Alla Agafonov
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Geddes Ulinskas Architects
- Based in
- San Francisco
- On San Francisco permits
- Jun 2002 to Sep 2026
202 permits since 2000 (architect on 194 permits, engineer on 7 permits, authorized agent-others on 3 permits): 117 completed, 17 in progress, 30 never finaled, 38 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 202.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 28, 2026 | In progress issued Oct 2026 | 83 Fountain St | Mishal Builders And Contractors Inc | interior remodel of basement and 1st floor of existing single family dewlling, refonfigure interior walls, add bathroom at 1st floor. new windows, side lightd. new doors at rear, new window opening at 2nd floor. relocate electrical service & gas meter.relocate sprinllers(design build).Details
interior remodel of basement and 1st floor of existing single family dewlling, refonfigure interior walls, add bathroom at 1st floor. new windows, side lightd. new doors at rear, new window opening at 2nd floor. relocate electrical service & gas meter.relocate sprinllers(design build). | $95,000 |
| Sep 15, 2026 | In progress filed Sep 2026, not yet issued | 2652 Broadway | Stroub Construction | the project scope: interior remodel of a existing 3 story building including: relocation & remodel of kitchen and 4 bathrooms. add addition of the half bath. exterior work is limited to relocation in-kind of select windows on east facade, & enlargement of the window on north side at 3rd floor.Details
the project scope: interior remodel of a existing 3 story building including: relocation & remodel of kitchen and 4 bathrooms. add addition of the half bath. exterior work is limited to relocation in-kind of select windows on east facade, & enlargement of the window on north side at 3rd floor. | $1,230,000 |
| Jul 21, 2026 | In progress filed Jul 2026, not yet issued | 3010 Pacific Av | 10' vertical addition of the third floor in place of the existing roof deck, and installation of a jadu (exterior entry and kitchenette to be installed in existing bedroom 5).Details
10' vertical addition of the third floor in place of the existing roof deck, and installation of a jadu (exterior entry and kitchenette to be installed in existing bedroom 5). | $760,000 | |
| Jul 17, 2026 | In progress issued Jul 2026 | 1212 19th St | Vonnegut Thoreau Construction | revision to pa# 202211176785: to reflect removal of one interior door at 1st floor from scope.Details
revision to pa# 202211176785: to reflect removal of one interior door at 1st floor from scope. | |
| Apr 15, 2026 | In progress issued May 2026 | 301 Mission St | installation & relocation of mechanical & plumbing systemsDetails
installation & relocation of mechanical & plumbing systems | $25,000 | |
| Dec 22, 2025 | Expired or cancelled withdrawn Dec 2025 | 1834 Gough St | Bergquist Builders | revision to permit 202505055790. lowering of the basement floor levl with new footing and stem wall. basement laundry room and bathroom remodel.Details
revision to permit 202505055790. lowering of the basement floor levl with new footing and stem wall. basement laundry room and bathroom remodel. | $38,000 |
| May 5, 2025 | In progress issued Aug 2025 | 1834 Gough St | Bergquist Builders | remodel of an existing 2 story building with a basement, and interior remodel throughout.Details
remodel of an existing 2 story building with a basement, and interior remodel throughout. | $170,000 |
| Mar 24, 2025 | In progress issued May 2025 | 4627 17th St | Archteype Design Builder | excavation and shoring plan for 202211146484 s1Details
excavation and shoring plan for 202211146484 s1 | $57,000 |
| Feb 13, 2025 | In progress issued Feb 2025 | 301 Mission St | Black Mountain Development, Aaron Gordon Construction Inc | gpha: removal of existing ceiling in kitchen and living room. removal of existing kitchen island, new construction of architctural partitions, finishes & fixtures for the addition of a primary bedroom suite, laundry, guest room & bath, new kitchen island, other cabinetry.Details
gpha: removal of existing ceiling in kitchen and living room. removal of existing kitchen island, new construction of architctural partitions, finishes & fixtures for the addition of a primary bedroom suite, laundry, guest room & bath, new kitchen island, other cabinetry. | $718,000 |
| Dec 19, 2024 | In progress issued Sep 2025 | 241 Mississippi St | R & D Construction Co Inc | revision to pa#202205134234 to include the following: 1) sistering new retaining wall to extg retaining wall. 2) restore extg wooden deck at the front and at the breezeway. 3)excavating the front patio for new pavers on slab.Details
revision to pa#202205134234 to include the following: 1) sistering new retaining wall to extg retaining wall. 2) restore extg wooden deck at the front and at the breezeway. 3)excavating the front patio for new pavers on slab. | $16,000 |
| Jul 30, 2024 | In progress issued Oct 2024 | 1212 19th St | Vonnegut Thoreau Construction | rear yard retaining wall. building currently being converted to two family under pa# 202211176785.Details
rear yard retaining wall. building currently being converted to two family under pa# 202211176785. | $23,000 |
| May 29, 2024 | Completed final sign-off Oct 2025 | 3710 Clay St | Norman Charles Construction | revision to pa# 2022-0104-5359 structural changes at roof. reduced skylight sizes. foundation changes at line d. stair revision between 2nd floor & attic.Details
