James Toby
- Listed as
- engineer
- Firm
- Lea & Braze Engineering, Inc
- Based in
- Hayward
- On San Francisco permits
- Jan 2010 to Aug 2026
27 permits since 2000 (engineer on 27 permits): 7 completed, 13 in progress, 3 never finaled, 4 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 8, 2026 | In progress filed Aug 2026, not yet issued | 2550 Filbert St | Neu Haus Llc | alteration & additions to (e) 3-story residence including renovation to ground, 1st, 2nd, 3rd fls w/new cantilevered bay window in kitchen & primary closet & bath. expansion of g/f & renovations to garage, living spaces, kitchen, bedrms, & baths, new attached jadu (unit3) & new windows & doors, hvacDetails
alteration & additions to (e) 3-story residence including renovation to ground, 1st, 2nd, 3rd fls w/new cantilevered bay window in kitchen & primary closet & bath. expansion of g/f & renovations to garage, living spaces, kitchen, bedrms, & baths, new attached jadu (unit3) & new windows & doors, hvac | $625,000 |
| Apr 15, 2026 | In progress filed Apr 2026, not yet issued | 94 Aloha Av | vertical & horizontal addition, 3-story expansion focused on rear yard across both levels, front facade updated finishes, new windows, new bay window addition, landscape & drainage- water-reistant landscape will enhance erosion control, deep root systems & new drainage system. 2/f & 3/f rear balconyDetails
vertical & horizontal addition, 3-story expansion focused on rear yard across both levels, front facade updated finishes, new windows, new bay window addition, landscape & drainage- water-reistant landscape will enhance erosion control, deep root systems & new drainage system. 2/f & 3/f rear balcony | $500,000 | |
| Feb 12, 2026 | In progress filed Feb 2026, not yet issued | 80 San Fernando Wy | D V Rasmussen & Son Inc. | new basement excavation & replace (e) foundation walls. rebuild main level sunroom, trellis & chemney in same location (like for like). re-frame & strenhthen roof framing. replace garage door. new exterior windows, doors in (e) locations, new exterior paint. new partitions. interior finishes,Details
new basement excavation & replace (e) foundation walls. rebuild main level sunroom, trellis & chemney in same location (like for like). re-frame & strenhthen roof framing. replace garage door. new exterior windows, doors in (e) locations, new exterior paint. new partitions. interior finishes, | $750,000 |
| Nov 13, 2025 | In progress issued Dec 2025 | 214 Spruce St | Young & Burton Inc | course of construction revision to pa 202410293938: updated foundation and details only; all other revisions under pa 202508122863 (rev 3). no work in public right of wayDetails
course of construction revision to pa 202410293938: updated foundation and details only; all other revisions under pa 202508122863 (rev 3). no work in public right of way | $12,900 |
| Aug 13, 2025 | Completed final sign-off Oct 2025 | 2143 Wawona St | revision to 202204152310 to show minor changes during construction, non structral.Details
revision to 202204152310 to show minor changes during construction, non structral. | ||
| Jun 13, 2025 | In progress issued May 2026 | 2950 Pacific Av | Plath & Company Inc | facade alt and addition of 2 basement levels to (e).windows replacement,addition of garage and landscaping elements.new ped and vehicular entrance from broadway.interior renovation and relocate of elevator. rev to pa201602028565.Details
facade alt and addition of 2 basement levels to (e).windows replacement,addition of garage and landscaping elements.new ped and vehicular entrance from broadway.interior renovation and relocate of elevator. rev to pa201602028565. | $1,200,000 |
| Jul 30, 2024 | In progress issued Oct 2024 | 1212 19th St | Vonnegut Thoreau Construction | rear yard retaining wall. building currently being converted to two family under pa# 202211176785.Details
rear yard retaining wall. building currently being converted to two family under pa# 202211176785. | $23,000 |
| Apr 29, 2024 | In progress issued Jan 2025 | 2790 Broadway | Moroso Construction Inc | interior remodel @ all levels.work includes(1)replacing(e)elevator,(2)extending main staircase to two lower fls,replacing(e)secondary staircase. excavation of crawl space at first floor for new habitable space.Details
interior remodel @ all levels.work includes(1)replacing(e)elevator,(2)extending main staircase to two lower fls,replacing(e)secondary staircase. excavation of crawl space at first floor for new habitable space. | $2,250,000 |
| Apr 22, 2024 | In progress issued Feb 2025 | 3355 Pacific Av | Fma Builders, Partners Contracting Inc. | revision to pa 202108236937. change media and gym rooms to new natatorium. expand scope of work to include new interior swimming pool, subterranean mechanical, electrical, and pool equipment vault beneath rear yard. no change to building exterior or conditioned area. add new fire sprinkler system thDetails
revision to pa 202108236937. change media and gym rooms to new natatorium. expand scope of work to include new interior swimming pool, subterranean mechanical, electrical, and pool equipment vault beneath rear yard. no change to building exterior or conditioned area. add new fire sprinkler system th | $850,000 |
| Jan 23, 2024 | In progress filed Jan 2024, not yet issued | 166 Woodland Av | driveway repavingDetails
driveway repaving | $2,000 | |
| Jan 23, 2024 | In progress filed Jan 2024, not yet issued | 156 Woodland Av | driveway repavingDetails
driveway repaving | $2,000 | |
| Dec 13, 2023 | In progress issued Aug 2024 | 4024 25th St | Cook Construction | to erect a 4-story, 2 residential units, r-3, type vb building.Details
to erect a 4-story, 2 residential units, r-3, type vb building. | $1,600,000 |
