Permit GraphSan Francisco building permits since 2000

Amone Corp

Contractor license
743360
State license record
Based in
San Francisco
On San Francisco permits
Aug 2000 to Sep 2026
Last 24 months
30 permits filed

278 permits since 2000: 232 completed, 11 in progress, 22 never finaled, 13 expired or cancelled.

Of the 22 never-finaled permits, 1 is 3 to 5 years old, 9 are 5 to 10 years old, 12 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits (among their 100 most recent)

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Most recent permits

AllRoof deck 2Deck 8Stairs 26Kitchen remodel 32Bathroom remodel 29

Showing the 100 most recent of 278.

FiledOutcomeAddressWork described on the permitDeclared cost
Sep 30, 2026In progress
filed Sep 2026, not yet issued
534 Broadwayrevision to pa 202511069121 install pull box at west elevation
Details
Permit
202609308795
Status
filed
Filed
Sep 30, 2026
Address
534 Broadway

revision to pa 202511069121 install pull box at west elevation

Open the permit page

Sep 4, 2026In progress
filed Sep 2026, not yet issued
151 Joice Streplacement of all windows and sliding glass doors at residential floors 1 through 3. (building d)
Details
Permit
202609047725
Status
filed
Filed
Sep 4, 2026
Declared cost
$650,000
Address
151 Joice St

replacement of all windows and sliding glass doors at residential floors 1 through 3. (building d)

Open the permit page

$650,000
Aug 26, 2026In progress
issued Aug 2026
1290 Potrero Avconcrete slab on private walkway 4' x 4' x 1'. at rear, on grade. not a part of an accessible route or exit route.
Details
Permit
202608267250
Status
issued
Filed
Aug 26, 2026
Permit issued
Aug 26, 2026
Declared cost
$5,000
Address
1290 Potrero Av

concrete slab on private walkway 4' x 4' x 1'. at rear, on grade. not a part of an accessible route or exit route.

Open the permit page

$5,000
Aug 19, 2026In progress
filed Aug 2026, not yet issued
945 Sacramento Streplacement of all window and sliding glass doors at residential floors: building t- floors 2 through 12, buildings a & b - floors 1 through 4, building c & d: floors 1 through 3
Details
Permit
202608196853
Status
filed
Filed
Aug 19, 2026
Declared cost
$3,800,000
Address
945 Sacramento St

replacement of all window and sliding glass doors at residential floors: building t- floors 2 through 12, buildings a & b - floors 1 through 4, building c & d: floors 1 through 3

Open the permit page

$3,800,000
Aug 10, 2026In progress
filed Aug 2026, not yet issued
141 Leland Avremove (e) fence, pedestrian gate, vehicular gate, parking lighting. and provide new fence, pedestrian gate, vehicular gate, in place of (e), provide new post mounted, parking lighting, paving for pot and parking, underground infraestructure for future ev charger.
Details
Permit
202608106348
Status
filed
Filed
Aug 10, 2026
Declared cost
$35,000
Address
141 Leland Av

remove (e) fence, pedestrian gate, vehicular gate, parking lighting. and provide new fence, pedestrian gate, vehicular gate, in place of (e), provide new post mounted, parking lighting, paving for pot and parking, underground infraestructure for future ev charger.

Open the permit page

$35,000
Jun 24, 2026In progress
issued Aug 2026
1390 Noriega St1/f: interior tenant improvement to convert (e) office space to pharmacy on first floor. scope of work includes but not limited to interior demolition & new construction of partitions, ceilings, lighting, finishes, mep work. change exterior window to door, change storefront door to sliding door
Details
Permit
202606243794
Status
issued
Filed
Jun 24, 2026
Permit issued
Aug 3, 2026
Declared cost
$800,000
Address
1390 Noriega St

1/f: interior tenant improvement to convert (e) office space to pharmacy on first floor. scope of work includes but not limited to interior demolition & new construction of partitions, ceilings, lighting, finishes, mep work. change exterior window to door, change storefront door to sliding door

Open the permit page

$800,000
May 20, 2026Completed
final sign-off May 2026
1117 Market Stg/f and 2/f: revision to permit 202308033645. change to floor plan layout. no change to plumbing fixtures.
Details
Permit
202605201611
Status
complete
Filed
May 20, 2026
Permit issued
May 22, 2026
Final sign-off
May 28, 2026
Address
1117 Market St

g/f and 2/f: revision to permit 202308033645. change to floor plan layout. no change to plumbing fixtures.

