Block 3788, lot 008
130 Townsend St
- City’s use
- Commercial Office
- Built
- 1900
- Stories
- 1
- Rooms
- 2 bathrooms
- Building
- 9,600 sq ft
- Lot
- 22,000 sq ft
- Zoning
- MUO
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
27 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 14, 2022 | Expired or cancelled cancelled Jan 2026 | 130 Townsend St | Build Group Inc. | vapor intrusion mitigation system.Details
vapor intrusion mitigation system. | $31,500 |
| Nov 14, 2022 | Expired or cancelled cancelled Jan 2026 | 130 Townsend St | Build Group Inc. | vapor intrusion mitigation system.Details
vapor intrusion mitigation system. | $31,500 |
| Aug 25, 2022 | Never finaled issued Sep 2022, no final | 130 Townsend St | Build Group Inc. | storm water control plans for bpa#2021/0204/4027-Details
storm water control plans for bpa#2021/0204/4027- | |
| Aug 25, 2022 | Never finaled issued Jan 2023, no final | 130 Townsend St | Build Group Inc. | storm water control plans for bpa#2021/0204/4023.Details
storm water control plans for bpa#2021/0204/4023. | |
| Jul 21, 2022 | Never finaled filed Jul 2022, never issued | 130 Townsend St | Build Group Inc. | temp lateral support to facilitate mass excavation at 130 townsend aka 50 stanford. soil nails and shotcrete facing. soldier piles, raker bracing, shotcrete facing. shoring soil nails, shotcrete, soldier piles will not extend beyond the project property lines, into city streets, or adjacent properDetails
temp lateral support to facilitate mass excavation at 130 townsend aka 50 stanford. soil nails and shotcrete facing. soldier piles, raker bracing, shotcrete facing. shoring soil nails, shotcrete, soldier piles will not extend beyond the project property lines, into city streets, or adjacent proper | $300,000 |
| Jul 21, 2022 | Never finaled filed Jul 2022, never issued | 130 Townsend St | Build Group Inc. | temp lateral support to facilitate mass excavation at 130 townsend. soil nails and shotcrete facing. soldier piles, raker bracing, and shotcrete facing. shoring soil nails, shotcrete, and soldier piles will not extend beyond the project property lines, into city streets, or adjacent propertiesDetails
temp lateral support to facilitate mass excavation at 130 townsend. soil nails and shotcrete facing. soldier piles, raker bracing, and shotcrete facing. shoring soil nails, shotcrete, and soldier piles will not extend beyond the project property lines, into city streets, or adjacent properties | $300,000 |
| Feb 4, 2021 | Never finaled filed Feb 2021, never issued | 130 Townsend St | construct a 6 story office building on the existing surface parking on the north side of the property (50 stanford)Details
construct a 6 story office building on the existing surface parking on the north side of the property (50 stanford) | $8,000,000 | |
| Feb 4, 2021 | Never finaled filed Feb 2021, never issued | 130 Townsend St | adaptive re-use of existing age eligible building in a historic district to retain existing facade & build a 5-story vertical addition, resulting in an office bldg w/ ground flr retail/restaurant use. the proposed office will be under theDetails
adaptive re-use of existing age eligible building in a historic district to retain existing facade & build a 5-story vertical addition, resulting in an office bldg w/ ground flr retail/restaurant use. the proposed office will be under the | $8,000,000 | |
| Jul 21, 2015 | Completed final sign-off Sep 2015 | 130 Townsend St | K & K Plumbing & Fire Protection Inc. | t.i. work to add one head for remodeling restaurant in enlarged take out room per nfpa-13. ref app#201503049990. compliance with maher ordinance no 155-13 not required.Details
t.i. work to add one head for remodeling restaurant in enlarged take out room per nfpa-13. ref app#201503049990. compliance with maher ordinance no 155-13 not required. | $500 |
| Jul 15, 2015 | Completed final sign-off Jul 2015 | 130 Townsend St | San Francisco Fire Protection | add 1 monitor module to monitor new ansul system.Details
add 1 monitor module to monitor new ansul system. | $1,500 |
| Jul 14, 2015 | Completed final sign-off Jul 2015 | 130 Townsend St | International Fire Equip | install ul 300 fire system. ref app#201503049990. n/a for the maher.Details
install ul 300 fire system. ref app#201503049990. n/a for the maher. | $2,500 |
| Apr 27, 2015 | Expired or cancelled cancelled Jan 2026 | 130 Townsend St | renovation of exhibition space to create new storage mezzanine and reconfigure storage and office space on ground floor. n/a maherDetails
renovation of exhibition space to create new storage mezzanine and reconfigure storage and office space on ground floor. n/a maher | $45,000 | |