revision to pa# 2022-0104-5359 structural changes at roof. reduced skylight sizes. foundation changes at line d. stair revision between 2nd floor & attic. | |
| May 8, 2024 | In progress issued Jun 2025 | 2500 Broadway | full int remodel, infill under (e) deck. below grade expansion of north garage. change of exterior stair. minor ext changes- railing, windows, doors. structural upgrade, earth shoring for garage expansionDetails
full int remodel, infill under (e) deck. below grade expansion of north garage. change of exterior stair. minor ext changes- railing, windows, doors. structural upgrade, earth shoring for garage expansion | $650,000 | |
| Nov 27, 2023 | In progress filed Nov 2023, not yet issued | 2500 Broadway | revision to permit 202306150227. changes include updated work in the public right of way and associated work on the property.Details
revision to permit 202306150227. changes include updated work in the public right of way and associated work on the property. | ||
| Nov 8, 2023 | Completed final sign-off Jun 2024 | 1465 Masonic Av | Design Line Construction | revision to 201912028445 s2 to remove selective windows on the side and rear elevation and update interior layouts. no change in fixture count.Details
revision to 201912028445 s2 to remove selective windows on the side and rear elevation and update interior layouts. no change in fixture count. | |
| Aug 28, 2023 | In progress issued Dec 2024 | 742 26th Av | Ren Lei Construction Co | vert+horz addition & remodel. add adu w/2 bdrms & 2 baths at 1st flr. full remodel of 2nd flr+add 2 bdrms and 2 baths. new 3rd flr to include 3 baths 3 bdrms and 1 kitchen. (n) 3rd flr exterior facade to match existing. new rear balconies.Details
vert+horz addition & remodel. add adu w/2 bdrms & 2 baths at 1st flr. full remodel of 2nd flr+add 2 bdrms and 2 baths. new 3rd flr to include 3 baths 3 bdrms and 1 kitchen. (n) 3rd flr exterior facade to match existing. new rear balconies. | $830,000 |
| Aug 2, 2023 | Never finaled issued Aug 2023, no final | 2500 Broadway | Upscale Construction Inc. | revision to 202306150227. replace stone at front entry steps, replace rear balcony guardrail. partial removal of half-timbering from exterior facade. replace (e) roof finishes material (revision to finish proposed under 202306150227)Details
revision to 202306150227. replace stone at front entry steps, replace rear balcony guardrail. partial removal of half-timbering from exterior facade. replace (e) roof finishes material (revision to finish proposed under 202306150227) | $45,000 |
| Jun 15, 2023 | Never finaled issued Jun 2023, no final | 2500 Broadway | Upscale Construction Inc. | repairing & repainting exterior facade, replacing roofing shingles, replacing rear blaconies, guardrails and deck pavers, replacing egress ladder at the rear, replacing damaged windows, replacing skylights, selective interior remodel and repair as required. (re-roofing under separeted permit)Details
repairing & repainting exterior facade, replacing roofing shingles, replacing rear blaconies, guardrails and deck pavers, replacing egress ladder at the rear, replacing damaged windows, replacing skylights, selective interior remodel and repair as required. (re-roofing under separeted permit) | $417,278 |
| Jun 1, 2023 | Expired or cancelled withdrawn Jun 2023 | 2500 Broadway | repairing and repainting exterior facade. replace some roof shingles. replace rear balconies guardrails and deck pavers. replacing egress ladder at the rear. replace existing fence at pierce st. replacing damaged windows, skylights. selective interior remodel and repair as requiredDetails
repairing and repainting exterior facade. replace some roof shingles. replace rear balconies guardrails and deck pavers. replacing egress ladder at the rear. replace existing fence at pierce st. replacing damaged windows, skylights. selective interior remodel and repair as required | $342,000 | |
| Apr 24, 2023 | In progress issued Jul 2024 | 5600 Geary Bl | Evra Construction | addition of 1-kitchen in the existing buildingDetails
addition of 1-kitchen in the existing building | $35,000 |
| Dec 6, 2022 | Completed final sign-off Jun 2025 | 225 Maywood Dr | Leonardo Construction Inc | new adu attached to the existing residence. vertical addition under pa# 202210184534.Details
new adu attached to the existing residence. vertical addition under pa# 202210184534. | $672,000 |
| Dec 2, 2022 | Completed final sign-off Dec 2023 | 1080 Chestnut St | Phase 2 Builders | 7/f-unit 7c: renovation, new architectural partitions, new finishes, new cabinetry, (e) exhaust/mechanical to remain, new electrical wiring & new plumbing fixtures.Details
7/f-unit 7c: renovation, new architectural partitions, new finishes, new cabinetry, (e) exhaust/mechanical to remain, new electrical wiring & new plumbing fixtures. | $362,000 |
| Nov 29, 2022 | Completed final sign-off Mar 2023 | 507 Valley St | Norman Charles Construction | revision to pa# 202110140443 to remove basement bathroom from scope.Details
revision to pa# 202110140443 to remove basement bathroom from scope. | |
| Nov 17, 2022 | In progress issued Nov 2023 | 1212 19th St | Vonnegut Thoreau Construction | remodel of (e)2 story bldg & interior remodelthroughtout,including re-build & expansion of (e)noncompliant 3rd floor.relocation of exterior stairs @ rear & expansion of rear volume @ 1st fl within setback.rear volume to become conditioned space. 1st floor to become 2nd unit. 3rd fl vert add & horizDetails
