Lone Wolf Construction
- Based in
- Vallejo
- On San Francisco permits
- Aug 2004 to Oct 2024
- Last 24 months
- 1 permit filed
36 permits since 2000: 31 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 11, 2024 | Expired or cancelled expired May 2026 | 867 45th Av | revision to 202002245246 to reflect updated title ser calculationsDetails
revision to 202002245246 to reflect updated title ser calculations | |
| Nov 17, 2021 | Expired or cancelled cancelled Jan 2026 | 44 Montclair Tr | relocation of (e) break wind wall 3 an (e) rooftop terrace and addition of new planters.Details
relocation of (e) break wind wall 3 an (e) rooftop terrace and addition of new planters. | $11,000 |
| Oct 17, 2020 | Completed final sign-off Jan 2022 | 2131 Divisadero St | remodel of (e) kitchen and bathrooms on 1st floor. no work to exterior.Details
remodel of (e) kitchen and bathrooms on 1st floor. no work to exterior. | $60,000 |
| Feb 24, 2020 | Completed final sign-off May 2026 | 867 45th Av | infill of lightwells near west & east property line.rear addition to 1st & 2nd fl.remodel of kitchens, relocation of bathroom on 1st floor.new master bathroom on 2nd floor. reconfig (n) rear stairs and addition of patio. update window schedules (a400), skylights (a400,a001) and reconfig windows 1/fDetails
infill of lightwells near west & east property line.rear addition to 1st & 2nd fl.remodel of kitchens, relocation of bathroom on 1st floor.new master bathroom on 2nd floor. reconfig (n) rear stairs and addition of patio. update window schedules (a400), skylights (a400,a001) and reconfig windows 1/f | $275,000 |
| Jan 7, 2020 | Completed final sign-off Dec 2020 | 2133 Vallejo St | replace all front windows with marvin ultimate aluminum-clad wood - casements, awnings, picture windows combos. 5 front, 4 sideDetails
replace all front windows with marvin ultimate aluminum-clad wood - casements, awnings, picture windows combos. 5 front, 4 side | $45,000 |
| Aug 15, 2019 | Never finaled filed Aug 2019, never issued | 432 Jackson St | removal of the kitchen on 2nd flr and abatement of the violation on the property complaint 201851151Details
removal of the kitchen on 2nd flr and abatement of the violation on the property complaint 201851151 | $1,500 |
| Mar 20, 2019 | Completed final sign-off Jun 2019 | 44 Montclair Tr | revision to app#201807134512. the length of new shear wall has increased on the basement level. n/a for maherDetails
revision to app#201807134512. the length of new shear wall has increased on the basement level. n/a for maher | $20,000 |
| Dec 21, 2018 | Completed final sign-off Aug 2022 | 432 Jackson St | to comply with nov 201851151. renovation on 2nd fl at 432 jackson st in order to legalize dwelling unit per ord# 43-14. maher n/a.Details
to comply with nov 201851151. renovation on 2nd fl at 432 jackson st in order to legalize dwelling unit per ord# 43-14. maher n/a. | $4,000 |
| Jul 13, 2018 | Completed final sign-off Jun 2019 | 44 Montclair Tr | remodel (e) 2-story over basement building. renovate (e) living rm, kitchen, master bedrm, bathrm, powder rm, and basementDetails
remodel (e) 2-story over basement building. renovate (e) living rm, kitchen, master bedrm, bathrm, powder rm, and basement | $78,000 |
| Nov 3, 2017 | Completed final sign-off Aug 2018 | 781 Francisco St | remodel of (e) 3 story building including renovation of existing two bathrooms, two kitchens & basements. replacement of rear & side windows in kind. not visible from st.Details
remodel of (e) 3 story building including renovation of existing two bathrooms, two kitchens & basements. replacement of rear & side windows in kind. not visible from st. | $47,000 |
| Jul 7, 2017 | Completed final sign-off Aug 2017 | 72 Macondray Ln | remove exisitng plywood decking, replace with ipe decking.Details
remove exisitng plywood decking, replace with ipe decking. | $8,000 |
| Oct 19, 2016 | Completed final sign-off Sep 2017 | 2026 10th Av | seismic grade beam, hold downs, clips, foundation bolts and shear wall. no calculations submitted or reviewed. all work at 1st floor.Details
