Lone Wolf Construction
- Based in
- Vallejo
- On San Francisco permits
- Aug 2004 to Oct 2024
- Last 24 months
- 1 permit filed
36 permits since 2000: 31 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
3 deck permits: 3 completed. Typically 1 days from filing to permit and 161 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2012 | Completed final sign-off Jul 2012 | 368 Day St | rebuild rear stairway from deck to backyard. install privacy handrail extension. rebuild front stairway to entry. paint to match extg.Details
rebuild rear stairway from deck to backyard. install privacy handrail extension. rebuild front stairway to entry. paint to match extg. | $27,000 |
| Nov 29, 2011 | Completed final sign-off Dec 2011 | 785 Francisco St | remove existing deck boards and handrail, comply with nov 201170633, install new pressure treated rim joists, install new ipe handrail with cables, install new 1x6 ipe decking. install 14 ft of new stucco moulding at roof door entrance, install new 3 ft piece rDetails
remove existing deck boards and handrail, comply with nov 201170633, install new pressure treated rim joists, install new ipe handrail with cables, install new 1x6 ipe decking. install 14 ft of new stucco moulding at roof door entrance, install new 3 ft piece r | $4,000 |
| Oct 25, 2010 | Completed final sign-off Sep 2011 | 2813 Pine St | pitched roof over existing rear addition will be demolished and replaced with a deck. existing stairs from first floor to rear yard will be removed, and a new deck will be added.Details
pitched roof over existing rear addition will be demolished and replaced with a deck. existing stairs from first floor to rear yard will be removed, and a new deck will be added. | $18,000 |