Back to bathroom remodel contractors
Vonnegut Thoreau Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2011 to Sep 2026
- Last 24 months
- 10 permits filed
123 permits since 2000: 83 completed, 11 in progress, 15 never finaled, 14 expired or cancelled.
Of the 15 never-finaled permits, 1 is 3 to 5 years old, 7 are 5 to 10 years old, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
31 bathroom remodel permits: 18 completed, 5 in progress, 4 never finaled, 4 expired or cancelled. Typically 7 days from filing to permit and 212 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Sep 2026 | 250 Laurel St | unit 202-remodel and reconfigure the primary bathroom. reconfigure the coat laundry closets. new kitchen flooring. replace 5 street facing wood windows in kind.Details
unit 202-remodel and reconfigure the primary bathroom. reconfigure the coat laundry closets. new kitchen flooring. replace 5 street facing wood windows in kind. | $51,069 |
| Jun 26, 2026 | In progress issued Jul 2026 | 165 Francisco St | remodel of (e) kitchen, 3 bathrooms and interior finishes.Details
remodel of (e) kitchen, 3 bathrooms and interior finishes. | $148,000 |
| Jun 1, 2026 | In progress issued Jun 2026 | 1039 Vallejo St | bathroom remodel on 1st floor like for like.Details
bathroom remodel on 1st floor like for like. | $22,000 |
| Feb 23, 2026 | In progress issued Feb 2026 | 1634 Dolores St | level 1: interior work including remodel of (e) bathroom and new laundry. no proposed work on level 2.Details
level 1: interior work including remodel of (e) bathroom and new laundry. no proposed work on level 2. | $50,000 |
| Jul 24, 2025 | Completed final sign-off Sep 2025 | 2020 Great Hy | kitchen remodel: countertops and appliances. 1- bathroom: retile due to water damage.Details
kitchen remodel: countertops and appliances. 1- bathroom: retile due to water damage. | $30,000 |
| Jul 21, 2025 | In progress issued Jul 2025 | 19 Topaz Wy | to convert the existing basement into the bedroom , bathroom and family room. 960 square feet dof conditioned space . to replace existing stairs with code compliant new stairs. new exterior deck and stairs down to the backyard.Details
to convert the existing basement into the bedroom , bathroom and family room. 960 square feet dof conditioned space . to replace existing stairs with code compliant new stairs. new exterior deck and stairs down to the backyard. | $50,000 |
| Dec 11, 2024 | Completed final sign-off Sep 2025 | 250 Laurel St | unit 101: kitchen and 2 bath remodel, update electrical, replace fireplace with gas insertDetails
unit 101: kitchen and 2 bath remodel, update electrical, replace fireplace with gas insert | $70,000 |
| May 6, 2024 | Completed final sign-off Dec 2024 | 4229 Moraga St | remodel 3 bathrooms, 1 kitchen in kindDetails
remodel 3 bathrooms, 1 kitchen in kind | $110,000 |
| Feb 16, 2021 | Completed final sign-off Jan 2023 | 2457 Scott St | renovation of 2nd floor bathroom. cabinet installation in 2nd floor bedroom. window replacement on west & north (non street facing) sides. 12 windows total. all work in kind.Details
renovation of 2nd floor bathroom. cabinet installation in 2nd floor bedroom. window replacement on west & north (non street facing) sides. 12 windows total. all work in kind. | $40,000 |
| Jan 6, 2021 | Completed final sign-off Jul 2021 | 2801 Jackson St | #7: new kitchen cabinetry and drywall work. new bathroom cabinetry + drywall + fixture replacement. kitchen and bathroom to be remodeled are existing.Details
#7: new kitchen cabinetry and drywall work. new bathroom cabinetry + drywall + fixture replacement. kitchen and bathroom to be remodeled are existing. | $13,500 |
| Jul 23, 2020 | Completed final sign-off Jan 2023 | 3349 Broderick St | remodel e 5316 sf 4 story 3 unit residential w 2 car garage. new exterior windows 2nd and 3rd floor. 3rd fl new kitchen area, new elec/lighting.new powder room, new bath. 4th fl: new master bedroom and master bath. new powder roomDetails
remodel e 5316 sf 4 story 3 unit residential w 2 car garage. new exterior windows 2nd and 3rd floor. 3rd fl new kitchen area, new elec/lighting.new powder room, new bath. 4th fl: new master bedroom and master bath. new powder room | $175,000 |
| Jul 8, 2019 | Completed final sign-off May 2021 | 2457 Scott St | replace (e)dry rotted frame below front stoop. (n) gas inserts at 2(e) fireplaces. restore orig window size at 1 location at front facade. reconfig int walls at 2nd lvl. (n)master suite & laundry room. remove paritial ht partitions at 3rd lvl, remove bath, (n) wet bar. upgrade electr, plumb fixturesDetails