Open the permit page

Mar 4, 2026Completed
final sign-off Mar 2026
1515 Vallejo Stto obtain final inspection for work approved under pa#: 202310058093. all work is complete.
Details
Permit
202603046945
Status
complete
Filed
Mar 4, 2026
Permit issued
Mar 4, 2026
Final sign-off
Mar 10, 2026
Address
1515 Vallejo St

to obtain final inspection for work approved under pa#: 202310058093. all work is complete.

Open the permit page

Mar 4, 2026Completed
final sign-off Mar 2026
1590 Broadwayto obtain final inspection for work approved under pa#: 202205174400. all work is complete.
Details
Permit
202603046942
Status
complete
Filed
Mar 4, 2026
Permit issued
Mar 4, 2026
Final sign-off
Mar 10, 2026
Address
1590 Broadway

to obtain final inspection for work approved under pa#: 202205174400. all work is complete.

Open the permit page

Feb 27, 2026Completed
final sign-off Mar 2026
3554 17th Stto obtain final inspection for work approved under pa#201709117613. all work is complete.
Details
Permit
202602276707
Status
complete
Filed
Feb 27, 2026
Permit issued
Mar 6, 2026
Final sign-off
Mar 23, 2026
Address
3554 17th St

to obtain final inspection for work approved under pa#201709117613. all work is complete.

Open the permit page

Nov 10, 2025Completed
final sign-off Apr 2026
1117 Market Stnew rooftop unit & 2 split fancoil system to replace removed existing heating systems. new exhaust fan. deferred pa#; 202308033645
Details
Permit
202511109299
Status
complete
Filed
Nov 10, 2025
Permit issued
Nov 14, 2025
Final sign-off
Apr 30, 2026
Declared cost
$75,000
Address
1117 Market St

new rooftop unit & 2 split fancoil system to replace removed existing heating systems. new exhaust fan. deferred pa#; 202308033645

Open the permit page

$75,000
Nov 6, 2025In progress
issued Dec 2025
534 Broadwayrelocate restrooms & laundry rm, replace finishes throughout, replace rehab windows, rehab units. final completiion only after pa#202503101910 final completion
Details
Permit
202511069121
Status
issued
Filed
Nov 6, 2025
Permit issued
Dec 18, 2025
Declared cost
$3,500,000
Address
534 Broadway

relocate restrooms & laundry rm, replace finishes throughout, replace rehab windows, rehab units. final completiion only after pa#202503101910 final completion

Open the permit page

$3,500,000
Oct 24, 2025In progress
issued Oct 2025
1649 Jerrold Avrepair exterior siding in-kind, damages from car collision, verify electric and gas meter safety, to comply with nov#202545249
Details
Permit
202510248094
Status
issued
Filed
Oct 24, 2025
Permit issued
Oct 24, 2025
Declared cost
$5,000
Address
1649 Jerrold Av

repair exterior siding in-kind, damages from car collision, verify electric and gas meter safety, to comply with nov#202545249

Open the permit page

$5,000
Sep 30, 2025Completed
final sign-off Jun 2026
141 Leland Avdry rot repair @ cafeteria inside group home facility. 1st floor of facility.
Details
Permit
202509306424
Status
complete
Filed
Sep 30, 2025
Permit issued
Sep 30, 2025
Final sign-off
Jun 3, 2026
Declared cost
$8,000
Address
141 Leland Av

dry rot repair @ cafeteria inside group home facility. 1st floor of facility.

