Vonnegut Thoreau Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2011 to Sep 2026
- Last 24 months
- 10 permits filed
123 permits since 2000: 83 completed, 11 in progress, 15 never finaled, 14 expired or cancelled.
Of the 15 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 123.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 2, 2026 | In progress filed Sep 2026, not yet issued | 19 Topaz Wy | to obtain final inspection for work approved under pa#202002205017 & 200110261794.Details
to obtain final inspection for work approved under pa#202002205017 & 200110261794. | |
| Jul 22, 2026 | In progress issued Sep 2026 | 250 Laurel St | unit 202-remodel and reconfigure the primary bathroom. reconfigure the coat laundry closets. new kitchen flooring. replace 5 street facing wood windows in kind.Details
unit 202-remodel and reconfigure the primary bathroom. reconfigure the coat laundry closets. new kitchen flooring. replace 5 street facing wood windows in kind. | $51,069 |
| Jul 17, 2026 | In progress issued Jul 2026 | 1212 19th St | revision to pa# 202211176785: to reflect removal of one interior door at 1st floor from scope.Details
revision to pa# 202211176785: to reflect removal of one interior door at 1st floor from scope. | |
| Jun 26, 2026 | In progress issued Jul 2026 | 165 Francisco St | remodel of (e) kitchen, 3 bathrooms and interior finishes.Details
remodel of (e) kitchen, 3 bathrooms and interior finishes. | $148,000 |
| Jun 1, 2026 | In progress issued Jun 2026 | 1039 Vallejo St | bathroom remodel on 1st floor like for like.Details
bathroom remodel on 1st floor like for like. | $22,000 |
| May 7, 2026 | In progress issued May 2026 | 1212 19th St | to obtain final inspection for work approved under pa# 202206176579 & 202404180214. all work is complete.Details
to obtain final inspection for work approved under pa# 202206176579 & 202404180214. all work is complete. | |
| Feb 23, 2026 | In progress issued Feb 2026 | 1634 Dolores St | level 1: interior work including remodel of (e) bathroom and new laundry. no proposed work on level 2.Details
level 1: interior work including remodel of (e) bathroom and new laundry. no proposed work on level 2. | $50,000 |
| Jul 24, 2025 | Completed final sign-off Sep 2025 | 2020 Great Hy | kitchen remodel: countertops and appliances. 1- bathroom: retile due to water damage.Details
kitchen remodel: countertops and appliances. 1- bathroom: retile due to water damage. | $30,000 |
| Jul 21, 2025 | In progress issued Jul 2025 | 19 Topaz Wy | to convert the existing basement into the bedroom , bathroom and family room. 960 square feet dof conditioned space . to replace existing stairs with code compliant new stairs. new exterior deck and stairs down to the backyard.Details
to convert the existing basement into the bedroom , bathroom and family room. 960 square feet dof conditioned space . to replace existing stairs with code compliant new stairs. new exterior deck and stairs down to the backyard. | $50,000 |
| Dec 11, 2024 | Completed final sign-off Sep 2025 | 250 Laurel St | unit 101: kitchen and 2 bath remodel, update electrical, replace fireplace with gas insertDetails
unit 101: kitchen and 2 bath remodel, update electrical, replace fireplace with gas insert | $70,000 |
| Aug 12, 2024 | Completed final sign-off Jan 2025 | 4229 Moraga St | revision to pa # 2024-0513-1955. remove depressed slab & drain from scope. install two walkable skylights on roof deckDetails
revision to pa # 2024-0513-1955. remove depressed slab & drain from scope. install two walkable skylights on roof deck | $5,000 |
| Jul 30, 2024 | In progress issued Oct 2024 | 1212 19th St | rear yard retaining wall. building currently being converted to two family under pa# 202211176785.Details
rear yard retaining wall. building currently being converted to two family under pa# 202211176785. | $23,000 |
| Jun 14, 2024 | Completed final sign-off Dec 2024 | 4229 Moraga St | replace (e) french door w/ (n) bifold door, at rear of house. not street visible. ufactor-.3, shgc-.25, no structural change. same location & same size.Details
replace (e) french door w/ (n) bifold door, at rear of house. not street visible. ufactor-.3, shgc-.25, no structural change. same location & same size. | $9,000 |
| May 13, 2024 | Completed final sign-off Dec 2024 | 4229 Moraga St | replace (e) window with a door at south wall not visible from the street. add 3'x6'x4' slab with drain.Details
replace (e) window with a door at south wall not visible from the street. add 3'x6'x4' slab with drain. | $10,000 |
| May 6, 2024 | Completed final sign-off Dec 2024 | 4229 Moraga St | remodel 3 bathrooms, 1 kitchen in kindDetails