| Mar 4, 2015 | Completed final sign-off Dec 2016 | 130 Townsend St | Vonnegut Thoreau Construction | restaurant renovation limited to the transformation of service space into small kitchen and the creation of new bar. no new lighting and no modification to the envelope. plumb & ele under seperate permit. maher - not req'dDetails
restaurant renovation limited to the transformation of service space into small kitchen and the creation of new bar. no new lighting and no modification to the envelope. plumb & ele under seperate permit. maher - not req'd | $95,000 |
| Apr 13, 2012 | Never finaled issued Apr 2012, no final | 130 Townsend St | for planning dept purposes only. establishment of a mobile food facility in the parking lot at the rear of the property with a vending space. of more than 300 sq ft. no work to be performed. no later than 10pm unless special event permit.Details
for planning dept purposes only. establishment of a mobile food facility in the parking lot at the rear of the property with a vending space. of more than 300 sq ft. no work to be performed. no later than 10pm unless special event permit. | ||
| Aug 1, 2006 | Completed final sign-off Aug 2006 | 130 Townsend St | Hasz Construction Inc | renewal of pa# 200501183376, 200505162517, 200510246314, 200510115166 for final inspection.Details
renewal of pa# 200501183376, 200505162517, 200510246314, 200510115166 for final inspection. | |
| Dec 22, 2005 | Completed final sign-off Aug 2006 | 130 Townsend St | Hasz Construction Inc | rev.appl#200505243339 revise site plan to show double doors at rear parking lot.Details
rev.appl#200505243339 revise site plan to show double doors at rear parking lot. | |
| Dec 15, 2005 | Completed final sign-off Jan 2006 | 130 Townsend St | J S J Electrical Display Corp | erect sign for electric, double faced.Details
erect sign for electric, double faced. | |
| Oct 24, 2005 | Expired or cancelled expired Aug 2006 | 130 Townsend St | San Francisco Fire Protection | to revise approved plan under pa# 2005/10/18/5823. new fire alarm for 130 townsend.Details
to revise approved plan under pa# 2005/10/18/5823. new fire alarm for 130 townsend. | $100 |
| Oct 18, 2005 | Completed final sign-off Aug 2006 | 130 Townsend St | San Francisco Fire Protection | install new fire alarm system, 11 horn strobes, 5 smoke dect, 2 pull stations.Details
install new fire alarm system, 11 horn strobes, 5 smoke dect, 2 pull stations. | $7,500 |
| Oct 11, 2005 | Expired or cancelled expired Aug 2006 | 130 Townsend St | Hasz Construction Inc | hook up fire suppression systemDetails
hook up fire suppression system | $1,500 |
| May 24, 2005 | Completed final sign-off Aug 2006 | 130 Townsend St | alterations to bldg. facade,interior t.i. including non-structural interior partitions,h.c.accessiblDetails
alterations to bldg. facade,interior t.i. including non-structural interior partitions,h.c.accessibl | $100,000 | |
| May 16, 2005 | Expired or cancelled expired Aug 2006 | 130 Townsend St | Emerald Plbg & Fire Protection | installation of new commercial fire sprinkler system. 25 headsDetails
installation of new commercial fire sprinkler system. 25 heads | $5,000 |
| Mar 18, 2005 | Never finaled issued Mar 2005, no final | 130 Townsend St | streetspaceDetails
streetspace | ||
| Jan 18, 2005 | Expired or cancelled expired Aug 2006 | 130 Townsend St | market improvement alterations to extg space work includes new non structural interior partitionsDetails
market improvement alterations to extg space work includes new non structural interior partitions | $40,000 | |
| Dec 13, 2004 | Never finaled issued Dec 2004, no final | 130 Townsend St | street spaceDetails
street space | ||
| Dec 9, 2004 | Expired or cancelled expired Jul 2006 | 130 Townsend St | interior non-structural demo only. ada/t-24, work to be done with t.i.Details
interior non-structural demo only. ada/t-24, work to be done with t.i. | $40,000 | |
| Jun 9, 2000 | Expired or cancelled expired Mar 2003 | 130 Townsend St | tenant improvement include conference room, office, enlarge kitchen,disable access toilet,partitionsDetails
tenant improvement include conference room, office, enlarge kitchen,disable access toilet,partitions | $51,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Build Group Inc. (6), Hasz Construction Inc (3), San Francisco Fire Protection (3), Emerald Plbg & Fire Protection, International Fire Equip, J S J Electrical Display Corp, K & K Plumbing & Fire Protection Inc., Vonnegut Thoreau Construction
- Architects
- Ahmad Mohazab (2), Michael Stanton (2), James Zack
- Engineers
- Jason White, Peter Chou
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.