Open the permit page

$8,000
Sep 16, 2025Completed
final sign-off Nov 2025
5630 Mission Stunit 324 & 224: dry rot repair at bay window 2nd & 3rd/f
Details
Permit
202509165416
Status
complete
Filed
Sep 16, 2025
Permit issued
Sep 16, 2025
Final sign-off
Nov 21, 2025
Declared cost
$10,000
Address
5630 Mission St

unit 324 & 224: dry rot repair at bay window 2nd & 3rd/f

Open the permit page

$10,000
Jul 30, 2025Completed
final sign-off Sep 2025
5630 Mission Stunits 108 & 122: shower repair, new shower head, tile, waterproofing, shower pan and water test. all in-kind work. only shower work.
Details
Permit
202507301929
Status
complete
Filed
Jul 30, 2025
Permit issued
Jul 30, 2025
Final sign-off
Sep 4, 2025
Declared cost
$10,000
Address
5630 Mission St

units 108 & 122: shower repair, new shower head, tile, waterproofing, shower pan and water test. all in-kind work. only shower work.

Open the permit page

$10,000
Jul 18, 2025Completed
final sign-off Nov 2025
657 Clay St2/f: voluntary seismic wall ties at 2/f lightwells.
Details
Permit
202507181104
Status
complete
Filed
Jul 18, 2025
Permit issued
Jul 18, 2025
Final sign-off
Nov 19, 2025
Declared cost
$45,000
Address
657 Clay St

2/f: voluntary seismic wall ties at 2/f lightwells.

Open the permit page

$45,000
Jul 17, 2025Completed
final sign-off Nov 2025
657 Clay Stsecond and third floor plan common bathroom ( room 205 & 303) revision to reflect existing conditions correctly as requestd by field inspector. revision to bpa#2024-0419-0348
Details
Permit
202507171019
Status
complete
Filed
Jul 17, 2025
Permit issued
Jul 18, 2025
Final sign-off
Nov 7, 2025
Address
657 Clay St

second and third floor plan common bathroom ( room 205 & 303) revision to reflect existing conditions correctly as requestd by field inspector. revision to bpa#2024-0419-0348

Open the permit page

Jul 14, 2025Completed
final sign-off Mar 2026
728 Pacific Av2/f: partial ti of existing medical exam room and supporting spaces. 3/f: partial ti to expand open office space and provide conference room and restrooms. new non-bearing partitions, new finishes.
Details
Permit
202507140704
Status
complete
Filed
Jul 14, 2025
Permit issued
Aug 8, 2025
Final sign-off
Mar 27, 2026
Declared cost
$1,260,912
Address
728 Pacific Av

2/f: partial ti of existing medical exam room and supporting spaces. 3/f: partial ti to expand open office space and provide conference room and restrooms. new non-bearing partitions, new finishes.

Open the permit page

$1,260,912
Jun 4, 2025Completed
final sign-off Nov 2025
585 Geary Strevision to pa 202406114202 basement interior work includes replacing flooring, plumbing fixtures and doors. additional work includes 2 (n) door openings, 1 (n) partition wall, 1 (n) cabinet, countertop & sink. mechanical work includes mini split heat pump unit, energy recover ventilator
Details
Permit
202506047866
Status
complete
Filed
Jun 4, 2025
Permit issued
Jul 30, 2025
Final sign-off
Nov 20, 2025
Declared cost
$196,400
Address
585 Geary St

revision to pa 202406114202 basement interior work includes replacing flooring, plumbing fixtures and doors. additional work includes 2 (n) door openings, 1 (n) partition wall, 1 (n) cabinet, countertop & sink. mechanical work includes mini split heat pump unit, energy recover ventilator

Open the permit page

$196,400
Mar 31, 2025Completed
final sign-off Nov 2025
657 Clay Stinterior unit entry door and door frame replace in kind per ca historical bldg code. the replaced door and frame will maintain the (e) door dimensions. the door and frame will be upgraded to be 20 minute fire rated, and new single motion lever and lock door hardware will be installed.
Details
Permit
202503313404
Status
complete
Filed
Mar 31, 2025
Permit issued
Apr 17, 2025
Final sign-off
Nov 19, 2025
Declared cost
$75,000
Address
657 Clay St

interior unit entry door and door frame replace in kind per ca historical bldg code. the replaced door and frame will maintain the (e) door dimensions. the door and frame will be upgraded to be 20 minute fire rated, and new single motion lever and lock door hardware will be installed.