remodel 3 bathrooms, 1 kitchen in kind | $110,000 |
| Feb 28, 2023 | Completed final sign-off Jun 2023 | 1039 Vallejo St | kitchen remodel , no structural work. no walls moved. floor plan to remain unchanged. adaptable features, mep, no alterations to windows and doors, no work outside unit (remodel in-kind)Details
kitchen remodel , no structural work. no walls moved. floor plan to remain unchanged. adaptable features, mep, no alterations to windows and doors, no work outside unit (remodel in-kind) | $50,000 |
| Nov 17, 2022 | In progress issued Nov 2023 | 1212 19th St | remodel of (e)2 story bldg & interior remodelthroughtout,including re-build & expansion of (e)noncompliant 3rd floor.relocation of exterior stairs @ rear & expansion of rear volume @ 1st fl within setback.rear volume to become conditioned space. 1st floor to become 2nd unit. 3rd fl vert add & horizDetails
remodel of (e)2 story bldg & interior remodelthroughtout,including re-build & expansion of (e)noncompliant 3rd floor.relocation of exterior stairs @ rear & expansion of rear volume @ 1st fl within setback.rear volume to become conditioned space. 1st floor to become 2nd unit. 3rd fl vert add & horiz | $220,000 |
| Jun 17, 2022 | Never finaled issued Aug 2022, no final | 1212 19th St | interior remodel of an existing building including new interior stair connecting 1st and 2nd floor, and foundation replacement.Details
interior remodel of an existing building including new interior stair connecting 1st and 2nd floor, and foundation replacement. | $370,000 |
| May 26, 2022 | Completed final sign-off Jul 2024 | 2457 Scott St | renovation to create compliant ceiling heights for habitable space on basement level. work also includes in-kind replacement of retaining walls at upper basement, foundation and slab. minor interior work at level 1,2,3. new skylights. patio door replacement and rear yard improvements.Details
renovation to create compliant ceiling heights for habitable space on basement level. work also includes in-kind replacement of retaining walls at upper basement, foundation and slab. minor interior work at level 1,2,3. new skylights. patio door replacement and rear yard improvements. | $195,000 |
| May 13, 2022 | In progress issued Feb 2024 | 241 Mississippi St | revision to bpa# 202112134325 to include the following: extend the 1/f at the rear of bldg. create a deck at the 2/f. fix foundation as needed. rearrange stair on the lower unit. adding & replacing (n) windows as needed.Details
revision to bpa# 202112134325 to include the following: extend the 1/f at the rear of bldg. create a deck at the 2/f. fix foundation as needed. rearrange stair on the lower unit. adding & replacing (n) windows as needed. | $22,000 |
| Mar 24, 2022 | Completed final sign-off Feb 2023 | 1854 Grant Av | kitchen remodel- new cabinets, tile, and countertops. replace lighting, receptacles, and fixtures in kind.Details
kitchen remodel- new cabinets, tile, and countertops. replace lighting, receptacles, and fixtures in kind. | $40,000 |
| Dec 24, 2021 | Completed final sign-off Jul 2022 | 479 Douglass St | kitchen remodel: new cabinets, tile and countertops. replace lighting, receptacles, and fixtures in kind. change existing pony wall to a full wall.Details
kitchen remodel: new cabinets, tile and countertops. replace lighting, receptacles, and fixtures in kind. change existing pony wall to a full wall. | $75,000 |
| Nov 10, 2021 | Completed final sign-off Jul 2022 | 72 Macondray Ln | remove and replace drywall, add plaster finish. hardwood floors to be replaced. install gas fireplace appliance in (e) fireplace, to replace (e) unit. "direct-vent type" fireplace only.Details
remove and replace drywall, add plaster finish. hardwood floors to be replaced. install gas fireplace appliance in (e) fireplace, to replace (e) unit. "direct-vent type" fireplace only. | $5,000 |
| Oct 20, 2021 | Completed final sign-off Oct 2022 | 3349 Broderick St | rev to pa# 2020-1231-1987; to incorporate new parapets/railings at previously approved roof deckDetails
rev to pa# 2020-1231-1987; to incorporate new parapets/railings at previously approved roof deck | |
| Sep 16, 2021 | Completed final sign-off Feb 2022 | 1206 19th St | to obtain final inspection for work approved under permit application numbers 201804247263, 201907014745 & 201907226554. all work is complete.Details
to obtain final inspection for work approved under permit application numbers 201804247263, 201907014745 & 201907226554. all work is complete. | |
| Aug 2, 2021 | Completed final sign-off Jul 2022 | 72 Macondray Ln | window replacement none on front of building. all work at rear, not street-visible. replace (e) doors and windows w/ aluminum clad in same location.Details
