Back to bathroom remodel contractors
Lone Wolf Construction
- Based in
- Vallejo
- On San Francisco permits
- Aug 2004 to Oct 2024
- Last 24 months
- 1 permit filed
36 permits since 2000: 31 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 270 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2020 | Completed final sign-off Jan 2022 | 2131 Divisadero St | remodel of (e) kitchen and bathrooms on 1st floor. no work to exterior.Details
remodel of (e) kitchen and bathrooms on 1st floor. no work to exterior. | $60,000 |
| Feb 24, 2020 | Completed final sign-off May 2026 | 867 45th Av | infill of lightwells near west & east property line.rear addition to 1st & 2nd fl.remodel of kitchens, relocation of bathroom on 1st floor.new master bathroom on 2nd floor. reconfig (n) rear stairs and addition of patio. update window schedules (a400), skylights (a400,a001) and reconfig windows 1/fDetails
infill of lightwells near west & east property line.rear addition to 1st & 2nd fl.remodel of kitchens, relocation of bathroom on 1st floor.new master bathroom on 2nd floor. reconfig (n) rear stairs and addition of patio. update window schedules (a400), skylights (a400,a001) and reconfig windows 1/f | $275,000 |
| Nov 3, 2017 | Completed final sign-off Aug 2018 | 781 Francisco St | remodel of (e) 3 story building including renovation of existing two bathrooms, two kitchens & basements. replacement of rear & side windows in kind. not visible from st.Details
remodel of (e) 3 story building including renovation of existing two bathrooms, two kitchens & basements. replacement of rear & side windows in kind. not visible from st. | $47,000 |
| Aug 8, 2016 | Completed final sign-off Jun 2017 | 193 Dartmouth St | project scope: interior renovation of extg bath and kitchen and replacement of exterior windows in kind. no change to exterior envelope. no added square footage. no structural work.Details
project scope: interior renovation of extg bath and kitchen and replacement of exterior windows in kind. no change to exterior envelope. no added square footage. no structural work. | $120,000 |
| Feb 18, 2016 | Completed final sign-off Sep 2017 | 2026 10th Av | renovation of kitchen new finishes & fixtures conversion of kitchen annex to master bedroom closet. add sink to half bath. upgrade electrical service. new sheetrock & insulation in garage ceiling.Details
renovation of kitchen new finishes & fixtures conversion of kitchen annex to master bedroom closet. add sink to half bath. upgrade electrical service. new sheetrock & insulation in garage ceiling. | $125,000 |
| Jan 21, 2014 | Completed final sign-off Dec 2014 | 2054 Ellis St | remodel bathrooms in both units:remodel kitchen in 2054 ellis st. new toilets in water closets in both units. paint both units. new hardwood flrs, new furnace 95% efficeint & new lighting in kitche in 2054, new lighting in baths & water closets. new cabinets. replace back french doors in 2054 ellis.Details
remodel bathrooms in both units:remodel kitchen in 2054 ellis st. new toilets in water closets in both units. paint both units. new hardwood flrs, new furnace 95% efficeint & new lighting in kitche in 2054, new lighting in baths & water closets. new cabinets. replace back french doors in 2054 ellis. | $140,000 |
| Jun 4, 2013 | Completed final sign-off Sep 2013 | 336 Texas St | kitchen & bathroom remodel - new cabinets, tile floor, appliances, lighting warm floor, new closet cabinets, new bathroom floor + warm floor, new shower & tile, painting.Details
kitchen & bathroom remodel - new cabinets, tile floor, appliances, lighting warm floor, new closet cabinets, new bathroom floor + warm floor, new shower & tile, painting. | $75,000 |
| Sep 15, 2009 | Completed final sign-off Dec 2009 | 138 15th Av | demo existing bath. install new stall shower, move toilet location. re-frame south wall for new window. new vanity gard, 2 sinks, new exhaust fan and flurescent lighting. new heated floor. tile on floor, slab stone in shower.Details
demo existing bath. install new stall shower, move toilet location. re-frame south wall for new window. new vanity gard, 2 sinks, new exhaust fan and flurescent lighting. new heated floor. tile on floor, slab stone in shower. | $41,000 |
| Apr 6, 2009 | Completed final sign-off Jul 2009 | 374 Day St | kitchen remodel. add 1 bath and reconfigure/upgrade existing powder room, add bath to master bath, enlarge opening in the bearing wall in between dining room and ktichen. add post and beam.Details
kitchen remodel. add 1 bath and reconfigure/upgrade existing powder room, add bath to master bath, enlarge opening in the bearing wall in between dining room and ktichen. add post and beam. | $78,000 |
| Mar 12, 2008 | Completed final sign-off Jun 2008 | 713 Page St | remove plaster & lathe at ktichen,hall,bath,toilet rm,closets & walls.frame new closet,bath entry frame new bath partition, new insulation , new 5/8" sheetrock in all areas of work. new update elec & plbg in area of work, new tile in baths, new cabinets in kitchen & bath,appliances,countertops,trimDetails
remove plaster & lathe at ktichen,hall,bath,toilet rm,closets & walls.frame new closet,bath entry frame new bath partition, new insulation , new 5/8" sheetrock in all areas of work. new update elec & plbg in area of work, new tile in baths, new cabinets in kitchen & bath,appliances,countertops,trim | $65,000 |
| Oct 30, 2007 | Completed final sign-off May 2008 | 2925 Lake St | remodel two bathrooms. remove toilets , sinks and tile, tubs to remain. open walls for new eledtrical, plumbing, insulation, and sheetrock. install new tile in both tub surrounds and 1 shower enclosure. install new plumbing valves, new lighting, ventilation fans, tile and paint.. warm floor in baDetails
remodel two bathrooms. remove toilets , sinks and tile, tubs to remain. open walls for new eledtrical, plumbing, insulation, and sheetrock. install new tile in both tub surrounds and 1 shower enclosure. install new plumbing valves, new lighting, ventilation fans, tile and paint.. warm floor in ba | $27,500 |
| Oct 22, 2007 | Completed final sign-off Jan 2008 | 1952 15th St | 3/f- remodel existing kitchen and full bathroom. new cabinets, counters, appliances, lighting. new bathtub and tile, new fixtures, cabinets & lighting, ventilation.Details
3/f- remodel existing kitchen and full bathroom. new cabinets, counters, appliances, lighting. new bathtub and tile, new fixtures, cabinets & lighting, ventilation. | $32,000 |
| Sep 26, 2007 | Expired or cancelled expired Aug 2008 | 601 04th St | work @ unit# 320 only. redo 1 bathroom. replace fixtures with like fixtures. tub for tub, sink for sink. not moving the toilet. put new medicine cabinets with florescent lights. (replace existing lights).Details
work @ unit# 320 only. redo 1 bathroom. replace fixtures with like fixtures. tub for tub, sink for sink. not moving the toilet. put new medicine cabinets with florescent lights. (replace existing lights). | $12,000 |
| Aug 10, 2004 | Completed final sign-off May 2005 | 711 Page St | remodel (2) bathrooms on 3rd floor unit#711. convert split bath into two full baths.Details
remodel (2) bathrooms on 3rd floor unit#711. convert split bath into two full baths. | $10,000 |