remodel of (e)2 story bldg & interior remodelthroughtout,including re-build & expansion of (e)noncompliant 3rd floor.relocation of exterior stairs @ rear & expansion of rear volume @ 1st fl within setback.rear volume to become conditioned space. 1st floor to become 2nd unit. 3rd fl vert add & horiz | $220,000 |
| Nov 14, 2022 | In progress issued Mar 2024 | 4627 17th St | Archteype Design Builder, Leonardo Construction Inc | remodel of existing house with one-story vertical addition; total interior remodel with selective removal of interior elements; lowering a portion of the existing basement.Details
remodel of existing house with one-story vertical addition; total interior remodel with selective removal of interior elements; lowering a portion of the existing basement. | $920,000 |
| Oct 28, 2022 | Completed final sign-off Sep 2023 | 1465 Masonic Av | Design Line Construction | revision to pa 2019-1202-8445 s2 to update demo calc & means and methods for tilt down wall upgrade @ basement level btw grid line 1 & 2 & a btw grid line 1 & between grids a & d on grid line 1Details
revision to pa 2019-1202-8445 s2 to update demo calc & means and methods for tilt down wall upgrade @ basement level btw grid line 1 & 2 & a btw grid line 1 & between grids a & d on grid line 1 | |
| Oct 18, 2022 | Completed final sign-off Jun 2025 | 225 Maywood Dr | Leonardo Construction Inc | vertical addition at the (e) second level roof terrace, enclosure of (e) 1st level porch. addition of 1 bedroom and 1 bathroom. remodel of existing bathrooms and an office.Details
vertical addition at the (e) second level roof terrace, enclosure of (e) 1st level porch. addition of 1 bedroom and 1 bathroom. remodel of existing bathrooms and an office. | $85,000 |
| Jul 5, 2022 | Never finaled issued Jul 2022, no final | 285 San Anselmo Av | Forma Construction | replacing and extending a retianing wall and removing an external staircase in the back (along monterey bl side).Details
replacing and extending a retianing wall and removing an external staircase in the back (along monterey bl side). | $60,000 |
| Jun 17, 2022 | Completed final sign-off Jul 2022 | 939 Sanchez St | revision to pa#202105281309 and 201612094657 to include in the addition of 2 wetbars at first and 4th floor.Details
revision to pa#202105281309 and 201612094657 to include in the addition of 2 wetbars at first and 4th floor. | $22,000 | |
| Jun 17, 2022 | Never finaled issued Aug 2022, no final | 1212 19th St | Vonnegut Thoreau Construction | interior remodel of an existing building including new interior stair connecting 1st and 2nd floor, and foundation replacement.Details
interior remodel of an existing building including new interior stair connecting 1st and 2nd floor, and foundation replacement. | $370,000 |
| May 13, 2022 | In progress issued Feb 2024 | 241 Mississippi St | R & D Construction Co Inc, Vonnegut Thoreau Construction | revision to bpa# 202112134325 to include the following: extend the 1/f at the rear of bldg. create a deck at the 2/f. fix foundation as needed. rearrange stair on the lower unit. adding & replacing (n) windows as needed.Details
revision to bpa# 202112134325 to include the following: extend the 1/f at the rear of bldg. create a deck at the 2/f. fix foundation as needed. rearrange stair on the lower unit. adding & replacing (n) windows as needed. | $22,000 |
| Mar 29, 2022 | Completed final sign-off Jul 2023 | 3962 Clay St | Box Canyon Builders Dba The Englander | revision to 202109299463, to reflect correct stair plans & structural updates.Details
revision to 202109299463, to reflect correct stair plans & structural updates. | $2,000 |
| Mar 25, 2022 | Expired or cancelled cancelled Jan 2026 | 3962 Clay St | Box Canyon Builders Dba The Englander | no physical work. administratrive pa to correct fire protection note on pa 2021-0929-9463. note on g000 specifies nfpa 13r; should be corrected to "sprinklered per nfpa 13d; garage to be nfpa 13Details
no physical work. administratrive pa to correct fire protection note on pa 2021-0929-9463. note on g000 specifies nfpa 13r; should be corrected to "sprinklered per nfpa 13d; garage to be nfpa 13 | |
| Jan 4, 2022 | Expired or cancelled expired Oct 2025 | 3710 Clay St | Norman Charles Construction | convert of (e) attic to habirable space; addition of new staircase connecting (e) 2nd fl and (e) attic; addition of (3) dormoers, skylights and window @ (e) mamsard roof; (2) new bedrooms & (1) new bathroom.Details
convert of (e) attic to habirable space; addition of new staircase connecting (e) 2nd fl and (e) attic; addition of (3) dormoers, skylights and window @ (e) mamsard roof; (2) new bedrooms & (1) new bathroom. | $67,200 |
| Dec 13, 2021 | Never finaled issued Dec 2021, no final | 241 Mississippi St | Matthews Construction, R & D Construction Co Inc | rev to pa201602038763 to include the following: alter e 1/2/3fl layout due to fire damage. rebuild (e) duplex as prior to fire with some mods. repair the building due to fire damagne and repair foundation.Details
rev to pa201602038763 to include the following: alter e 1/2/3fl layout due to fire damage. rebuild (e) duplex as prior to fire with some mods. repair the building due to fire damagne and repair foundation. | $27,000 |