Open the permit page

$75,000
Mar 26, 2025Completed
final sign-off Mar 2026
1590 Broadwaymain building - reference permit #202205174400. scope modified to install concrete beams under new proposed support columns. also include 2 exterior ramps and handrails along with deck between columns. work is only at main building.
Details
Permit
202503263040
Status
complete
Filed
Mar 26, 2025
Permit issued
May 8, 2025
Final sign-off
Mar 10, 2026
Declared cost
$60,000
Address
1590 Broadway

main building - reference permit #202205174400. scope modified to install concrete beams under new proposed support columns. also include 2 exterior ramps and handrails along with deck between columns. work is only at main building.

Open the permit page

$60,000
Mar 18, 2025Completed
final sign-off Apr 2025
195 Woolsey Strevision to 201910245432. add foundation along gridline 3 and revise detail along gridline 4.
Details
Permit
202503182428
Status
complete
Filed
Mar 18, 2025
Permit issued
Apr 17, 2025
Final sign-off
Apr 22, 2025
Declared cost
$10,000
Address
195 Woolsey St

revision to 201910245432. add foundation along gridline 3 and revise detail along gridline 4.

Open the permit page

$10,000
Mar 3, 2025Completed
final sign-off Sep 2025
1515 Vallejo Stinstall pre-fabricated stair for pg&e access. fix one leaf door in closed position.
Details
Permit
202503031408
Status
complete
Filed
Mar 3, 2025
Permit issued
Aug 26, 2025
Final sign-off
Sep 4, 2025
Declared cost
$15,000
Address
1515 Vallejo St

install pre-fabricated stair for pg&e access. fix one leaf door in closed position.

Open the permit page

$15,000
Feb 27, 2025In progress
filed Feb 2025, not yet issued
799 Pacific Avnew out door fence and gate(construction revision) per pa #202501077873. relocate of the proposed, fence away from the existing, pull down fire escape ladder. replacement of exterior doors with new exterior door and window; construction revision cost is $10,000.00
Details
Permit
202502271260
Status
filed
Filed
Feb 27, 2025
Declared cost
$10,000
Address
799 Pacific Av

new out door fence and gate(construction revision) per pa #202501077873. relocate of the proposed, fence away from the existing, pull down fire escape ladder. replacement of exterior doors with new exterior door and window; construction revision cost is $10,000.00

Open the permit page

$10,000
Feb 24, 2025Completed
final sign-off Nov 2025
657 Clay Strevision to pa 202404190348 to add wall ties to remaining half of 2nd fl. structural revision only
Details
Permit
202502240990
Status
complete
Filed
Feb 24, 2025
Permit issued
Apr 9, 2025
Final sign-off
Nov 19, 2025
Declared cost
$25,000
Address
657 Clay St

revision to pa 202404190348 to add wall ties to remaining half of 2nd fl. structural revision only

Open the permit page

$25,000
Feb 20, 2025In progress
issued Apr 2025
795 Pacific Avnew outdoor fence and gate @ playground behind the building of 795 pacific ave. not on property line
Details
Permit
202502200736
Status
issued
Filed
Feb 20, 2025
Permit issued
Apr 9, 2025
Declared cost
$15,000
Address
795 Pacific Av

new outdoor fence and gate @ playground behind the building of 795 pacific ave. not on property line

Open the permit page

$15,000
Jan 7, 2025In progress
issued Jan 2025
799 Pacific Avnew outdoor fence and gate.
Details
Permit
202501077873
Status
issued
Filed
Jan 7, 2025
Permit issued
Jan 15, 2025
Declared cost
$15,000
Address
799 Pacific Av

new outdoor fence and gate.

