bathroom surfaces replace all cabinets, countertops, fixtures to remain in all (e) locations. add gfci were needed.Details
unit 801: retile all bathroom surfaces replace all cabinets, countertops, fixtures to remain in all (e) locations. add gfci were needed. | $45,000 |
| Aug 28, 2018 | Completed final sign-off Oct 2018 | 51 14th Av | remove siding, windows. install insulation, structural plywood, water proofing 6 windows and new siding - no work visible from streetDetails
remove siding, windows. install insulation, structural plywood, water proofing 6 windows and new siding - no work visible from street | $10,000 |
| Aug 16, 2017 | Completed final sign-off Dec 2017 | 3880 22nd St | remodel existing bath, reconfigure existing closet to new powder room on second floor.Details
remodel existing bath, reconfigure existing closet to new powder room on second floor. | $45,000 |
| Dec 9, 2016 | Never finaled issued Dec 2016, no final | 1941 Grove St | replace plumbing fixtures (toilet, faucet, sinks) in powder room & hall bath; replace receptacles w/gfciDetails
replace plumbing fixtures (toilet, faucet, sinks) in powder room & hall bath; replace receptacles w/gfci | $5,000 |
| Dec 9, 2016 | Never finaled issued Dec 2016, no final | 215 Moulton St | bathroom retile, re sheetrock if needed.Details
bathroom retile, re sheetrock if needed. | $7,000 |
| Jul 14, 2016 | Never finaled issued Jul 2016, no final | 103 Liberty St | re-tile master bath, guest bath and powder room. relocate outlets in mirors. relocate electric panel to area outside of closet. relocate rough plumbing in said bathrooms.Details
re-tile master bath, guest bath and powder room. relocate outlets in mirors. relocate electric panel to area outside of closet. relocate rough plumbing in said bathrooms. | $40,000 |
| Mar 11, 2016 | Completed final sign-off Mar 2016 | 631 Cole St | replace stringer/risers/treads damaged by dryrot 30% of stairwell, 4 treads, 5 steps, 3 stringers, same location. replace 2x12 with 3x12 pressure treated, add simpson structural hardware on stringer-ledge connections. not visible from street.Details
replace stringer/risers/treads damaged by dryrot 30% of stairwell, 4 treads, 5 steps, 3 stringers, same location. replace 2x12 with 3x12 pressure treated, add simpson structural hardware on stringer-ledge connections. not visible from street. | $4,000 |
| Feb 16, 2016 | Never finaled issued Feb 2016, no final | 1941 Grove St | add 16 outlets to bedrooms & officeDetails
add 16 outlets to bedrooms & office | $2,800 |