| Dec 10, 2021 | Expired or cancelled withdrawn Dec 2021 | 241 Mississippi St | revision to bpa2016/0203/8763. to include the following:alter(e) roof,2nd & 3rd flr layout due to fire damage, rebuild (e) duplex as prior to fire with some modifications,repair bldg due to fire adding an exterior rear deck.Details
revision to bpa2016/0203/8763. to include the following:alter(e) roof,2nd & 3rd flr layout due to fire damage, rebuild (e) duplex as prior to fire with some modifications,repair bldg due to fire adding an exterior rear deck. | $27,000 | |
| Nov 17, 2021 | Expired or cancelled cancelled Jan 2026 | 44 Montclair Tr | Lone Wolf Construction | relocation of (e) break wind wall 3 an (e) rooftop terrace and addition of new planters.Details
relocation of (e) break wind wall 3 an (e) rooftop terrace and addition of new planters. | $11,000 |
| Nov 9, 2021 | Never finaled filed Nov 2021, never issued | 3355 Pacific Av | Moroso Construction Inc | front (north) facade window replacement with an addition of a new window; addition of new breakwind bi-fold doors at the lower terrace; landscape work.Details
front (north) facade window replacement with an addition of a new window; addition of new breakwind bi-fold doors at the lower terrace; landscape work. | $220,000 |
| Oct 14, 2021 | Completed final sign-off Mar 2023 | 507 Valley St | Norman Charles Construction | remodel kitchen and 4 baths. relocation of laundry room. addition of bath at basement. relocateion of non structural inteiror walls at kitchen.new wood flooring throughout. replace treads, risers and railings at all interior stairsDetails
remodel kitchen and 4 baths. relocation of laundry room. addition of bath at basement. relocateion of non structural inteiror walls at kitchen.new wood flooring throughout. replace treads, risers and railings at all interior stairs | $135,000 |
| Sep 29, 2021 | Completed final sign-off Jul 2023 | 3962 Clay St | Add A Garage Inc., Box Canyon Builders Dba The Englander | revision to approved pa# 201808177663.expansion of existing garage; replacement of elevator, renovation of front facade and steps, including replacement of windows at 1/f; excavation is 33 cubic yard.Details
revision to approved pa# 201808177663.expansion of existing garage; replacement of elevator, renovation of front facade and steps, including replacement of windows at 1/f; excavation is 33 cubic yard. | $85,000 |
| Aug 23, 2021 | Never finaled issued Sep 2021, no final | 3355 Pacific Av | Fma Builders, Moroso Construction Inc | interior remodel including relocation of several interior partitions, remaking of stairs flight between 1st and 2nd floors and excavation at the elevator pit to allow for a lowered landing at the level of the 1st floor(elimination of an intermdiate landing at the stair flight.Details
interior remodel including relocation of several interior partitions, remaking of stairs flight between 1st and 2nd floors and excavation at the elevator pit to allow for a lowered landing at the level of the 1st floor(elimination of an intermdiate landing at the stair flight. | $1,230,000 |
| Aug 16, 2021 | Expired or cancelled expired Aug 2026 | 751 25th Av | Ren Lei Construction Co | foundation revision for pa# 201812289328. excavation, concrete foundation, ramps, steps and slab on grade.Details
foundation revision for pa# 201812289328. excavation, concrete foundation, ramps, steps and slab on grade. | $3,000 |
| Jun 24, 2021 | Completed final sign-off Jul 2022 | 939 Sanchez St | rev to pa202105281309 & 201612094657: addition of terrace at top floor, addition of window at lightwell and conversion of window to double doors. add planter at terrace.Details
rev to pa202105281309 & 201612094657: addition of terrace at top floor, addition of window at lightwell and conversion of window to double doors. add planter at terrace. | ||
| May 28, 2021 | Completed final sign-off Jul 2022 | 939 Sanchez St | K J Woods Construction Inc | rev to pa 201612094657 rev of first and third floor layouts result in reduction of conditioned square footage and glazing surface at windows.Details
rev to pa 201612094657 rev of first and third floor layouts result in reduction of conditioned square footage and glazing surface at windows. | $500,000 |
| Feb 23, 2021 | Never finaled filed Feb 2021, never issued | 1717 Baker St | Arrow Builders Inc | (n) access hatch at garage. remodel 3 bathrooms. replace roof & floor at laundry/powder. rebuild stairs at laundry. remodel kitchen. remove 1 window at north facade. replace windows and 1 door. add 2 windows at south. replace 9 windows on front.Details
(n) access hatch at garage. remodel 3 bathrooms. replace roof & floor at laundry/powder. rebuild stairs at laundry. remodel kitchen. remove 1 window at north facade. replace windows and 1 door. add 2 windows at south. replace 9 windows on front. | $213,000 |
| Jan 19, 2021 | Completed final sign-off Jun 2021 | 3902 Clay St | Oak Leaf Construction | rev to pa201807245358-s1: rev to landscaping outside of p|l, landscape at front entry, adding a window to the back and adding a bathroom.Details
rev to pa201807245358-s1: rev to landscaping outside of p|l, landscape at front entry, adding a window to the back and adding a bathroom. | $7,500 |
| Jan 19, 2021 | Completed final sign-off Aug 2023 | 285 San Anselmo Av | Forma Construction | new exterior stair at eastern corner of existing house.Details
new exterior stair at eastern corner of existing house. | $20,000 |