seismic grade beam, hold downs, clips, foundation bolts and shear wall. no calculations submitted or reviewed. all work at 1st floor. | $35,000 |
| Aug 8, 2016 | Completed final sign-off Jun 2017 | 193 Dartmouth St | project scope: interior renovation of extg bath and kitchen and replacement of exterior windows in kind. no change to exterior envelope. no added square footage. no structural work.Details
project scope: interior renovation of extg bath and kitchen and replacement of exterior windows in kind. no change to exterior envelope. no added square footage. no structural work. | $120,000 |
| May 26, 2016 | Completed final sign-off Jul 2016 | 1570 Waller St | addendum to permit 201604074158, additional siding repair and replacement bay window side of front.Details
addendum to permit 201604074158, additional siding repair and replacement bay window side of front. | $14,000 |
| Feb 18, 2016 | Completed final sign-off Sep 2017 | 2026 10th Av | renovation of kitchen new finishes & fixtures conversion of kitchen annex to master bedroom closet. add sink to half bath. upgrade electrical service. new sheetrock & insulation in garage ceiling.Details
renovation of kitchen new finishes & fixtures conversion of kitchen annex to master bedroom closet. add sink to half bath. upgrade electrical service. new sheetrock & insulation in garage ceiling. | $125,000 |
| Aug 28, 2014 | Completed final sign-off Sep 2014 | 368 Day St | remove & replace drywall for inspection. 3x5' concrete floor area to cap off old drain lines, pour new concrete, close all sheetrock, paint as necessary.Details
remove & replace drywall for inspection. 3x5' concrete floor area to cap off old drain lines, pour new concrete, close all sheetrock, paint as necessary. | $5,000 |
| Jan 21, 2014 | Completed final sign-off Dec 2014 | 2054 Ellis St | remodel bathrooms in both units:remodel kitchen in 2054 ellis st. new toilets in water closets in both units. paint both units. new hardwood flrs, new furnace 95% efficeint & new lighting in kitche in 2054, new lighting in baths & water closets. new cabinets. replace back french doors in 2054 ellis.Details
remodel bathrooms in both units:remodel kitchen in 2054 ellis st. new toilets in water closets in both units. paint both units. new hardwood flrs, new furnace 95% efficeint & new lighting in kitche in 2054, new lighting in baths & water closets. new cabinets. replace back french doors in 2054 ellis. | $140,000 |
| Jun 4, 2013 | Completed final sign-off Sep 2013 | 336 Texas St | kitchen & bathroom remodel - new cabinets, tile floor, appliances, lighting warm floor, new closet cabinets, new bathroom floor + warm floor, new shower & tile, painting.Details
kitchen & bathroom remodel - new cabinets, tile floor, appliances, lighting warm floor, new closet cabinets, new bathroom floor + warm floor, new shower & tile, painting. | $75,000 |
| Apr 16, 2012 | Never finaled issued Apr 2012, no final | 2813 Pine St | remove existing bushes and slab adjacent to driveway. new brick planter boxes on either side of driveway. remove and replace 9 front elevation windows, using marvin historic replacement windows. paint to match existing. visible from street.Details
remove existing bushes and slab adjacent to driveway. new brick planter boxes on either side of driveway. remove and replace 9 front elevation windows, using marvin historic replacement windows. paint to match existing. visible from street. | $22,000 |
| Feb 16, 2012 | Completed final sign-off Jul 2012 | 368 Day St | rebuild rear stairway from deck to backyard. install privacy handrail extension. rebuild front stairway to entry. paint to match extg.Details
rebuild rear stairway from deck to backyard. install privacy handrail extension. rebuild front stairway to entry. paint to match extg. | $27,000 |