Open the permit page

$15,000
Dec 6, 2024Completed
final sign-off Jun 2025
1400 Noriega St2nd fl remodel reception desk, soffit, light & security gate
Details
Permit
202412066356
Status
complete
Filed
Dec 6, 2024
Permit issued
Feb 21, 2025
Final sign-off
Jun 27, 2025
Declared cost
$200,000
Address
1400 Noriega St

2nd fl remodel reception desk, soffit, light & security gate

Open the permit page

$200,000
Nov 12, 2024Completed
final sign-off Dec 2024
227 Bay St200 sq.ft. of concrete and rebar repair in deck slab of unit 109.
Details
Permit
202411124762
Status
complete
Filed
Nov 12, 2024
Permit issued
Nov 21, 2024
Final sign-off
Dec 9, 2024
Declared cost
$25,000
Address
227 Bay St

200 sq.ft. of concrete and rebar repair in deck slab of unit 109.

Open the permit page

$25,000
Jun 25, 2024Completed
final sign-off Nov 2025
585 Geary St100% affordable housing:interior work:renovations to mep, fixtures,& arch finishes.interior work is modernization to the units & shared common areas.interior scope to the units includes(n)cabinetry,countertops,appliances & replacing plumb fixtures.
Details
Permit
202406114202
Status
complete
Filed
Jun 25, 2024
Permit issued
Jan 3, 2025
Final sign-off
Nov 20, 2025
Declared cost
$2,500,000
Address
585 Geary St

100% affordable housing:interior work:renovations to mep, fixtures,& arch finishes.interior work is modernization to the units & shared common areas.interior scope to the units includes(n)cabinetry,countertops,appliances & replacing plumb fixtures.

Open the permit page

$2,500,000
May 14, 2024Completed
final sign-off Aug 2025
585 Geary Strepair and normal maintenance for in kind replacement in all units. includes window painting at front facade in and kind window replacement at rear,east,and west elevation.not visiable from street. scope includes new flooring,interior painting, and interior volutary signage.
Details
Permit
202405142062
Status
complete
Filed
May 14, 2024
Permit issued
Jun 12, 2024
Final sign-off
Aug 12, 2025
Declared cost
$355,000
Address
585 Geary St

repair and normal maintenance for in kind replacement in all units. includes window painting at front facade in and kind window replacement at rear,east,and west elevation.not visiable from street. scope includes new flooring,interior painting, and interior volutary signage.

Open the permit page

$355,000
Apr 19, 2024Completed
final sign-off Nov 2025
657 Clay Stscope:repair & normal maintenance for in kind replacement of appliances & finishes, providing a utility sink, insulating extg hot water laterals, mech. repairs & hallway ventilation, in kind lighting fixutres & receptacles, new flooring, interior painting, in kind window replacement,
Details
Permit
202404190348
Status
complete
Filed
Apr 19, 2024
Permit issued
Jul 1, 2024
Final sign-off
Nov 24, 2025
Declared cost
$2,500,000
Address
657 Clay St

scope:repair & normal maintenance for in kind replacement of appliances & finishes, providing a utility sink, insulating extg hot water laterals, mech. repairs & hallway ventilation, in kind lighting fixutres & receptacles, new flooring, interior painting, in kind window replacement,

Open the permit page

$2,500,000
Apr 9, 2024Completed
final sign-off Sep 2024
665 Clay Stto obtain final inspection for work approved under pa# 200501274099
Details
Permit
202404099636
Status
complete
Filed
Apr 9, 2024
Permit issued
Apr 9, 2024
Final sign-off
Sep 10, 2024
Address
665 Clay St

to obtain final inspection for work approved under pa# 200501274099

Open the permit page

Mar 29, 2024Completed
final sign-off Jul 2024
2323 Sacramento Stab-017 interior demo only. nonstructural walls, doors, and frames. electrical and plumbing fixtures
Details
Permit
202403298949
Status
complete
Filed
Mar 29, 2024
Permit issued
May 3, 2024
Final sign-off
Jul 31, 2024
Declared cost
$30,000
Address
2323 Sacramento St

ab-017 interior demo only. nonstructural walls, doors, and frames. electrical and plumbing fixtures