| Dec 30, 2020 | Never finaled issued May 2021, no final | 80 Terrace Dr | Leonardo Construction Inc | attic remodel w/ addition of 2 (n) dormers, a window in the rear elevation and repair of the entry steps and walkway. new staircase connecting the 2nd flr hallway and attic. new half bath. add new closet, family room and storage in attic.Details
attic remodel w/ addition of 2 (n) dormers, a window in the rear elevation and repair of the entry steps and walkway. new staircase connecting the 2nd flr hallway and attic. new half bath. add new closet, family room and storage in attic. | $80,000 |
| Dec 23, 2020 | Completed final sign-off Jan 2023 | 2811 Vallejo St | Vonnegut Thoreau Construction | removal of (e) garage doors and center post, install double-wide garage door. no mechanical work. (n) roof deck above 5th level.Details
removal of (e) garage doors and center post, install double-wide garage door. no mechanical work. (n) roof deck above 5th level. | $23,000 |
| Nov 5, 2020 | Completed final sign-off Jan 2021 | 327 Cumberland St | Carranza Group Lp | amend to pa202008262671: replace (e) concrete stair with new concrete stair clad with stone. new handrail; all work w/in (e) encroachment. all work in row under seperate dpw submittal.Details
amend to pa202008262671: replace (e) concrete stair with new concrete stair clad with stone. new handrail; all work w/in (e) encroachment. all work in row under seperate dpw submittal. | $10,000 |
| Oct 29, 2020 | Expired or cancelled cancelled Jan 2026 | 100 27th Av | Oak Leaf Construction | demo of (e) walls in basement. renovation of (e) kitchen and powder room. demo wall between kitchen and dining room. new bathrooms on 1/f & 3/f. new roof deck. no exterior work. no mechanical work.Details
demo of (e) walls in basement. renovation of (e) kitchen and powder room. demo wall between kitchen and dining room. new bathrooms on 1/f & 3/f. new roof deck. no exterior work. no mechanical work. | $30,000 |
| Oct 17, 2020 | Completed final sign-off Jan 2022 | 2131 Divisadero St | Lone Wolf Construction | remodel of (e) kitchen and bathrooms on 1st floor. no work to exterior.Details
remodel of (e) kitchen and bathrooms on 1st floor. no work to exterior. | $60,000 |
| Oct 9, 2020 | Completed final sign-off May 2022 | 20 Raycliff Tr | Matarozzi/Pelsinger Builders Inc. | revision to permit # 201708114666, 201911056535, 202008101467. update title 24 compliance.Details
revision to permit # 201708114666, 201911056535, 202008101467. update title 24 compliance. | |
| Aug 6, 2020 | Completed final sign-off Mar 2023 | 1830 Pine St | Fine By Design Inc | demolition of wall between kitchen & dining on 2/f. renovation of (e) kitchen. relocation of wall between kitchen and laundry room on 2/f. no work to exterior. no mechanical work.Details
demolition of wall between kitchen & dining on 2/f. renovation of (e) kitchen. relocation of wall between kitchen and laundry room on 2/f. no work to exterior. no mechanical work. | $10,000 |
| Aug 5, 2020 | Completed final sign-off Oct 2020 | 1636 Leavenworth St | Arroyo Realty & Development Llc | revision to pa# 20171255551; as is drawing to memorialize the changes made in field to change the rear doors from in-swing to out-swing, no other workDetails
revision to pa# 20171255551; as is drawing to memorialize the changes made in field to change the rear doors from in-swing to out-swing, no other work | |
| Mar 13, 2020 | Completed final sign-off Aug 2022 | 2531 Larkin St | Kieran Collins Construction, Puac Construction Llc | revision to 201911197689 new roof and roof deck new stairs new gas fireplace with flueDetails
revision to 201911197689 new roof and roof deck new stairs new gas fireplace with flue | $100,000 |
| Mar 11, 2020 | Completed final sign-off Apr 2022 | 235 Kansas St | Robert Thomas Construction | project scope is the removal of portions of existing walls. replacement of interior partitions and doors in (e) commercial space. (retail trade shop in conformance with pdr-1-d)Details
project scope is the removal of portions of existing walls. replacement of interior partitions and doors in (e) commercial space. (retail trade shop in conformance with pdr-1-d) | $5,000 |
| Feb 24, 2020 | Completed final sign-off May 2026 | 867 45th Av | Lone Wolf Construction | infill of lightwells near west & east property line.rear addition to 1st & 2nd fl.remodel of kitchens, relocation of bathroom on 1st floor.new master bathroom on 2nd floor. reconfig (n) rear stairs and addition of patio. update window schedules (a400), skylights (a400,a001) and reconfig windows 1/fDetails
infill of lightwells near west & east property line.rear addition to 1st & 2nd fl.remodel of kitchens, relocation of bathroom on 1st floor.new master bathroom on 2nd floor. reconfig (n) rear stairs and addition of patio. update window schedules (a400), skylights (a400,a001) and reconfig windows 1/f | $275,000 |
| Feb 12, 2020 | Completed final sign-off Jan 2022 | 285 San Anselmo Av | Forma Construction | exterior stucco repair,existing stucco finish to be replaced in kind,existing aluminum clad windows & doors to be replaced with new wood windows and doors, size to remain the same.Details
exterior stucco repair,existing stucco finish to be replaced in kind,existing aluminum clad windows & doors to be replaced with new wood windows and doors, size to remain the same. | $73,000 |