window replacement none on front of building. all work at rear, not street-visible. replace (e) doors and windows w/ aluminum clad in same location. | $22,000 |
| Apr 8, 2021 | Completed final sign-off Oct 2022 | 3349 Broderick St | voluntary structural upgradeDetails
voluntary structural upgrade | $30,000 |
| Apr 1, 2021 | Completed final sign-off Apr 2021 | 581 Waller St | renew pa # 201706088839 for final inspection as requested by the district inspector. all work is done.Details
renew pa # 201706088839 for final inspection as requested by the district inspector. all work is done. | |
| Feb 16, 2021 | Completed final sign-off Jan 2023 | 2457 Scott St | renovation of 2nd floor bathroom. cabinet installation in 2nd floor bedroom. window replacement on west & north (non street facing) sides. 12 windows total. all work in kind.Details
renovation of 2nd floor bathroom. cabinet installation in 2nd floor bedroom. window replacement on west & north (non street facing) sides. 12 windows total. all work in kind. | $40,000 |
| Jan 6, 2021 | Completed final sign-off Jul 2021 | 2801 Jackson St | #7: new kitchen cabinetry and drywall work. new bathroom cabinetry + drywall + fixture replacement. kitchen and bathroom to be remodeled are existing.Details
#7: new kitchen cabinetry and drywall work. new bathroom cabinetry + drywall + fixture replacement. kitchen and bathroom to be remodeled are existing. | $13,500 |
| Dec 31, 2020 | Completed final sign-off Oct 2022 | 3349 Broderick St | construct (n) 334 sq ft. roof deck at 4th flr of (e) 5,316 sq ft 3-unit building. roof deck to serve unit 3349. no (n) area added to (e) dwelling. (n) interiors work under pa 202007230748.Details
construct (n) 334 sq ft. roof deck at 4th flr of (e) 5,316 sq ft 3-unit building. roof deck to serve unit 3349. no (n) area added to (e) dwelling. (n) interiors work under pa 202007230748. | $40,000 |
| Dec 23, 2020 | Completed final sign-off Jan 2023 | 2811 Vallejo St | removal of (e) garage doors and center post, install double-wide garage door. no mechanical work. (n) roof deck above 5th level.Details
removal of (e) garage doors and center post, install double-wide garage door. no mechanical work. (n) roof deck above 5th level. | $23,000 |
| Jul 23, 2020 | Completed final sign-off Jan 2023 | 3349 Broderick St | remodel e 5316 sf 4 story 3 unit residential w 2 car garage. new exterior windows 2nd and 3rd floor. 3rd fl new kitchen area, new elec/lighting.new powder room, new bath. 4th fl: new master bedroom and master bath. new powder roomDetails
remodel e 5316 sf 4 story 3 unit residential w 2 car garage. new exterior windows 2nd and 3rd floor. 3rd fl new kitchen area, new elec/lighting.new powder room, new bath. 4th fl: new master bedroom and master bath. new powder room | $175,000 |
| Jul 9, 2020 | Completed final sign-off May 2021 | 2457 Scott St | revision to app#201907085286 with new 210 sqft roof deck. new 1 hour rated parapet & glass guardrail. new sliding glass door to access roof deck.Details
revision to app#201907085286 with new 210 sqft roof deck. new 1 hour rated parapet & glass guardrail. new sliding glass door to access roof deck. | $20,000 |
| Jan 31, 2020 | Completed final sign-off Apr 2021 | 2457 Scott St | replace in kind, 2 existing exterior windows at the north property line. work not visible from street.Details
replace in kind, 2 existing exterior windows at the north property line. work not visible from street. | $10,000 |
| Oct 21, 2019 | Completed final sign-off Feb 2022 | 1206 19th St | revision to 201710131186 to replace proposed wood clad windows with metal clad windowsDetails
revision to 201710131186 to replace proposed wood clad windows with metal clad windows | |
| Oct 15, 2019 | Completed final sign-off May 2021 | 2457 Scott St | reconfigure interior stairs from basement to 3rd level. reconfigure extg powder room. new mudroom, kitchen renovation.revision to app#201907085286Details
reconfigure interior stairs from basement to 3rd level. reconfigure extg powder room. new mudroom, kitchen renovation.revision to app#201907085286 | $200,000 |
| Aug 22, 2019 | Completed final sign-off Jan 2023 | 2811 Vallejo St | structural revision to pa# 2019-0404-7110. replacement of exitin foundatrion along ease-west wall and replacement of stair framing.Details
structural revision to pa# 2019-0404-7110. replacement of exitin foundatrion along ease-west wall and replacement of stair framing. | $20,000 |
| Jul 22, 2019 | Expired or cancelled expired Feb 2022 | 1206 19th St | revision to 201710131186-s2. to identify further demo scope needed to perform (e) scope of work and provide updated demo percentage calcs.Details