| Nov 29, 2011 | Completed final sign-off Dec 2011 | 785 Francisco St | remove existing deck boards and handrail, comply with nov 201170633, install new pressure treated rim joists, install new ipe handrail with cables, install new 1x6 ipe decking. install 14 ft of new stucco moulding at roof door entrance, install new 3 ft piece rDetails
remove existing deck boards and handrail, comply with nov 201170633, install new pressure treated rim joists, install new ipe handrail with cables, install new 1x6 ipe decking. install 14 ft of new stucco moulding at roof door entrance, install new 3 ft piece r | $4,000 |
| Oct 25, 2010 | Completed final sign-off Sep 2011 | 2813 Pine St | pitched roof over existing rear addition will be demolished and replaced with a deck. existing stairs from first floor to rear yard will be removed, and a new deck will be added.Details
pitched roof over existing rear addition will be demolished and replaced with a deck. existing stairs from first floor to rear yard will be removed, and a new deck will be added. | $18,000 |
| Sep 21, 2010 | Completed final sign-off Sep 2011 | 2813 Pine St | replacement of interior flooring wall finishes new lighting and heating. structural shear walls and grade beams-new roof sheating and roofing. demolition of extg rear interior stair. new interior stair to basement.Details
replacement of interior flooring wall finishes new lighting and heating. structural shear walls and grade beams-new roof sheating and roofing. demolition of extg rear interior stair. new interior stair to basement. | $280,000 |
| Feb 23, 2010 | Completed final sign-off May 2010 | 481 Euclid Av | unit on 2nd floor. kitchen remodel incl. demo old one, new windows not visible from street. new plumbing, electrical, lighting, insulation, sheet rock, cabinets, counter tops, new tile floor, back splaseh, appliances, pantruy doors, and removal of non bearing wallDetails
unit on 2nd floor. kitchen remodel incl. demo old one, new windows not visible from street. new plumbing, electrical, lighting, insulation, sheet rock, cabinets, counter tops, new tile floor, back splaseh, appliances, pantruy doors, and removal of non bearing wall | $58,000 |
| Sep 15, 2009 | Completed final sign-off Dec 2009 | 138 15th Av | demo existing bath. install new stall shower, move toilet location. re-frame south wall for new window. new vanity gard, 2 sinks, new exhaust fan and flurescent lighting. new heated floor. tile on floor, slab stone in shower.Details
demo existing bath. install new stall shower, move toilet location. re-frame south wall for new window. new vanity gard, 2 sinks, new exhaust fan and flurescent lighting. new heated floor. tile on floor, slab stone in shower. | $41,000 |
| Apr 6, 2009 | Completed final sign-off Jul 2009 | 374 Day St | kitchen remodel. add 1 bath and reconfigure/upgrade existing powder room, add bath to master bath, enlarge opening in the bearing wall in between dining room and ktichen. add post and beam.Details
kitchen remodel. add 1 bath and reconfigure/upgrade existing powder room, add bath to master bath, enlarge opening in the bearing wall in between dining room and ktichen. add post and beam. | $78,000 |
| May 21, 2008 | Completed final sign-off Aug 2008 | 2925 Lake St | kitchen remodel, demo of old kitchen, new plumbing and electrical , insulation, sheetrock, cabinets and appliances, stone fl, replace three windows to insulated, new trim & modding.Details
kitchen remodel, demo of old kitchen, new plumbing and electrical , insulation, sheetrock, cabinets and appliances, stone fl, replace three windows to insulated, new trim & modding. | $70,000 |
| Mar 12, 2008 | Completed final sign-off Jun 2008 | 713 Page St | remove plaster & lathe at ktichen,hall,bath,toilet rm,closets & walls.frame new closet,bath entry frame new bath partition, new insulation , new 5/8" sheetrock in all areas of work. new update elec & plbg in area of work, new tile in baths, new cabinets in kitchen & bath,appliances,countertops,trimDetails
