David Peterson
- Listed as
- engineer
- Firm
- Watershape Consulting Inc.
- Based in
- Solana Beach
- On San Francisco permits
- Mar 2017 to Apr 2024
2 permits since 2000 (engineer on 2 permits): 1 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 22, 2024 | In progress issued Feb 2025 | 3355 Pacific Av | Fma Builders, Partners Contracting Inc. | revision to pa 202108236937. change media and gym rooms to new natatorium. expand scope of work to include new interior swimming pool, subterranean mechanical, electrical, and pool equipment vault beneath rear yard. no change to building exterior or conditioned area. add new fire sprinkler system thDetails
revision to pa 202108236937. change media and gym rooms to new natatorium. expand scope of work to include new interior swimming pool, subterranean mechanical, electrical, and pool equipment vault beneath rear yard. no change to building exterior or conditioned area. add new fire sprinkler system th | $850,000 |
| Mar 28, 2017 | Completed final sign-off Aug 2017 | 222 Stanyan St | Tricon Aquatics | replace swimming pool equipment. filter, pump, chemical feeders, chemical tanks, install new vfd drive, reverse osmosis system (tds) & ultra violet light uv system. all rerouting fire dept draft connection piping.Details
replace swimming pool equipment. filter, pump, chemical feeders, chemical tanks, install new vfd drive, reverse osmosis system (tds) & ultra violet light uv system. all rerouting fire dept draft connection piping. | $550,000 |