revision to 201710131186-s2. to identify further demo scope needed to perform (e) scope of work and provide updated demo percentage calcs. | |
| Jul 8, 2019 | Completed final sign-off May 2021 | 2457 Scott St | replace (e)dry rotted frame below front stoop. (n) gas inserts at 2(e) fireplaces. restore orig window size at 1 location at front facade. reconfig int walls at 2nd lvl. (n)master suite & laundry room. remove paritial ht partitions at 3rd lvl, remove bath, (n) wet bar. upgrade electr, plumb fixturesDetails
replace (e)dry rotted frame below front stoop. (n) gas inserts at 2(e) fireplaces. restore orig window size at 1 location at front facade. reconfig int walls at 2nd lvl. (n)master suite & laundry room. remove paritial ht partitions at 3rd lvl, remove bath, (n) wet bar. upgrade electr, plumb fixtures | $30,000 |
| Jul 1, 2019 | Expired or cancelled expired Feb 2022 | 1206 19th St | revision to 201710131186 s2 to clarify scope of demolition. no additional work or demo proposed under this permit; revision on sheet a2.10 only.Details
revision to 201710131186 s2 to clarify scope of demolition. no additional work or demo proposed under this permit; revision on sheet a2.10 only. | |
| Jun 24, 2019 | Completed final sign-off Dec 2019 | 2811 Vallejo St | revision to pa #201904047110. replacement of existing cement board siding at new gym level with plaster to match rest of facade.Details
revision to pa #201904047110. replacement of existing cement board siding at new gym level with plaster to match rest of facade. | |
| Apr 4, 2019 | Completed final sign-off Dec 2019 | 2811 Vallejo St | new finishes at unfinished space below basement. new door, new window, new half bath.Details
new finishes at unfinished space below basement. new door, new window, new half bath. | $70,000 |
| Jan 2, 2019 | Expired or cancelled disapproved Mar 2019 | 3075 21st St | strengthening of extg foundation and addition of interior grade beams, (low hazard storage group)Details
strengthening of extg foundation and addition of interior grade beams, (low hazard storage group) | $37,000 |
| Nov 2, 2018 | Completed final sign-off Feb 2022 | 1206 19th St | provide installation sequence plan to accomodate soundhon excavation for permit 201804247263Details
provide installation sequence plan to accomodate soundhon excavation for permit 201804247263 | $10,000 |
| Oct 3, 2018 | Completed final sign-off Dec 2019 | 2811 Vallejo St | new roof deck 260 sf and operable skylight. upgrade rear wall to 1 hr fire rated construction.Details
new roof deck 260 sf and operable skylight. upgrade rear wall to 1 hr fire rated construction. | $32,000 |
| Sep 27, 2018 | Completed final sign-off Apr 2021 | 581 Waller St | revision to app#201703080948s2/r1, 201706088839, and 201802211891 administrative permit only to correct nov #201892701 bld permit. suspension per planning department requestDetails
revision to app#201703080948s2/r1, 201706088839, and 201802211891 administrative permit only to correct nov #201892701 bld permit. suspension per planning department request | |
| Sep 13, 2018 | Completed final sign-off Dec 2019 | 2811 Vallejo St | replacement of light fixtures. replacement of kitchen countertop and appliances addition of tub room, new laundry room at basementDetails
replacement of light fixtures. replacement of kitchen countertop and appliances addition of tub room, new laundry room at basement | $100,000 |
| Aug 16, 2018 | Completed final sign-off Apr 2021 | 581 Waller St | revision to pa# 201703080948-s2 to revise dormer back to original site permit configuration.Details
revision to pa# 201703080948-s2 to revise dormer back to original site permit configuration. | |
| Apr 24, 2018 | Expired or cancelled expired Feb 2022 | 1206 19th St | new concrete foudation to replace e brick foundations. new slab on grade to replace e . all work at basement level.Details
new concrete foudation to replace e brick foundations. new slab on grade to replace e . all work at basement level. | $30,000 |
| Feb 27, 2018 | Never finaled issued Apr 2018, no final | 235 Kansas St | revision to 201704043137 - added new structural scopes with approved arch. change back in permit 201704043137 maher naDetails
revision to 201704043137 - added new structural scopes with approved arch. change back in permit 201704043137 maher na | |
| Feb 21, 2018 | Completed final sign-off Apr 2021 | 581 Waller St | exploratory interior demo to locate structure and service in advance of remodel, max 500 sf drywall removal in relation to pa# 201703080948Details
exploratory interior demo to locate structure and service in advance of remodel, max 500 sf drywall removal in relation to pa# 201703080948 | $1,500 |