| Jan 27, 2020 | Completed final sign-off Mar 2023 | 3010 Pacific Av | Cook Construction | rear addition to 2nd & 3rd floor. remodel kitchen. new full bar. new gas fire place. new fenestration at rear. new sunken patio at rear.Details
rear addition to 2nd & 3rd floor. remodel kitchen. new full bar. new gas fire place. new fenestration at rear. new sunken patio at rear. | $125,000 |
| Jan 9, 2020 | Completed final sign-off Mar 2023 | 3010 Pacific Av | Cook Construction | 1st fl: escavate (n) media room, reconfigure bedroom & bathroom, add (2) bedrooms. 2nd fl: demo interior walls expand stairs. 3rd fl: remodel bathroom (n) stairs to roof deck. roof: (n) retractable skylight & roof deck. entire house: (n) flooring (n) radiant heat (n) elevator, reconfigure stairDetails
1st fl: escavate (n) media room, reconfigure bedroom & bathroom, add (2) bedrooms. 2nd fl: demo interior walls expand stairs. 3rd fl: remodel bathroom (n) stairs to roof deck. roof: (n) retractable skylight & roof deck. entire house: (n) flooring (n) radiant heat (n) elevator, reconfigure stair | $200,000 |
| Dec 31, 2019 | Completed final sign-off Feb 2022 | 372 07th Av | J P E Construction | response to 2018001516enf reconfigure 2nd story to additional dwelling unit.Details
response to 2018001516enf reconfigure 2nd story to additional dwelling unit. | $50,000 |
| Dec 12, 2019 | Completed final sign-off Feb 2021 | 3710 Clay St | Norman Charles Construction | voluntary structural upgradeDetails
voluntary structural upgrade | $37,000 |
| Dec 2, 2019 | Completed final sign-off Jun 2024 | 1465 Masonic Av | Design Line Construction | remodel(e) 3-story over basement & (8) ft horizontal expansion towards towards south property line, (14) ft horizontal expansion towards west property line (up to rear yard setback; excavation @basement w/ (n) garage entrance; addition of deck @ 2nd flr; attic space conversion toDetails
remodel(e) 3-story over basement & (8) ft horizontal expansion towards towards south property line, (14) ft horizontal expansion towards west property line (up to rear yard setback; excavation @basement w/ (n) garage entrance; addition of deck @ 2nd flr; attic space conversion to | $720,000 |
| Nov 26, 2019 | Expired or cancelled cancelled Jan 2026 | 285 San Anselmo Av | Forma Construction | project scope is exterior stucco repair. existing stucco finish to be replaced in kind. existing windows to be removed and reinstalled after stucco repairDetails
project scope is exterior stucco repair. existing stucco finish to be replaced in kind. existing windows to be removed and reinstalled after stucco repair | $26,000 |
| Nov 19, 2019 | Completed final sign-off Aug 2022 | 2531 Larkin St | Kieran Collins Construction, Puac Construction Llc | gr fl new partitions for new bedroom, new bath, media rm. 2nd fl new windows rear, new internal partitions, kitchen bath remodels, 3rd fl new dormers at rear and lightwell for new 2 bath, 2 bdrms, lower deck at rear, new deck at frontDetails
gr fl new partitions for new bedroom, new bath, media rm. 2nd fl new windows rear, new internal partitions, kitchen bath remodels, 3rd fl new dormers at rear and lightwell for new 2 bath, 2 bdrms, lower deck at rear, new deck at front | $400,000 |
| Nov 19, 2019 | Completed final sign-off Jan 2021 | 327 Cumberland St | Carranza Group Lp | revision to pa #2018-0525-0188: increase excavation @ ground level to create usable storage area. extend the pool @ south side w/in the buidling to align structural walls. remove lot line windows facing east side will be blocked by neighboring wall & relocate utility meter boxes per pg&e standardsDetails
revision to pa #2018-0525-0188: increase excavation @ ground level to create usable storage area. extend the pool @ south side w/in the buidling to align structural walls. remove lot line windows facing east side will be blocked by neighboring wall & relocate utility meter boxes per pg&e standards | |
| Nov 18, 2019 | Completed final sign-off Feb 2021 | 3710 Clay St | Norman Charles Construction | voluntary structural foundation upgradeDetails
voluntary structural foundation upgrade | $18,000 |
| Nov 5, 2019 | Completed final sign-off May 2022 | 20 Raycliff Tr | Matarozzi/Pelsinger Builders Inc. | revision to pa 2017-0811-4666 s2 to include moving the 1st level windows to outer wall as clerestory, adjust of door location at penthouse and addition of partition wall at penthouse. lowering of e roof level and 2nd fl. no change of bulding ht as noticedDetails
revision to pa 2017-0811-4666 s2 to include moving the 1st level windows to outer wall as clerestory, adjust of door location at penthouse and addition of partition wall at penthouse. lowering of e roof level and 2nd fl. no change of bulding ht as noticed | |
| Nov 5, 2019 | Completed final sign-off Jul 2021 | 3742 Divisadero St | S A Baxter Inc. | revision 201710050524, removal of setback of front facade, addition bay window bump and addition of skylight at master bathDetails
revision 201710050524, removal of setback of front facade, addition bay window bump and addition of skylight at master bath | $5,000 |
| Sep 19, 2019 | Expired or cancelled withdrawn Dec 2019 | 14 Havens St | revision to permit # 2019-0129-1474: scope of work no longer includes changes to exterior at 2nd floor as originally approved. minor modification to layout of interior on structural partition and doors, no structural or mechanival change.Details