replace (e)dry rotted frame below front stoop. (n) gas inserts at 2(e) fireplaces. restore orig window size at 1 location at front facade. reconfig int walls at 2nd lvl. (n)master suite & laundry room. remove paritial ht partitions at 3rd lvl, remove bath, (n) wet bar. upgrade electr, plumb fixtures | $30,000 |
| Apr 4, 2019 | Completed final sign-off Dec 2019 | 2811 Vallejo St | new finishes at unfinished space below basement. new door, new window, new half bath.Details
new finishes at unfinished space below basement. new door, new window, new half bath. | $70,000 |
| Oct 30, 2017 | Completed final sign-off Jun 2018 | 601 04th St | #320: interior loft renovation. kitchen remodel, expansion of mezzanine and addition of a second bathroom at the mezzanine level. maher naDetails
#320: interior loft renovation. kitchen remodel, expansion of mezzanine and addition of a second bathroom at the mezzanine level. maher na | $100,000 |
| Sep 16, 2016 | Never finaled issued Apr 2017, no final | 2931 Pierce St | proposed interior remodel of kitchen, replacement of main interior stair, master bedroom and bathroom remodel. remodel incudes new windows, skylights, plumbing/electrical fixtures and appliances.Details
proposed interior remodel of kitchen, replacement of main interior stair, master bedroom and bathroom remodel. remodel incudes new windows, skylights, plumbing/electrical fixtures and appliances. | $350,000 |
| Mar 2, 2016 | Expired or cancelled cancelled Apr 2019 | 1763 Green St | rear expansion of bottom unit of(e)2 unit bldg;add living rm,1 bedrm & bath at bsmt. including the garage level + 1st flr level are to be expanded toward the rear yard under an (e) deck. new exterior doors + windows will be installed at the rear elevation. no change to street facade of the building.Details
rear expansion of bottom unit of(e)2 unit bldg;add living rm,1 bedrm & bath at bsmt. including the garage level + 1st flr level are to be expanded toward the rear yard under an (e) deck. new exterior doors + windows will be installed at the rear elevation. no change to street facade of the building. | $72,000 |
| Jan 27, 2016 | Completed final sign-off Oct 2018 | 195 Magellan Av | replace exterior doors & windows. remove rear 2nd floor deck and remodel (e) kitchen, remodel (e) bathrooms and interior partitions. reconfigure (e) stair. new furnace & w/h. addition of 1 full bath.Details
replace exterior doors & windows. remove rear 2nd floor deck and remodel (e) kitchen, remodel (e) bathrooms and interior partitions. reconfigure (e) stair. new furnace & w/h. addition of 1 full bath. | $150,000 |
| Jul 13, 2015 | Completed final sign-off Aug 2015 | 2253 California St | removal of non-conforming bathroom & kitchen at existing 1st floor of 2253 calif. 1st floor area to be converted to legal storage use for unit 2253 calif. st. no exterior work, no structural or mechanical work. no change to square footage of bldg.Details
removal of non-conforming bathroom & kitchen at existing 1st floor of 2253 calif. 1st floor area to be converted to legal storage use for unit 2253 calif. st. no exterior work, no structural or mechanical work. no change to square footage of bldg. | $950 |
| Jul 9, 2015 | Completed final sign-off Feb 2016 | 102 Walnut St | alteration to exist ing condo, 102 walnut. 1st fl increase opening between dining and kitchen areas, new built ins, finishes, new lighting. 2nd/3rd fl bath remodel, new built ins, finishes, lightingDetails
alteration to exist ing condo, 102 walnut. 1st fl increase opening between dining and kitchen areas, new built ins, finishes, new lighting. 2nd/3rd fl bath remodel, new built ins, finishes, lighting | $45,000 |
| Jan 20, 2015 | Expired or cancelled cancelled Aug 2017 | 2104 Bryant St | remodel of (e) entry level kitchen & bath. horizontal addtion for living room. vertical addition for master bedroom, master bath, roof deck, storage & closet. maher ordinance (exempted) see letter attached.Details
remodel of (e) entry level kitchen & bath. horizontal addtion for living room. vertical addition for master bedroom, master bath, roof deck, storage & closet. maher ordinance (exempted) see letter attached. | $130,000 |
| Sep 23, 2014 | Completed final sign-off Dec 2014 | 125 Mateo St | bath remodel. demo we shower stall, tile, vanity. new shower pan, tile, vanity, plumbing fixtures. new elec fixtures. no walls or opening change. min 1 gen fixtures with high eff and aall lighting high eff or controlled by manual sensorDetails