| Feb 8, 2018 | Completed final sign-off Jun 2018 | 601 04th St | revision to 201710302583 remove post and add header connection maher naDetails
revision to 201710302583 remove post and add header connection maher na | $200 |
| Jan 4, 2018 | Never finaled issued Jan 2018, no final | 2931 Pierce St | revision to pa 2016-0916-8038 - elimination of 2 front skylights, keep existing supports for gable roof, structural field revisionsDetails
revision to pa 2016-0916-8038 - elimination of 2 front skylights, keep existing supports for gable roof, structural field revisions | |
| Oct 30, 2017 | Completed final sign-off Jun 2018 | 601 04th St | #320: interior loft renovation. kitchen remodel, expansion of mezzanine and addition of a second bathroom at the mezzanine level. maher naDetails
#320: interior loft renovation. kitchen remodel, expansion of mezzanine and addition of a second bathroom at the mezzanine level. maher na | $100,000 |
| Oct 18, 2017 | Completed final sign-off Oct 2017 | 783 12th Av | to obtain final inspection for work approved under pa# 201403140796. all work is complete.Details
to obtain final inspection for work approved under pa# 201403140796. all work is complete. | |
| Oct 18, 2017 | Completed final sign-off Nov 2017 | 851 45th Av | to comply with nov 201710491, new concrete at front to provide min. 20% front setback as landscaing and 50% front setback as permeable surfaces.Details
to comply with nov 201710491, new concrete at front to provide min. 20% front setback as landscaing and 50% front setback as permeable surfaces. | $2,500 |
| Oct 13, 2017 | Completed final sign-off Feb 2022 | 1206 19th St | interior remodel,infill portion of(e)deck with (n) conditioned space @ second floor only and(n)roof over conditioned space, demolish(e)garage bay @ ground fl level only, (n) garage door & wall to align w/(e)facade above, addition @ north west corner of bldg. remove(e)deck at rear 13"-11"portionDetails
interior remodel,infill portion of(e)deck with (n) conditioned space @ second floor only and(n)roof over conditioned space, demolish(e)garage bay @ ground fl level only, (n) garage door & wall to align w/(e)facade above, addition @ north west corner of bldg. remove(e)deck at rear 13"-11"portion | $525,000 |
| Aug 10, 2017 | Never finaled issued Jan 2018, no final | 235 Kansas St | revision to approved pa# 201701096768, (e) hvac system to remain, construction of interior partitions in existing commercial spaceDetails
revision to approved pa# 201701096768, (e) hvac system to remain, construction of interior partitions in existing commercial space | $3,000 |
| Jul 27, 2017 | Completed final sign-off Aug 2017 | 10 Crown Tr | to obtain final inspection for work approved uner pa # 200706063193 and 200806093994. all work is completeDetails
to obtain final inspection for work approved uner pa # 200706063193 and 200806093994. all work is complete | |
| Jul 27, 2017 | Completed final sign-off Aug 2017 | 10 Crown Tr | to obtain final inspection for work approved under pa # 307394; 9112327; 200705181758. all work is complete.Details
to obtain final inspection for work approved under pa # 307394; 9112327; 200705181758. all work is complete. | |
| Apr 7, 2017 | Completed final sign-off Jun 2019 | 3735 20th St | repair rear deck in kind less than 50%, deck is off 2nd floor, not visible from street.Details
repair rear deck in kind less than 50%, deck is off 2nd floor, not visible from street. | $5,000 |
| Apr 4, 2017 | Never finaled issued May 2017, no final | 235 Kansas St | replacement of 2 (e) faux windows with 2 (n) true windows to match adjacent (e) windowsDetails
replacement of 2 (e) faux windows with 2 (n) true windows to match adjacent (e) windows | $7,500 |
| Mar 8, 2017 | Completed final sign-off Apr 2021 | 581 Waller St | a new dormer, set back 12'6" from front. repair facade, new windows, new front stair, new siding. 80 sq. 1 story addition horizontal. new deckDetails
a new dormer, set back 12'6" from front. repair facade, new windows, new front stair, new siding. 80 sq. 1 story addition horizontal. new deck | $100,000 |
| Feb 7, 2017 | Completed final sign-off Jun 2017 | 234 Townsend St | t.i.: renovation of (e) restaurant space. replacing the bar, installation of built-in seating, replacement of fixtures an finishes and accessibility upgrades. fire life saftey will be under sep permit.Details
t.i.: renovation of (e) restaurant space. replacing the bar, installation of built-in seating, replacement of fixtures an finishes and accessibility upgrades. fire life saftey will be under sep permit. | $32,000 |