revision to permit # 2019-0129-1474: scope of work no longer includes changes to exterior at 2nd floor as originally approved. minor modification to layout of interior on structural partition and doors, no structural or mechanival change. | ||
| Sep 6, 2019 | Completed final sign-off May 2022 | 20 Raycliff Tr | Matarozzi/Pelsinger Builders Inc. | revision to permit #201708114666 - additional exterior demolition due to dry rot.Details
revision to permit #201708114666 - additional exterior demolition due to dry rot. | $200 |
| Aug 22, 2019 | Completed final sign-off Jan 2023 | 2811 Vallejo St | Vonnegut Thoreau Construction | structural revision to pa# 2019-0404-7110. replacement of exitin foundatrion along ease-west wall and replacement of stair framing.Details
structural revision to pa# 2019-0404-7110. replacement of exitin foundatrion along ease-west wall and replacement of stair framing. | $20,000 |
| Aug 15, 2019 | Never finaled filed Aug 2019, never issued | 432 Jackson St | Lone Wolf Construction | removal of the kitchen on 2nd flr and abatement of the violation on the property complaint 201851151Details
removal of the kitchen on 2nd flr and abatement of the violation on the property complaint 201851151 | $1,500 |
| Jul 29, 2019 | Completed final sign-off Jul 2021 | 3742 Divisadero St | S A Baxter Inc. | revision to 201710050524 including removal to previously approved roof deck and stair leading to roof. automatic sprinklers to be provided throughout building under sep permit.Details
revision to 201710050524 including removal to previously approved roof deck and stair leading to roof. automatic sprinklers to be provided throughout building under sep permit. | |
| Jul 23, 2019 | Completed final sign-off May 2022 | 285 San Anselmo Av | Forma Construction | excavation at basement for a new wine room and storage room, under (e) patio and landscape area.Details
excavation at basement for a new wine room and storage room, under (e) patio and landscape area. | $100,000 |
| Jul 12, 2019 | Never finaled issued Feb 2020, no final | 14 Havens St | A L Martin Construction | exterior addition of roof deck over (e) 1st floor.Details
exterior addition of roof deck over (e) 1st floor. | $27,000 |
| Jun 25, 2019 | Completed final sign-off Jan 2021 | 3710 Clay St | Norman Charles Construction | renovation (e) kitchen, office and powder room on 1st flr. 2/f: renovation of laundry, dressing room and 2 baths. remove stair between 1st and 2nd floor. remove chimney.Details
renovation (e) kitchen, office and powder room on 1st flr. 2/f: renovation of laundry, dressing room and 2 baths. remove stair between 1st and 2nd floor. remove chimney. | $162,000 |
| Jun 24, 2019 | Completed final sign-off Dec 2019 | 2811 Vallejo St | Vonnegut Thoreau Construction | revision to pa #201904047110. replacement of existing cement board siding at new gym level with plaster to match rest of facade.Details
revision to pa #201904047110. replacement of existing cement board siding at new gym level with plaster to match rest of facade. | |
| Jun 14, 2019 | Completed final sign-off Jun 2019 | 2712 Pine St | L H Construction | revision to pa# 201705085907, scope of work includes elimination of requirement of sprinklers from project. revised common path of egress travel distance is 72'-0"Details
revision to pa# 201705085907, scope of work includes elimination of requirement of sprinklers from project. revised common path of egress travel distance is 72'-0" | |
| May 20, 2019 | Completed final sign-off Aug 2019 | 2528 Union St | Division Sf Inc Dba: Hawke Bldg Company | the project scope is the changing room assignment onlyDetails
the project scope is the changing room assignment only | |
| May 15, 2019 | Expired or cancelled expired Sep 2026 | 751 25th Av | Ren Lei Construction Co | superstructure revision to app#200905188574 structural framing and architectural revisions to inerior partitions and exterior fenestration.Details
superstructure revision to app#200905188574 structural framing and architectural revisions to inerior partitions and exterior fenestration. | |
| Apr 30, 2019 | Expired or cancelled cancelled Jan 2026 | 751 25th Av | Ren Lei Construction Co | foundation revision for pa200905188574: excavation, concrete, fountains, ramps, steps & slab on grade. structural revision only.Details
foundation revision for pa200905188574: excavation, concrete, fountains, ramps, steps & slab on grade. structural revision only. | |
| Apr 24, 2019 | Completed final sign-off Sep 2020 | 99 Carmelita St | North Bay Construction | remodel of interior partitions and doors. kitchen renovation. addition of the new foundation.Details
remodel of interior partitions and doors. kitchen renovation. addition of the new foundation. | $80,000 |
| Apr 10, 2019 | Completed final sign-off Jan 2022 | 285 San Anselmo Av | Forma Construction | interior non-structural remodel of (e) 2 story over basement building including replacement of finishes at outdoor patio. remodeling of 5 bedrooms, 5 bathrooms, (2) 1/2 baths.Details
interior non-structural remodel of (e) 2 story over basement building including replacement of finishes at outdoor patio. remodeling of 5 bedrooms, 5 bathrooms, (2) 1/2 baths. | $250,000 |
| Apr 4, 2019 | Completed final sign-off Dec 2019 | 2811 Vallejo St | Vonnegut Thoreau Construction | new finishes at unfinished space below basement. new door, new window, new half bath.Details
new finishes at unfinished space below basement. new door, new window, new half bath. | $70,000 |