Open the permit page

$30,000
Feb 14, 2024Completed
final sign-off May 2024
1441 Ocean Av7yrevision pa# 2023-1101-9923 new location of sink & cabinets in exam rooms 1,2,3 & 6. new sliding door at exam rooms 1,2,3 & 4. new location of proposed electrical switch and outlets at exam rooms 1,2,3 & 4
Details
Permit
202402145911
Status
complete
Filed
Feb 14, 2024
Permit issued
Feb 28, 2024
Final sign-off
May 29, 2024
Address
1441 Ocean Av

7yrevision pa# 2023-1101-9923 new location of sink & cabinets in exam rooms 1,2,3 & 6. new sliding door at exam rooms 1,2,3 & 4. new location of proposed electrical switch and outlets at exam rooms 1,2,3 & 4

Open the permit page

Jan 5, 2024Completed
final sign-off Apr 2024
1040 Fillmore Stunit 501 only: replacement of (1) kitchen cabinets and plumbing fixtures. (2) bathroom fixtures in kind, same locations.
Details
Permit
202401053544
Status
complete
Filed
Jan 5, 2024
Permit issued
Jan 5, 2024
Final sign-off
Apr 17, 2024
Declared cost
$40,000
Address
1040 Fillmore St

unit 501 only: replacement of (1) kitchen cabinets and plumbing fixtures. (2) bathroom fixtures in kind, same locations.

Open the permit page

$40,000
Dec 14, 2023Completed
final sign-off May 2024
1536 Wallace Avdemo interior unpermitted wall, ceiling, stair, mezzanine. exit sign at warehouse. new wall infill, exhaust fan on roof, ext door replacement. comply with planning enforcement case number 2023010331-enf, bid 202315170
Details
Permit
202312142531
Status
complete
Filed
Dec 14, 2023
Permit issued
Apr 5, 2024
Final sign-off
May 7, 2024
Declared cost
$8,000
Address
1536 Wallace Av

demo interior unpermitted wall, ceiling, stair, mezzanine. exit sign at warehouse. new wall infill, exhaust fan on roof, ext door replacement. comply with planning enforcement case number 2023010331-enf, bid 202315170

Open the permit page

$8,000
Dec 6, 2023Completed
final sign-off Aug 2024
665 Clay Strevision to pa# 201910255615, changes ae: installation of tie beam to ground floor along commerical st, new concrete columns need to extend down about 20" more, relocation of auxiliary support steel column to align w/ pilaster below.
Details
Permit
202312062048
Status
complete
Filed
Dec 6, 2023
Permit issued
Feb 22, 2024
Final sign-off
Aug 20, 2024
Declared cost
$10,000
Address
665 Clay St

revision to pa# 201910255615, changes ae: installation of tie beam to ground floor along commerical st, new concrete columns need to extend down about 20" more, relocation of auxiliary support steel column to align w/ pilaster below.

Open the permit page

$10,000
Nov 1, 2023Completed
final sign-off May 2024
1441 Ocean Avconversion of (e) waiting area and office for 2 new acupuncture rooms. remodeling of 2 (e) acupuncture rooms. remodeling of (e) office-area of works: 638 sf.
Details
Permit
202311019923
Status
complete
Filed
Nov 1, 2023
Permit issued
Dec 29, 2023
Final sign-off
May 29, 2024
Declared cost
$160,000
Address
1441 Ocean Av

conversion of (e) waiting area and office for 2 new acupuncture rooms. remodeling of 2 (e) acupuncture rooms. remodeling of (e) office-area of works: 638 sf.

Open the permit page

$160,000
Oct 5, 2023Expired or cancelled
expired Mar 2026
1515 Vallejo Stremove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 7 repairs.
Details
Permit
202310058093
Status
expired
Filed
Oct 5, 2023
Permit issued
Nov 22, 2023
Declared cost
$13,000
Address
1515 Vallejo St

remove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 7 repairs.

