Austen Diliberto
- License
- C26278
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Gelfand Partners Architects
- Based in
- San Francisco
- On San Francisco permits
- Oct 2024 to Aug 2026
8 permits since 2000 (architect on 8 permits): 2 completed, 6 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Nibbi Bros Assoc Inc. (3), Amone Corp, D & H Construction, D.F.P.F Corp Dba Fine Line Construction, International Waterproofing, Neu Haus Llc
- Engineers
- Antonio Jacksalem (3), Meng Hsiu Chen (3), Adam Azofeifa, James Toby, Patrick Jordan
Where they worked
- Single-family 1
- Multi-family (2-family, apartments) 5
- Commercial 2
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 8, 2026 | In progress filed Aug 2026, not yet issued | 2550 Filbert St | Neu Haus Llc | alteration & additions to (e) 3-story residence including renovation to ground, 1st, 2nd, 3rd fls w/new cantilevered bay window in kitchen & primary closet & bath. expansion of g/f & renovations to garage, living spaces, kitchen, bedrms, & baths, new attached jadu (unit3) & new windows & doors, hvacDetails
alteration & additions to (e) 3-story residence including renovation to ground, 1st, 2nd, 3rd fls w/new cantilevered bay window in kitchen & primary closet & bath. expansion of g/f & renovations to garage, living spaces, kitchen, bedrms, & baths, new attached jadu (unit3) & new windows & doors, hvac | $625,000 |
| Jul 17, 2026 | In progress issued Jul 2026 | 774 Tehama St | D.F.P.F Corp Dba Fine Line Construction | revision to pa# 202412307532: relocate toilet room from 1st floor to 2nd floor and add bathtub. lengthen kitchenette. no change in quantity of light fixtures.Details
revision to pa# 202412307532: relocate toilet room from 1st floor to 2nd floor and add bathtub. lengthen kitchenette. no change in quantity of light fixtures. | |
| Mar 12, 2026 | In progress issued Jul 2026 | 1601 Webster St | Nibbi Bros Assoc Inc. | ed-1301: accessible path of travel improvements, r/r (e) yard fencing within property, remove all fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing,Details
ed-1301: accessible path of travel improvements, r/r (e) yard fencing within property, remove all fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing, | $7,561,942 |
| Mar 12, 2026 | In progress issued Jul 2026 | 1901 Sutter St | Nibbi Bros Assoc Inc. | ed-1301: accessible path of travel improvements, r/r (e) yard fencing within property, remove all fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing,Details
ed-1301: accessible path of travel improvements, r/r (e) yard fencing within property, remove all fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing, | $5,747,076 |
| Mar 12, 2026 | In progress issued Jul 2026 | 1820 Post St | Nibbi Bros Assoc Inc. | ed13-01:accessible path of travel improvements throughout, r/r (e) yard fencing within property, remove fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing,Details
ed13-01:accessible path of travel improvements throughout, r/r (e) yard fencing within property, remove fire escapes, mulch all planting areas, restripe parking lot, provide code minimum accessible parking spaces, modify public sidewalk for accessibility at entrance gates, r/r all windows, roofing, | $7,561,942 |
| Mar 24, 2025 | In progress issued Dec 2025 | 1303 Larkin St | D & H Construction | mayoral ed13-01: add 5 units in (e) common spaces. reconfigure (e) units to provide 25% mobility units. provide casework, finishes, & fixtures as shown .provide windows in (e) opening and door hardware throughout. provide usps and accessible compliant mailboxes.Details
mayoral ed13-01: add 5 units in (e) common spaces. reconfigure (e) units to provide 25% mobility units. provide casework, finishes, & fixtures as shown .provide windows in (e) opening and door hardware throughout. provide usps and accessible compliant mailboxes. | $9,640,711 |
| Mar 3, 2025 | Completed final sign-off Sep 2025 | 1515 Vallejo St | Amone Corp | install pre-fabricated stair for pg&e access. fix one leaf door in closed position.Details
install pre-fabricated stair for pg&e access. fix one leaf door in closed position. | $15,000 |
| Oct 16, 2024 | Completed final sign-off Mar 2026 | 220 Golden Gate Av | International Waterproofing | install new security gate at leavenworth street office entrance.Details
install new security gate at leavenworth street office entrance. | $25,000 |