Back to kitchen remodel contractors
Lone Wolf Construction
- Based in
- Vallejo
- On San Francisco permits
- Aug 2004 to Oct 2024
- Last 24 months
- 1 permit filed
36 permits since 2000: 31 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 14 completed, 1 never finaled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 17, 2020 | Completed final sign-off Jan 2022 | 2131 Divisadero St | remodel of (e) kitchen and bathrooms on 1st floor. no work to exterior.Details
remodel of (e) kitchen and bathrooms on 1st floor. no work to exterior. | $60,000 |
| Feb 24, 2020 | Completed final sign-off May 2026 | 867 45th Av | infill of lightwells near west & east property line.rear addition to 1st & 2nd fl.remodel of kitchens, relocation of bathroom on 1st floor.new master bathroom on 2nd floor. reconfig (n) rear stairs and addition of patio. update window schedules (a400), skylights (a400,a001) and reconfig windows 1/fDetails
infill of lightwells near west & east property line.rear addition to 1st & 2nd fl.remodel of kitchens, relocation of bathroom on 1st floor.new master bathroom on 2nd floor. reconfig (n) rear stairs and addition of patio. update window schedules (a400), skylights (a400,a001) and reconfig windows 1/f | $275,000 |
| Aug 15, 2019 | Never finaled filed Aug 2019, never issued | 432 Jackson St | removal of the kitchen on 2nd flr and abatement of the violation on the property complaint 201851151Details
removal of the kitchen on 2nd flr and abatement of the violation on the property complaint 201851151 | $1,500 |
| Jul 13, 2018 | Completed final sign-off Jun 2019 | 44 Montclair Tr | remodel (e) 2-story over basement building. renovate (e) living rm, kitchen, master bedrm, bathrm, powder rm, and basementDetails
remodel (e) 2-story over basement building. renovate (e) living rm, kitchen, master bedrm, bathrm, powder rm, and basement | $78,000 |
| Nov 3, 2017 | Completed final sign-off Aug 2018 | 781 Francisco St | remodel of (e) 3 story building including renovation of existing two bathrooms, two kitchens & basements. replacement of rear & side windows in kind. not visible from st.Details
remodel of (e) 3 story building including renovation of existing two bathrooms, two kitchens & basements. replacement of rear & side windows in kind. not visible from st. | $47,000 |
| Aug 8, 2016 | Completed final sign-off Jun 2017 | 193 Dartmouth St | project scope: interior renovation of extg bath and kitchen and replacement of exterior windows in kind. no change to exterior envelope. no added square footage. no structural work.Details
project scope: interior renovation of extg bath and kitchen and replacement of exterior windows in kind. no change to exterior envelope. no added square footage. no structural work. | $120,000 |
| Feb 18, 2016 | Completed final sign-off Sep 2017 | 2026 10th Av | renovation of kitchen new finishes & fixtures conversion of kitchen annex to master bedroom closet. add sink to half bath. upgrade electrical service. new sheetrock & insulation in garage ceiling.Details
renovation of kitchen new finishes & fixtures conversion of kitchen annex to master bedroom closet. add sink to half bath. upgrade electrical service. new sheetrock & insulation in garage ceiling. | $125,000 |
| Jan 21, 2014 | Completed final sign-off Dec 2014 | 2054 Ellis St | remodel bathrooms in both units:remodel kitchen in 2054 ellis st. new toilets in water closets in both units. paint both units. new hardwood flrs, new furnace 95% efficeint & new lighting in kitche in 2054, new lighting in baths & water closets. new cabinets. replace back french doors in 2054 ellis.Details
remodel bathrooms in both units:remodel kitchen in 2054 ellis st. new toilets in water closets in both units. paint both units. new hardwood flrs, new furnace 95% efficeint & new lighting in kitche in 2054, new lighting in baths & water closets. new cabinets. replace back french doors in 2054 ellis. | $140,000 |
| Jun 4, 2013 | Completed final sign-off Sep 2013 | 336 Texas St | kitchen & bathroom remodel - new cabinets, tile floor, appliances, lighting warm floor, new closet cabinets, new bathroom floor + warm floor, new shower & tile, painting.Details
kitchen & bathroom remodel - new cabinets, tile floor, appliances, lighting warm floor, new closet cabinets, new bathroom floor + warm floor, new shower & tile, painting. | $75,000 |
| Feb 23, 2010 | Completed final sign-off May 2010 | 481 Euclid Av | unit on 2nd floor. kitchen remodel incl. demo old one, new windows not visible from street. new plumbing, electrical, lighting, insulation, sheet rock, cabinets, counter tops, new tile floor, back splaseh, appliances, pantruy doors, and removal of non bearing wallDetails
unit on 2nd floor. kitchen remodel incl. demo old one, new windows not visible from street. new plumbing, electrical, lighting, insulation, sheet rock, cabinets, counter tops, new tile floor, back splaseh, appliances, pantruy doors, and removal of non bearing wall | $58,000 |
| Apr 6, 2009 | Completed final sign-off Jul 2009 | 374 Day St | kitchen remodel. add 1 bath and reconfigure/upgrade existing powder room, add bath to master bath, enlarge opening in the bearing wall in between dining room and ktichen. add post and beam.Details
kitchen remodel. add 1 bath and reconfigure/upgrade existing powder room, add bath to master bath, enlarge opening in the bearing wall in between dining room and ktichen. add post and beam. | $78,000 |
| May 21, 2008 | Completed final sign-off Aug 2008 | 2925 Lake St | kitchen remodel, demo of old kitchen, new plumbing and electrical , insulation, sheetrock, cabinets and appliances, stone fl, replace three windows to insulated, new trim & modding.Details
kitchen remodel, demo of old kitchen, new plumbing and electrical , insulation, sheetrock, cabinets and appliances, stone fl, replace three windows to insulated, new trim & modding. | $70,000 |
| Mar 12, 2008 | Completed final sign-off Jun 2008 | 713 Page St | remove plaster & lathe at ktichen,hall,bath,toilet rm,closets & walls.frame new closet,bath entry frame new bath partition, new insulation , new 5/8" sheetrock in all areas of work. new update elec & plbg in area of work, new tile in baths, new cabinets in kitchen & bath,appliances,countertops,trimDetails
remove plaster & lathe at ktichen,hall,bath,toilet rm,closets & walls.frame new closet,bath entry frame new bath partition, new insulation , new 5/8" sheetrock in all areas of work. new update elec & plbg in area of work, new tile in baths, new cabinets in kitchen & bath,appliances,countertops,trim | $65,000 |
| Jan 28, 2008 | Completed final sign-off May 2008 | 358 Pacheco St | kitchen finishes & fixtures upgrade. electrical & plumbing fixtures upgrade. upgrade flooring. replace (e) windows. close in french doors with wall. plumbing & electrical upgrade in (e) locations at powder room. no exterior site work or structural work.Details
kitchen finishes & fixtures upgrade. electrical & plumbing fixtures upgrade. upgrade flooring. replace (e) windows. close in french doors with wall. plumbing & electrical upgrade in (e) locations at powder room. no exterior site work or structural work. | $60,000 |
| Oct 22, 2007 | Completed final sign-off Jan 2008 | 1952 15th St | 3/f- remodel existing kitchen and full bathroom. new cabinets, counters, appliances, lighting. new bathtub and tile, new fixtures, cabinets & lighting, ventilation.Details
3/f- remodel existing kitchen and full bathroom. new cabinets, counters, appliances, lighting. new bathtub and tile, new fixtures, cabinets & lighting, ventilation. | $32,000 |