| Jan 12, 2017 | Never finaled issued Jan 2017, no final | 234 Townsend St | g/f -partial demolition of some int. finishes, removal of plumbing fixtures; removal of lighting fixtures. no removal of walls or partitions ; ti under separate permit. ab-017 appliesDetails
g/f -partial demolition of some int. finishes, removal of plumbing fixtures; removal of lighting fixtures. no removal of walls or partitions ; ti under separate permit. ab-017 applies | $1,000 |
| Jan 9, 2017 | Completed final sign-off May 2018 | 235 Kansas St | renovation of commercial space with new finishes and elec at interior. replacement of existing ductwork only with no change to mechanicalDetails
renovation of commercial space with new finishes and elec at interior. replacement of existing ductwork only with no change to mechanical | $54,000 |
| Sep 16, 2016 | Never finaled issued Apr 2017, no final | 2931 Pierce St | proposed interior remodel of kitchen, replacement of main interior stair, master bedroom and bathroom remodel. remodel incudes new windows, skylights, plumbing/electrical fixtures and appliances.Details
proposed interior remodel of kitchen, replacement of main interior stair, master bedroom and bathroom remodel. remodel incudes new windows, skylights, plumbing/electrical fixtures and appliances. | $350,000 |
| May 4, 2016 | Completed final sign-off Oct 2018 | 195 Magellan Av | remove (e) aluminum single glazed window & uinfill wall. add new aluminum window woth insulated glass at a similar location. revision to ref pa 2016 0127 8089Details
remove (e) aluminum single glazed window & uinfill wall. add new aluminum window woth insulated glass at a similar location. revision to ref pa 2016 0127 8089 | $500 |
| Mar 2, 2016 | Expired or cancelled cancelled Apr 2019 | 1763 Green St | rear expansion of bottom unit of(e)2 unit bldg;add living rm,1 bedrm & bath at bsmt. including the garage level + 1st flr level are to be expanded toward the rear yard under an (e) deck. new exterior doors + windows will be installed at the rear elevation. no change to street facade of the building.Details
rear expansion of bottom unit of(e)2 unit bldg;add living rm,1 bedrm & bath at bsmt. including the garage level + 1st flr level are to be expanded toward the rear yard under an (e) deck. new exterior doors + windows will be installed at the rear elevation. no change to street facade of the building. | $72,000 |
| Feb 3, 2016 | Never finaled issued Feb 2018, no final | 241 Mississippi St | to comply with nov: 201414942 & 201576552: remove and replace roof, 3rd floor joist, walls as shown, rebuild same. seismic retrofit. remodel (e) structure interior. all new mep. maher naDetails
to comply with nov: 201414942 & 201576552: remove and replace roof, 3rd floor joist, walls as shown, rebuild same. seismic retrofit. remodel (e) structure interior. all new mep. maher na | $500,000 |
| Jan 27, 2016 | Completed final sign-off Oct 2018 | 195 Magellan Av | replace exterior doors & windows. remove rear 2nd floor deck and remodel (e) kitchen, remodel (e) bathrooms and interior partitions. reconfigure (e) stair. new furnace & w/h. addition of 1 full bath.Details
replace exterior doors & windows. remove rear 2nd floor deck and remodel (e) kitchen, remodel (e) bathrooms and interior partitions. reconfigure (e) stair. new furnace & w/h. addition of 1 full bath. | $150,000 |
| Jan 4, 2016 | Completed final sign-off Apr 2016 | 568 Sacramento St | t-24 compliance, see pa 201509288192 and 201510190069; maher n/aDetails
t-24 compliance, see pa 201509288192 and 201510190069; maher n/a | |
| Oct 19, 2015 | Completed final sign-off Dec 2016 | 568 Sacramento St | installation and relocation of back of bar service equipment, no work on (e) kitchen. accessibility upgrades in ref pa 2015 0928 8192. fire protection alarm under sep permit. maher naDetails
installation and relocation of back of bar service equipment, no work on (e) kitchen. accessibility upgrades in ref pa 2015 0928 8192. fire protection alarm under sep permit. maher na | $40,000 |
| Oct 6, 2015 | Completed final sign-off Nov 2015 | 1937 Chestnut St | repair & replace in-kind (e) rear yard deckDetails
repair & replace in-kind (e) rear yard deck | $25,000 |
| Aug 4, 2015 | Never finaled filed Aug 2015, never issued | 2253 California St | street spaceDetails
street space | |
| Aug 3, 2015 | Completed final sign-off Feb 2016 | 102 Walnut St | alteration to extg condo at 102 walnut street. add new skylight (flat) 48x48 facing jackson street.Details
alteration to extg condo at 102 walnut street. add new skylight (flat) 48x48 facing jackson street. | $10,000 |
| Jul 13, 2015 | Completed final sign-off Aug 2015 | 2253 California St | removal of non-conforming bathroom & kitchen at existing 1st floor of 2253 calif. 1st floor area to be converted to legal storage use for unit 2253 calif. st. no exterior work, no structural or mechanical work. no change to square footage of bldg.Details
