Block 4079, lot 002
722 Hampshire St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,204 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 18, 2020 | Completed final sign-off Jul 2020 | 722 Hampshire St | to obtain final inspection for work previously approved under expired permit number 201409196819. all work is complete.Details
to obtain final inspection for work previously approved under expired permit number 201409196819. all work is complete. | ||
| Oct 21, 2019 | Completed final sign-off Jul 2020 | 722 Hampshire St | American Home Renewal Inc | replace 200 sq ft of siding, no tear off. not visible from street. lap siding repair w/ lap sidingDetails
replace 200 sq ft of siding, no tear off. not visible from street. lap siding repair w/ lap siding | $8,000 |
| Oct 7, 2019 | Completed final sign-off Jul 2020 | 722 Hampshire St | American Home Renewal Inc | replace a glazed door (3 feet x 6 feet, 8 inch) at same opening, size for size, not visible from street, from kitchen to rear yard, ufactor 0.32Details
replace a glazed door (3 feet x 6 feet, 8 inch) at same opening, size for size, not visible from street, from kitchen to rear yard, ufactor 0.32 | $3,000 |
| Dec 15, 2016 | Completed final sign-off Mar 2017 | 722 Hampshire St | Rcgc | guest bath remodel: new bath fixtures and drain line, new shower pan, new vanity sink, re-work lighting, new finishes.Details
guest bath remodel: new bath fixtures and drain line, new shower pan, new vanity sink, re-work lighting, new finishes. | $25,000 |
| Jun 19, 2015 | Never finaled issued Jun 2015, no final | 722 Hampshire St | street spaceDetails
street space | ||
| Sep 19, 2014 | Expired or cancelled expired Jul 2020 | 722 Hampshire St | Vonnegut Thoreau Construction | scope of work includes reconfiguration of walls & structural excavation for new bedroom, access to garage, new bath & new entry. work will include construction of new architectural partition, new finishes, new electrical wiring & new plumbing fixtures.Details
scope of work includes reconfiguration of walls & structural excavation for new bedroom, access to garage, new bath & new entry. work will include construction of new architectural partition, new finishes, new electrical wiring & new plumbing fixtures. | $20,000 |
| Jun 17, 2013 | Completed final sign-off Feb 2014 | 722 Hampshire St | Arcad Builders | remodel of (e) sfd. master bathroom renovation, which includes a replacement of the (e) windows. master bedroom renovations which include: modification of (e) interior non structural partitions. modification of (e) interior structural elements. relocation of (e) exteriro window to accommodate moDetails
remodel of (e) sfd. master bathroom renovation, which includes a replacement of the (e) windows. master bedroom renovations which include: modification of (e) interior non structural partitions. modification of (e) interior structural elements. relocation of (e) exteriro window to accommodate mo | $56,357 |
| Nov 26, 2001 | Completed final sign-off Dec 2001 | 722 Hampshire St | replace rotten deckDetails
replace rotten deck | $3,250 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.