Permit GraphShortlistSan Francisco building permits since 2000

Javier Magana Construction Services

Contractor license
832973
State license record
Based in
San Rafael
On San Francisco permits
Feb 2016 to Jul 2026
Last 24 months
4 permits filed

18 permits since 2000: 10 completed, 2 in progress, 6 never finaled.

Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllRoof deck 1Stairs 2Kitchen remodel 3Bathroom remodel 9

3 kitchen remodel permits: 3 completed. Typically 1 days from filing to permit and 374 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Oct 3, 2024Completed
final sign-off Dec 2024
1567 Union Stadd island to kitchen at 2nd level. replace induction cooktop w/ gas range. install cabinet doors on (e) shelves above sink, convert (e) cabinet to drawers under sink area.
Details
Permit
202410032263
Status
complete
Filed
Oct 3, 2024
Permit issued
Oct 3, 2024
Final sign-off
Dec 30, 2024
Declared cost
$8,700
Address
1567 Union St

add island to kitchen at 2nd level. replace induction cooktop w/ gas range. install cabinet doors on (e) shelves above sink, convert (e) cabinet to drawers under sink area.

Open the permit page

$8,700
Feb 29, 2024Completed
final sign-off Mar 2025
30 Lopez Avresidential tenant improvement to include remodel kitchen and master suite, add new powder room, replacement windows, add/remove wall(s) located on 2nd and 3rd floor. sepearte mep permits will need to be obtained
Details
Permit
202402296820
Status
complete
Filed
Feb 29, 2024
Permit issued
Mar 1, 2024
Final sign-off
Mar 10, 2025
Declared cost
$195,000
Address
30 Lopez Av

residential tenant improvement to include remodel kitchen and master suite, add new powder room, replacement windows, add/remove wall(s) located on 2nd and 3rd floor. sepearte mep permits will need to be obtained

Open the permit page

$195,000
Jul 30, 2019Completed
final sign-off Nov 2020
1641 Lake Stkitchen remodel with bigger wall openings: remove (e) closet to make kitchen larger; relocate door opening for laundry.
Details
Permit
201907307372
Status
complete
Filed
Jul 30, 2019
Permit issued
Nov 7, 2019
Final sign-off
Nov 18, 2020
Declared cost
$12,000
Address
1641 Lake St

kitchen remodel with bigger wall openings: remove (e) closet to make kitchen larger; relocate door opening for laundry.

Open the permit page

$12,000