John Davis
- License
- C36687
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- David Design Development
- Based in
- San Francisco
- On San Francisco permits
- Apr 2018 to Feb 2026
4 permits since 2000 (architect on 4 permits): 2 completed, 1 in progress, 1 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- D V Rasmussen & Son Inc., Joseph D. Devito Construction, Kilrea Construction Inc.
- Engineers
- James Toby, Jason Powers
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 0
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 12, 2026 | In progress filed Feb 2026, not yet issued | 80 San Fernando Wy | D V Rasmussen & Son Inc. | new basement excavation & replace (e) foundation walls. rebuild main level sunroom, trellis & chemney in same location (like for like). re-frame & strenhthen roof framing. replace garage door. new exterior windows, doors in (e) locations, new exterior paint. new partitions. interior finishes,Details
new basement excavation & replace (e) foundation walls. rebuild main level sunroom, trellis & chemney in same location (like for like). re-frame & strenhthen roof framing. replace garage door. new exterior windows, doors in (e) locations, new exterior paint. new partitions. interior finishes, | $750,000 |
| Oct 16, 2019 | Never finaled filed Oct 2019, never issued | 286 02nd Av | addition to single family house, include expansion of 2nd floor area with new dormer to create a new bathroom & closet. no changes to building foot print or building height. ** maher: n/a **Details
addition to single family house, include expansion of 2nd floor area with new dormer to create a new bathroom & closet. no changes to building foot print or building height. ** maher: n/a ** | $45,000 | |
| May 17, 2019 | Completed final sign-off Nov 2019 | 131 Peru Av | Kilrea Construction Inc. | remodel (e) sfd. interior work only. no exterior work. reconfigure inter partitions, remodel kitchen and bathroom. new finishesDetails
remodel (e) sfd. interior work only. no exterior work. reconfigure inter partitions, remodel kitchen and bathroom. new finishes | $150,000 |
| Apr 11, 2018 | Completed final sign-off Jan 2019 | 146 San Pablo Av | Joseph D. Devito Construction | interior remodel of two bathrooms, including plumbing, electrical, minor framing & finishes. no structural work & no new floor areaDetails
interior remodel of two bathrooms, including plumbing, electrical, minor framing & finishes. no structural work & no new floor area | $71,500 |