removal of non-conforming bathroom & kitchen at existing 1st floor of 2253 calif. 1st floor area to be converted to legal storage use for unit 2253 calif. st. no exterior work, no structural or mechanical work. no change to square footage of bldg. | $950 |
| Jul 9, 2015 | Completed final sign-off Feb 2016 | 102 Walnut St | alteration to exist ing condo, 102 walnut. 1st fl increase opening between dining and kitchen areas, new built ins, finishes, new lighting. 2nd/3rd fl bath remodel, new built ins, finishes, lightingDetails
alteration to exist ing condo, 102 walnut. 1st fl increase opening between dining and kitchen areas, new built ins, finishes, new lighting. 2nd/3rd fl bath remodel, new built ins, finishes, lighting | $45,000 |
| May 26, 2015 | Completed final sign-off Aug 2015 | 2253 California St | to comply with physical inspections report #cc-7894Details
to comply with physical inspections report #cc-7894 | $20,000 |
| Apr 24, 2015 | Expired or cancelled cancelled May 2015 | 125 Mateo St | replace window at front of house with wood sash double hung. add electrical outlets to meet code requirements. replace carpet. u factor 0.32 max. all work on ground floor.Details
replace window at front of house with wood sash double hung. add electrical outlets to meet code requirements. replace carpet. u factor 0.32 max. all work on ground floor. | $10,000 |
| Mar 19, 2015 | Completed final sign-off Nov 2015 | 3928 20th St | revision to pa# 201302119978s1. revised title 24 to include radiant heat. revised bedroom 3 windows and doors. revised ground level deck.Details
revision to pa# 201302119978s1. revised title 24 to include radiant heat. revised bedroom 3 windows and doors. revised ground level deck. | $2,000 |
| Mar 4, 2015 | Completed final sign-off Dec 2016 | 130 Townsend St | restaurant renovation limited to the transformation of service space into small kitchen and the creation of new bar. no new lighting and no modification to the envelope. plumb & ele under seperate permit. maher - not req'dDetails
restaurant renovation limited to the transformation of service space into small kitchen and the creation of new bar. no new lighting and no modification to the envelope. plumb & ele under seperate permit. maher - not req'd | $95,000 |
| Jan 20, 2015 | Expired or cancelled cancelled Aug 2017 | 2104 Bryant St | remodel of (e) entry level kitchen & bath. horizontal addtion for living room. vertical addition for master bedroom, master bath, roof deck, storage & closet. maher ordinance (exempted) see letter attached.Details
remodel of (e) entry level kitchen & bath. horizontal addtion for living room. vertical addition for master bedroom, master bath, roof deck, storage & closet. maher ordinance (exempted) see letter attached. | $130,000 |
| Oct 28, 2014 | Expired or cancelled cancelled Sep 2019 | 4229 26th St | 4th floor vertical & 3rd story horizontal addition to (e) 3 story sfh. 9'-5" high vertical addition will be set back 15'-0" from front face of (e) bldg. horizontal addition will extend 12'-0" beyond (e) rear facade. front facade will be altered to replace frence door with 3 victorian style windows.Details
4th floor vertical & 3rd story horizontal addition to (e) 3 story sfh. 9'-5" high vertical addition will be set back 15'-0" from front face of (e) bldg. horizontal addition will extend 12'-0" beyond (e) rear facade. front facade will be altered to replace frence door with 3 victorian style windows. | $675,000 |
| Sep 30, 2014 | Expired or cancelled expired Mar 2016 | 500 Brannan St | place of assembly permit, ref. to pa#201407252245 verify occupancy load per sffd. n/a ordinance #155-13 approved for 99Details
place of assembly permit, ref. to pa#201407252245 verify occupancy load per sffd. n/a ordinance #155-13 approved for 99 | |
| Sep 30, 2014 | Expired or cancelled cancelled Jan 2026 | 500 Brannan St | alteration to pa#201407252245 scope includes revise pass thru window, addition of air curtain & stainless steel counter. n/a ordinance #155-13Details
alteration to pa#201407252245 scope includes revise pass thru window, addition of air curtain & stainless steel counter. n/a ordinance #155-13 | $2,500 |
| Sep 23, 2014 | Completed final sign-off Dec 2014 | 125 Mateo St | bath remodel. demo we shower stall, tile, vanity. new shower pan, tile, vanity, plumbing fixtures. new elec fixtures. no walls or opening change. min 1 gen fixtures with high eff and aall lighting high eff or controlled by manual sensorDetails
