Back to bathroom remodel contractors
Javier Magana Construction Services
- Based in
- San Rafael
- On San Francisco permits
- Feb 2016 to Jul 2026
- Last 24 months
- 4 permits filed
18 permits since 2000: 10 completed, 2 in progress, 6 never finaled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
9 bathroom remodel permits: 3 completed, 1 in progress, 5 never finaled. Typically 0 days from filing to permit and 148 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 27, 2026 | In progress issued Jun 2026 | 30 Lopez Av | convert existing storage to new bed and bath.Details
convert existing storage to new bed and bath. | $25,000 |
| Jul 11, 2022 | Completed final sign-off Dec 2022 | 14 San Carlos St | one existing bathroom remodel: includes retiling and replacement of all fixtures in existing locations. replacement of gfci and light fixtures in all existing locations.Details
one existing bathroom remodel: includes retiling and replacement of all fixtures in existing locations. replacement of gfci and light fixtures in all existing locations. | $18,000 |
| Jul 8, 2022 | Never finaled issued Jul 2022, no final | 1125 Hampshire St | one bathroom remodel.hallway bathroom include retiling and replacement of all fixtures in existing locations. replacement of gfci and light fixtures in all existing locations.Details
one bathroom remodel.hallway bathroom include retiling and replacement of all fixtures in existing locations. replacement of gfci and light fixtures in all existing locations. | $18,000 |
| Jun 8, 2022 | Completed final sign-off Jan 2025 | 101 Liberty St | remodel all (e) bathrooms. new windows & doors. repair (e) siding in-kind. relocate (e) wood shear wall at penthouse level. widen (e) roof deck at penthouse level.Details
remodel all (e) bathrooms. new windows & doors. repair (e) siding in-kind. relocate (e) wood shear wall at penthouse level. widen (e) roof deck at penthouse level. | $55,000 |
| Apr 23, 2019 | Never finaled issued Apr 2019, no final | 300 03rd St | unit 801: retile all bathroom surfaces replace all cabinets, countertops, fixtures to remain in all (e) locations. add gfci were needed.Details
unit 801: retile all bathroom surfaces replace all cabinets, countertops, fixtures to remain in all (e) locations. add gfci were needed. | $45,000 |
| Aug 16, 2017 | Completed final sign-off Dec 2017 | 3880 22nd St | remodel existing bath, reconfigure existing closet to new powder room on second floor.Details
remodel existing bath, reconfigure existing closet to new powder room on second floor. | $45,000 |
| Dec 9, 2016 | Never finaled issued Dec 2016, no final | 1941 Grove St | replace plumbing fixtures (toilet, faucet, sinks) in powder room & hall bath; replace receptacles w/gfciDetails
replace plumbing fixtures (toilet, faucet, sinks) in powder room & hall bath; replace receptacles w/gfci | $5,000 |
| Dec 9, 2016 | Never finaled issued Dec 2016, no final | 215 Moulton St | bathroom retile, re sheetrock if needed.Details
bathroom retile, re sheetrock if needed. | $7,000 |
| Jul 14, 2016 | Never finaled issued Jul 2016, no final | 103 Liberty St | re-tile master bath, guest bath and powder room. relocate outlets in mirors. relocate electric panel to area outside of closet. relocate rough plumbing in said bathrooms.Details
re-tile master bath, guest bath and powder room. relocate outlets in mirors. relocate electric panel to area outside of closet. relocate rough plumbing in said bathrooms. | $40,000 |