Block 0996, lot 031
250 Laurel St
- City’s use
- Single Family Residential
- Built
- 1917
- Stories
- 1
- Units
- 1
- Rooms
- 4 bedrooms, 2 bathrooms
- Building
- 3,630 sq ft
- Zoning
- RH1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 11, 2024 | Completed final sign-off Sep 2025 | 250 Laurel St | Vonnegut Thoreau Construction | unit 101: kitchen and 2 bath remodel, update electrical, replace fireplace with gas insertDetails
unit 101: kitchen and 2 bath remodel, update electrical, replace fireplace with gas insert | $70,000 |
| May 3, 2021 | Expired or cancelled cancelled Jul 2023 | 250 Laurel St | San Francisco Fire Protection | as built plans: heat detector was installed instead of smoke detector at basement floor in front of elevator; fa reference pa# 2020 1208 0563Details
as built plans: heat detector was installed instead of smoke detector at basement floor in front of elevator; fa reference pa# 2020 1208 0563 | |
| Dec 8, 2020 | Never finaled issued Jan 2021, no final | 250 Laurel St | San Francisco Fire Protection | like for like, voluntary fire alarm system replacement installation in sprinkler building. replace of existing facp with a new ifp-75 fire alarm control unit. facu will be installed from 66" to 72" maximum at eye level, first level, install of new aes 7707 wireless communicator near panel.Details
like for like, voluntary fire alarm system replacement installation in sprinkler building. replace of existing facp with a new ifp-75 fire alarm control unit. facu will be installed from 66" to 72" maximum at eye level, first level, install of new aes 7707 wireless communicator near panel. | $14,450 |
| Jul 1, 2020 | Never finaled filed Jul 2020, never issued | 250 Laurel St | street spaceDetails
street space | ||
| Aug 16, 2018 | Never finaled issued Aug 2018, no final | 250 Laurel St | street spaceDetails
street space | ||
| Jul 20, 2018 | Never finaled issued Jul 2018, no final | 250 Laurel St | street spaceDetails
street space | ||
| May 15, 2018 | Never finaled issued May 2018, no final | 250 Laurel St | street spaceDetails
street space | ||
| Feb 22, 2018 | Never finaled issued Feb 2018, no final | 250 Laurel St | street spaceDetails
street space | ||
| Sep 13, 2016 | Never finaled issued Sep 2016, no final | 250 Laurel St | streetspaceDetails
streetspace | ||
| Sep 8, 2015 | Completed final sign-off Dec 2015 | 250 Laurel St | Bay Marin Construction | unit 102: remodel bathroom in common area (managers unit), no walls moved, removed, added, or infilled. sink to move to foot of shower, remove tub & replace with shower, toilet location to remain unchanged.Details
unit 102: remodel bathroom in common area (managers unit), no walls moved, removed, added, or infilled. sink to move to foot of shower, remove tub & replace with shower, toilet location to remain unchanged. | $30,000 |
| Sep 23, 2011 | Never finaled issued Sep 2011, no final | 250 Laurel St | street spaceDetails
street space | ||
| Sep 10, 2010 | Never finaled issued Sep 2010, no final | 250 Laurel St | street space permitDetails
street space permit | ||
| Mar 10, 2009 | Never finaled issued Mar 2009, no final | 250 Laurel St | street space only.Details
street space only. | ||
| Aug 5, 2008 | Completed final sign-off Sep 2008 | 250 Laurel St | Castle Construction Inc. | repair two existing, 5 story stair cases to have new infill rail w/ opening, less than 4", and modify existing guardrails to be 42" high, to comply w/ nov 200842391.Details
repair two existing, 5 story stair cases to have new infill rail w/ opening, less than 4", and modify existing guardrails to be 42" high, to comply w/ nov 200842391. | $25,000 |
| Jul 18, 2006 | Completed final sign-off Jan 2007 | 250 Laurel St | Bay Marin Construction | complete remodel of master bathroom, relocate shower drain, upgrade plumbing, add gas line to rear porch.Details
complete remodel of master bathroom, relocate shower drain, upgrade plumbing, add gas line to rear porch. | $25,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bay Marin Construction (2), San Francisco Fire Protection (2), Castle Construction Inc., Vonnegut Thoreau Construction
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.