| Jul 1, 2022 | In progress issued Jan 2026 | 144 Laidley St | Barron Construction Inc. | bldg b: erect 4-story over 1 basement, type 5b, single family dwelling with 1 adu. project to include lot split. (demo under pa# 202207017611. new construction bldg a pa# 202207017587).Details
bldg b: erect 4-story over 1 basement, type 5b, single family dwelling with 1 adu. project to include lot split. (demo under pa# 202207017611. new construction bldg a pa# 202207017587). | $1,500,000 |
| Jul 1, 2022 | In progress issued Jan 2026 | 144 Laidley St | Barron Construction Inc. | bldg a: erect 4-story over 1 basement, type 5b, single family dwelling with 1 adu. project to include lot split. (demo under pa# 202207017611. new construction bldg b pa# 202207017622).Details
bldg a: erect 4-story over 1 basement, type 5b, single family dwelling with 1 adu. project to include lot split. (demo under pa# 202207017611. new construction bldg b pa# 202207017622). | $1,500,000 |
| Apr 15, 2022 | Completed final sign-off Oct 2025 | 2143 Wawona St | Soil Engineering Construction | build retaining wall behind house.Details
build retaining wall behind house. | $80,000 |
| Nov 24, 2021 | Never finaled filed Nov 2021, never issued | 352 Castro St | Podesta Construction Inc | new backyard site work that includes new planting, decks & retaining walls.Details
new backyard site work that includes new planting, decks & retaining walls. | $30,000 |
| Mar 29, 2021 | Expired or cancelled expired Jan 2025 | 801 Sanchez St | Matarozzi/Pelsinger Builders Inc. | revision to pa 201902284043 s2. upgraded grading, drainage and structural design to accommodate for enlarged basement footprint and revised layout. adjusted column location on main level, sunken living room flr, and layout changes to 2nd fl.Details
revision to pa 201902284043 s2. upgraded grading, drainage and structural design to accommodate for enlarged basement footprint and revised layout. adjusted column location on main level, sunken living room flr, and layout changes to 2nd fl. | |
| May 16, 2019 | Expired or cancelled cancelled May 2025 | 60 Laidley St | Design Line Construction | erect type 5, single family, 3 story bldg with 1 basement.type 5Details
erect type 5, single family, 3 story bldg with 1 basement.type 5 | $1,750,000 |
| Mar 21, 2019 | Never finaled issued Aug 2019, no final | 25 San Jacinto Wy | Modernscapes Sf | backyard - concrete retaining walls and staris, outdoor kitchen, firepit sideyard - stone on concrete stairs frontyard - paver drivewayDetails
backyard - concrete retaining walls and staris, outdoor kitchen, firepit sideyard - stone on concrete stairs frontyard - paver driveway | $193,000 |
| Mar 15, 2019 | Expired or cancelled cancelled Nov 2022 | 1651 08th Av | landscape renovation including engineered footings for new wood fence, concrete stairs with stone veneer low retaining walls 3' mas in front yard and row. metal trellis 8' high maxDetails
landscape renovation including engineered footings for new wood fence, concrete stairs with stone veneer low retaining walls 3' mas in front yard and row. metal trellis 8' high max | $225,000 | |
| Jan 29, 2019 | Never finaled filed Jan 2019, never issued | 1 Zoo Rd | Nibbi Bros Assoc Inc. | lemur forest expansion of (e) boardwalk animal holding bldg. plaza lvl redesign, landscaping & public viewing areas. primary function of the bldg is to provide facilities for animal holding & wellness, animal mgmt support spaces & public viewing areas.Details
lemur forest expansion of (e) boardwalk animal holding bldg. plaza lvl redesign, landscaping & public viewing areas. primary function of the bldg is to provide facilities for animal holding & wellness, animal mgmt support spaces & public viewing areas. | $3,223,290 |
| Aug 8, 2018 | Expired or cancelled cancelled Nov 2025 | 62 Laidley St | Design Line Construction | erect type 5, single family, 3 story bldg w/1 basement.Details
erect type 5, single family, 3 story bldg w/1 basement. | $1,950,000 |
| Oct 16, 2015 | Completed final sign-off Aug 2017 | 2628 Broderick St | Scott & Warner Builders Inc | replacement of retaining wall, new drains, drainage piping at rear yard. shoring of the existing bldg during construction. n/a maher ordinanceDetails
replacement of retaining wall, new drains, drainage piping at rear yard. shoring of the existing bldg during construction. n/a maher ordinance | $80,000 |
| Sep 22, 2014 | Completed final sign-off Dec 2014 | 7 Kronquist Ct | Matarozzi/Pelsinger Builders Inc. | replace 2 existing retaining walls, fences on n. & s. property lines, concrete stairs, & replace surface at deck.Details
replace 2 existing retaining walls, fences on n. & s. property lines, concrete stairs, & replace surface at deck. | $150,000 |
| Sep 10, 2013 | Completed final sign-off Apr 2014 | 200 Kansas St | Swinerton Builders | tenant improvement of 1st floor of (e) design warehouse building. construction of a day care center for 126 children.Details
tenant improvement of 1st floor of (e) design warehouse building. construction of a day care center for 126 children. | $1,581,483 |
| Jun 1, 2011 | Completed final sign-off Apr 2013 | 646 Dolores St | Bauman Landscape & Construction Inc. | retaining wall construction. demo (e) play equipment, ashphalt & site furnishings. site grading. installation of storm water collection. connect to strom main drinking fountains, 2 pole lights, driveway & ada path.Details
retaining wall construction. demo (e) play equipment, ashphalt & site furnishings. site grading. installation of storm water collection. connect to strom main drinking fountains, 2 pole lights, driveway & ada path. | $1,200,000 |
| Jan 25, 2010 | Completed final sign-off Nov 2010 | 2 Quintara St | revision to pa #200504079360- grading & drainage.Details
revision to pa #200504079360- grading & drainage. |