| Mar 15, 2019 | Expired or cancelled withdrawn Dec 2019 | 1719 Green St | revision to bpa 2017-1005-0516. remove previously approved fire rated parapet at roof and substitution of existing skylight with fire rated one.Details
revision to bpa 2017-1005-0516. remove previously approved fire rated parapet at roof and substitution of existing skylight with fire rated one. | $8,000 | |
| Jan 29, 2019 | Completed final sign-off Feb 2020 | 14 Havens St | A L Martin Construction | remodel of interior partitions and doors, relocation of bathrooms, addition of livable area in non-habitable spaceDetails
remodel of interior partitions and doors, relocation of bathrooms, addition of livable area in non-habitable space | $72,000 |
| Jan 24, 2019 | Never finaled issued Apr 2019, no final | 327 Cumberland St | Add A Garage Inc. | revision in response to suspended permit 201805250188. design revision includes reduction to height at rear of building to conform to e height envelope and clarification of extent of modification to rear. non relocation of compliant portion of building located in the rear yard setback. non reloc ofDetails
revision in response to suspended permit 201805250188. design revision includes reduction to height at rear of building to conform to e height envelope and clarification of extent of modification to rear. non relocation of compliant portion of building located in the rear yard setback. non reloc of | |
| Jan 2, 2019 | Expired or cancelled disapproved Mar 2019 | 3075 21st St | Vonnegut Thoreau Construction | strengthening of extg foundation and addition of interior grade beams, (low hazard storage group)Details
strengthening of extg foundation and addition of interior grade beams, (low hazard storage group) | $37,000 |
| Dec 27, 2018 | Completed final sign-off Jun 2021 | 737 04th Av | Oarcon Inc, Leonardo Construction Inc | remodel existing two story building, including a horizontal addition at the back of the building. add 2 bed and 2 bathsDetails
remodel existing two story building, including a horizontal addition at the back of the building. add 2 bed and 2 baths | $232,000 |
| Dec 21, 2018 | Completed final sign-off Aug 2022 | 432 Jackson St | Aidan Collins & Sons Inc, Lone Wolf Construction | to comply with nov 201851151. renovation on 2nd fl at 432 jackson st in order to legalize dwelling unit per ord# 43-14. maher n/a.Details
to comply with nov 201851151. renovation on 2nd fl at 432 jackson st in order to legalize dwelling unit per ord# 43-14. maher n/a. | $4,000 |
| Nov 19, 2018 | Completed final sign-off Feb 2019 | 2945 Pacific Av | David M Goray | unit 1. bathroom remodel w/ addition of new shower.Details
unit 1. bathroom remodel w/ addition of new shower. | $30,000 |
| Sep 13, 2018 | Completed final sign-off Dec 2019 | 2811 Vallejo St | Vonnegut Thoreau Construction | replacement of light fixtures. replacement of kitchen countertop and appliances addition of tub room, new laundry room at basementDetails
replacement of light fixtures. replacement of kitchen countertop and appliances addition of tub room, new laundry room at basement | $100,000 |
| Aug 31, 2018 | Completed final sign-off Mar 2019 | 130 Gates St | V And Company, Incorporated | rev. to pa # 201710100812. remodel of an existing two story over basement building including renovation of existing stairways, kitchen, addition of a bathroom and 2 dormers.Details
rev. to pa # 201710100812. remodel of an existing two story over basement building including renovation of existing stairways, kitchen, addition of a bathroom and 2 dormers. | |
| Aug 17, 2018 | Completed final sign-off Jul 2023 | 3962 Clay St | Box Canyon Builders Dba The Englander | excavation of existing garage and renovation of front facade, including replacement of windows and doors, new garage door and new wood trim **comply w/ maher ord, rout to dph**Details
excavation of existing garage and renovation of front facade, including replacement of windows and doors, new garage door and new wood trim **comply w/ maher ord, rout to dph** | $217,000 |
| Jul 24, 2018 | Completed final sign-off Jun 2021 | 3902 Clay St | Oak Leaf Construction | remodel an existing two-story bldg,including addition of a new story at the back of the bldg.raising the building by 16" & inserting a garage on the front facade along clay stDetails
remodel an existing two-story bldg,including addition of a new story at the back of the bldg.raising the building by 16" & inserting a garage on the front facade along clay st | $347,000 |
| Jun 27, 2018 | Expired or cancelled cancelled Jan 2026 | 251 Waller St | extension of existing roof deck over existing floor belowDetails
extension of existing roof deck over existing floor below | $15,000 | |
| Jun 12, 2018 | Completed final sign-off Dec 2018 | 3962 Clay St | Box Canyon Builders Dba The Englander | remodel of an existing three story building, renovating of existing kitchen, 4 bathrooms, and master bedroom n/a maherDetails
remodel of an existing three story building, renovating of existing kitchen, 4 bathrooms, and master bedroom n/a maher | $83,000 |
| May 25, 2018 | Completed final sign-off Jan 2021 | 327 Cumberland St | Moroso Construction Inc | remodel e 1 story building with basement storage to include 2 bedrooms, full kitchen, living room, pool and terraceDetails
remodel e 1 story building with basement storage to include 2 bedrooms, full kitchen, living room, pool and terrace | $250,000 |