bath remodel. demo we shower stall, tile, vanity. new shower pan, tile, vanity, plumbing fixtures. new elec fixtures. no walls or opening change. min 1 gen fixtures with high eff and aall lighting high eff or controlled by manual sensor | $30,000 |
| Sep 19, 2014 | Expired or cancelled expired Jul 2020 | 722 Hampshire St | scope of work includes reconfiguration of walls & structural excavation for new bedroom, access to garage, new bath & new entry. work will include construction of new architectural partition, new finishes, new electrical wiring & new plumbing fixtures.Details
scope of work includes reconfiguration of walls & structural excavation for new bedroom, access to garage, new bath & new entry. work will include construction of new architectural partition, new finishes, new electrical wiring & new plumbing fixtures. | $20,000 |
| Mar 14, 2014 | Expired or cancelled expired Aug 2017 | 783 12th Av | remodel (e) kitchen and relocate powder room on 2nd floor. remodel bathrooms and closets on 3rd floor.Details
remodel (e) kitchen and relocate powder room on 2nd floor. remodel bathrooms and closets on 3rd floor. | $65,000 |
| Feb 25, 2014 | Completed final sign-off Jan 2015 | 783 12th Av | partial demolition:selective removal of extg wall and ceiling wood trim plaster drywall in kitchen and bathroom areas. no demolition of structural components.Details
partial demolition:selective removal of extg wall and ceiling wood trim plaster drywall in kitchen and bathroom areas. no demolition of structural components. | $2,000 |
| Dec 10, 2013 | Completed final sign-off Jun 2014 | 102 Walnut St | interior remodel, kitchen , master bath, relocate laundry, new window sash, new powder room, new closet. for unit 102Details
interior remodel, kitchen , master bath, relocate laundry, new window sash, new powder room, new closet. for unit 102 | $100,000 |
| Aug 19, 2013 | Completed final sign-off Mar 2014 | 2 Mountain Spring Av | remodel & add bay windows to 2nd & 3rd floor bathrooms. replace siding on north elevation. replace (e) guard at 2nd floor deckDetails
remodel & add bay windows to 2nd & 3rd floor bathrooms. replace siding on north elevation. replace (e) guard at 2nd floor deck | $85,000 |
| May 13, 2013 | Never finaled issued May 2013, no final | 55 05th St | (1st floor): renovation of (e) restaurant , removal/upgrade doors, walls, ceilings & floors. new kitchen equipment, addition of one accessible unisex bath, one addioitnal bar.Details
(1st floor): renovation of (e) restaurant , removal/upgrade doors, walls, ceilings & floors. new kitchen equipment, addition of one accessible unisex bath, one addioitnal bar. | $850,000 |
| May 1, 2013 | Never finaled issued May 2013, no final | 2524 Pacheco St | remove (e) kitchen cabinets/fixtures, remove (e) bathrooms fixtures, remove (e) stucco in entry wayDetails
remove (e) kitchen cabinets/fixtures, remove (e) bathrooms fixtures, remove (e) stucco in entry way | $7,000 |
| Apr 2, 2013 | Never finaled issued May 2013, no final | 2524 Pacheco St | remodel extg kitchen and bathroom at 2nd floor, provide new deck/balcony at 2nd floor. remodel bathroom at 1st floor. removal of interior non conforming stair, relocate extg fan and water heater at 1st floor.Details
remodel extg kitchen and bathroom at 2nd floor, provide new deck/balcony at 2nd floor. remodel bathroom at 1st floor. removal of interior non conforming stair, relocate extg fan and water heater at 1st floor. | $160,000 |
| Sep 4, 2012 | Completed final sign-off Dec 2012 | 3670 19th St | renovation of existing flat, remodel kitchen and bath. additon of new full bath near bedroom. new fixtures & finishes throughoutDetails
renovation of existing flat, remodel kitchen and bath. additon of new full bath near bedroom. new fixtures & finishes throughout | $65,000 |
| Aug 27, 2012 | Completed final sign-off Nov 2012 | 1940 Webster St | revision to pa# 201111028149. renovate 3rd floor bathroom - relocate tub, toilet, new shower stall, new vent, fan, new lighting. renovate 1st floor bath tub to shower stall, new vent fan, new lighting. no structural workDetails
revision to pa# 201111028149. renovate 3rd floor bathroom - relocate tub, toilet, new shower stall, new vent, fan, new lighting. renovate 1st floor bath tub to shower stall, new vent fan, new lighting. no structural work | $12,500 |