remove plaster & lathe at ktichen,hall,bath,toilet rm,closets & walls.frame new closet,bath entry frame new bath partition, new insulation , new 5/8" sheetrock in all areas of work. new update elec & plbg in area of work, new tile in baths, new cabinets in kitchen & bath,appliances,countertops,trim | $65,000 |
| Jan 28, 2008 | Completed final sign-off May 2008 | 358 Pacheco St | kitchen finishes & fixtures upgrade. electrical & plumbing fixtures upgrade. upgrade flooring. replace (e) windows. close in french doors with wall. plumbing & electrical upgrade in (e) locations at powder room. no exterior site work or structural work.Details
kitchen finishes & fixtures upgrade. electrical & plumbing fixtures upgrade. upgrade flooring. replace (e) windows. close in french doors with wall. plumbing & electrical upgrade in (e) locations at powder room. no exterior site work or structural work. | $60,000 |
| Oct 30, 2007 | Completed final sign-off May 2008 | 2925 Lake St | remodel two bathrooms. remove toilets , sinks and tile, tubs to remain. open walls for new eledtrical, plumbing, insulation, and sheetrock. install new tile in both tub surrounds and 1 shower enclosure. install new plumbing valves, new lighting, ventilation fans, tile and paint.. warm floor in baDetails
remodel two bathrooms. remove toilets , sinks and tile, tubs to remain. open walls for new eledtrical, plumbing, insulation, and sheetrock. install new tile in both tub surrounds and 1 shower enclosure. install new plumbing valves, new lighting, ventilation fans, tile and paint.. warm floor in ba | $27,500 |
| Oct 22, 2007 | Completed final sign-off Jan 2008 | 1952 15th St | 3/f- remodel existing kitchen and full bathroom. new cabinets, counters, appliances, lighting. new bathtub and tile, new fixtures, cabinets & lighting, ventilation.Details
3/f- remodel existing kitchen and full bathroom. new cabinets, counters, appliances, lighting. new bathtub and tile, new fixtures, cabinets & lighting, ventilation. | $32,000 |
| Sep 26, 2007 | Expired or cancelled expired Aug 2008 | 601 04th St | work @ unit# 320 only. redo 1 bathroom. replace fixtures with like fixtures. tub for tub, sink for sink. not moving the toilet. put new medicine cabinets with florescent lights. (replace existing lights).Details
work @ unit# 320 only. redo 1 bathroom. replace fixtures with like fixtures. tub for tub, sink for sink. not moving the toilet. put new medicine cabinets with florescent lights. (replace existing lights). | $12,000 |
| Sep 17, 2007 | Completed final sign-off Oct 2007 | 1998 Broadway | unit #407 (ground floor on broadway st) - move (e) sliding glass wall approx. 5'0" to building wall perimeter (patio enclosure). (n) sliding glass door is more than 5'-0" from property line. common modification for this building. install electrical outlet on exterior wall of #407.Details
unit #407 (ground floor on broadway st) - move (e) sliding glass wall approx. 5'0" to building wall perimeter (patio enclosure). (n) sliding glass door is more than 5'-0" from property line. common modification for this building. install electrical outlet on exterior wall of #407. | $5,000 |
| Aug 30, 2007 | Completed final sign-off Sep 2007 | 601 04th St | for records only. revision to 200609283688. mechanical, fire alarms, sprinklers and lighting not required.Details
for records only. revision to 200609283688. mechanical, fire alarms, sprinklers and lighting not required. | |
| Apr 21, 2006 | Completed final sign-off Jun 2006 | 749 27th Av | install new access door to backyard, reframe wall for new windows on either side door. frame new stair down to backyard. land stairs on concrete pad. change out 5 other windows in house.Details
install new access door to backyard, reframe wall for new windows on either side door. frame new stair down to backyard. land stairs on concrete pad. change out 5 other windows in house. | $14,000 |
| Aug 10, 2004 | Completed final sign-off May 2005 | 711 Page St | remodel (2) bathrooms on 3rd floor unit#711. convert split bath into two full baths.Details
remodel (2) bathrooms on 3rd floor unit#711. convert split bath into two full baths. | $10,000 |