bath remodel. demo we shower stall, tile, vanity. new shower pan, tile, vanity, plumbing fixtures. new elec fixtures. no walls or opening change. min 1 gen fixtures with high eff and aall lighting high eff or controlled by manual sensor | $30,000 |
| Sep 23, 2014 | Completed final sign-off Jan 2015 | 1913 Baker St | 1 kitchen remodel, mid level unit. demo e cabinets, tile, countertops, appliances,new cabinets, app, tile, counters. no demo of ceiling lights, floors,plumbing to remain,no wall changes. 40%lighting wattage high effDetails
1 kitchen remodel, mid level unit. demo e cabinets, tile, countertops, appliances,new cabinets, app, tile, counters. no demo of ceiling lights, floors,plumbing to remain,no wall changes. 40%lighting wattage high eff | $50,000 |
| Sep 19, 2014 | Expired or cancelled expired Jul 2020 | 722 Hampshire St | scope of work includes reconfiguration of walls & structural excavation for new bedroom, access to garage, new bath & new entry. work will include construction of new architectural partition, new finishes, new electrical wiring & new plumbing fixtures.Details
scope of work includes reconfiguration of walls & structural excavation for new bedroom, access to garage, new bath & new entry. work will include construction of new architectural partition, new finishes, new electrical wiring & new plumbing fixtures. | $20,000 |
| Sep 11, 2014 | Never finaled issued Sep 2014, no final | 500 Brannan St | install 2 new type 1 cooking equipment hoods, grease duct, new makeup air ref 201407252245. n/a ordinance #155-13Details
install 2 new type 1 cooking equipment hoods, grease duct, new makeup air ref 201407252245. n/a ordinance #155-13 | $45,000 |
| Jul 25, 2014 | Expired or cancelled expired Mar 2016 | 500 Brannan St | minor demolition and construction of walls. addition of floor leveling, exterior window, gate and finishesDetails
minor demolition and construction of walls. addition of floor leveling, exterior window, gate and finishes | $20,000 |
| Jul 16, 2014 | Completed final sign-off Jan 2017 | 500 Brannan St | minor demolition of non-structural walls, doors, finishes. mechanical, electrical, plumbing, and fire protection shall be on a seperate permit. accessibility - pls refer to ab-017Details
minor demolition of non-structural walls, doors, finishes. mechanical, electrical, plumbing, and fire protection shall be on a seperate permit. accessibility - pls refer to ab-017 | $2,500 |
| Jun 10, 2014 | Completed final sign-off Oct 2015 | 3735 20th St | keep flat ceiling over kitchen, remove skylights in kitchen from scope, correct address on plans. revision to 2014-0610-8045Details
keep flat ceiling over kitchen, remove skylights in kitchen from scope, correct address on plans. revision to 2014-0610-8045 | |
| Jun 10, 2014 | Completed final sign-off Oct 2015 | 3735 20th St | new interior staircase from 2nd floor to attic floor. type 13r sprinklers provided by subcontractor on separate permit for upper floor only.Details
new interior staircase from 2nd floor to attic floor. type 13r sprinklers provided by subcontractor on separate permit for upper floor only. | $15,000 |
| May 29, 2014 | Completed final sign-off Jan 2015 | 783 12th Av | replace in kind seven street facing windows. new windows to be fiberglass clad sashes paintable. existing window openings will not be altered.Details
replace in kind seven street facing windows. new windows to be fiberglass clad sashes paintable. existing window openings will not be altered. | $4,000 |
| May 13, 2014 | Completed final sign-off Jan 2015 | 783 12th Av | replace in-kind 15 (e) windows w/new fiberglass-clad windows, (e) window openings will not be altered. all windows are rear facing, not visible from street. max u-factor 0.4Details
replace in-kind 15 (e) windows w/new fiberglass-clad windows, (e) window openings will not be altered. all windows are rear facing, not visible from street. max u-factor 0.4 | $5,500 |
| May 5, 2014 | Completed final sign-off Nov 2015 | 3928 20th St | revision to 201302119978. retain a portion of existing foundationDetails
revision to 201302119978. retain a portion of existing foundation | |
| May 5, 2014 | Completed final sign-off Jan 2015 | 783 12th Av | full demo of dry rot exterior wood stairs. provide new deck and exit stairs to rear yard off e sunroom at 2nd flDetails
full demo of dry rot exterior wood stairs. provide new deck and exit stairs to rear yard off e sunroom at 2nd fl | $15,000 |
| Mar 14, 2014 | Expired or cancelled expired Aug 2017 | 783 12th Av | remodel (e) kitchen and relocate powder room on 2nd floor. remodel bathrooms and closets on 3rd floor.Details
remodel (e) kitchen and relocate powder room on 2nd floor. remodel bathrooms and closets on 3rd floor. | $65,000 |