Open the permit page

$13,000
Oct 5, 2023Completed
final sign-off Mar 2026
1590 Broadwayremove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 29 replacements, 1 repair.
Details
Permit
202310058100
Status
complete
Filed
Oct 5, 2023
Permit issued
Nov 22, 2023
Final sign-off
Mar 26, 2026
Declared cost
$300,000
Address
1590 Broadway

remove windows storefronts at e openings as noted on plans and replace in-kind. repair e windows as noted. 29 replacements, 1 repair.

Open the permit page

$300,000
Aug 3, 2023Completed
final sign-off May 2026
1117 Market Stg/f & 2/f: new office partitions, ceiling, lighting, power/data, casework, signage, toilet accessories, interior stair, interior windows
Details
Permit
202308033645
Status
complete
Filed
Aug 3, 2023
Permit issued
Jul 9, 2025
Final sign-off
May 28, 2026
Declared cost
$1,371,959
Address
1117 Market St

g/f & 2/f: new office partitions, ceiling, lighting, power/data, casework, signage, toilet accessories, interior stair, interior windows

Open the permit page

$1,371,959
Jul 5, 2023Completed
final sign-off Nov 2023
3386 21st Stto comply with the abe program #2023-0705-7732 accessible business entrance program per ordinance 51-16 remove entry gate at 3386 21stst. install new gate with door operator for accessiblity install door operator on ground fl. entry door for accessibility
Details
Permit
202307051511
Status
complete
Filed
Jul 5, 2023
Permit issued
Aug 28, 2023
Final sign-off
Nov 3, 2023
Declared cost
$45,000
Address
3386 21st St

to comply with the abe program #2023-0705-7732 accessible business entrance program per ordinance 51-16 remove entry gate at 3386 21stst. install new gate with door operator for accessiblity install door operator on ground fl. entry door for accessibility

Open the permit page

$45,000
Jun 29, 2023Completed
final sign-off Mar 2024
1005 Powell Stadd a residential laundry room, adjacent to lounge, for sro tenants of the building on the upper floors of the 5-story building. lounge was permitted under pa# 202204142240.
Details
Permit
202306291187
Status
complete
Filed
Jun 29, 2023
Permit issued
Jul 6, 2023
Final sign-off
Mar 15, 2024
Declared cost
$129,500
Address
1005 Powell St

add a residential laundry room, adjacent to lounge, for sro tenants of the building on the upper floors of the 5-story building. lounge was permitted under pa# 202204142240.

Open the permit page

$129,500
Jun 29, 2023Completed
final sign-off Mar 2024
1001 Powell Stowner improvement of 1001 powell includes replacing e restroom with accessible single occupancy restroom,replacement of wall and floor finishes,replacement e light fixtures,power at laundromat,mech rm, storage. accessible entrance provided under 202202228422
Details
Permit
202306291191
Status
complete
Filed
Jun 29, 2023
Permit issued
Jul 6, 2023
Final sign-off
Mar 15, 2024
Declared cost
$170,000
Address
1001 Powell St

owner improvement of 1001 powell includes replacing e restroom with accessible single occupancy restroom,replacement of wall and floor finishes,replacement e light fixtures,power at laundromat,mech rm, storage. accessible entrance provided under 202202228422

Open the permit page

$170,000
May 25, 2023Completed
final sign-off Sep 2023
363 Noe Stinstall fence and motorized vehicle gate at rear parking lot in rear of building inside the property line. no work in prow. no changes to fixrure count.
Details
Permit
202305258637
Status
complete
Filed
May 25, 2023
Permit issued
Jun 26, 2023
Final sign-off
Sep 12, 2023
Declared cost
$10,000
Address
363 Noe St

install fence and motorized vehicle gate at rear parking lot in rear of building inside the property line. no work in prow. no changes to fixrure count.

Open the permit page

$10,000
May 18, 2023Completed
final sign-off Apr 2026
1117 Market Ststructural work only: re-supporting the rear 2nd floor, other works are under separate permit: accessibility upgrade, t.i., new stair from ground floor to 2/f floor, accessible upgrades- toilet rooms (under sep permits)
Details
Permit
202305188055
Status
complete
Filed
May 18, 2023
Permit issued
Jul 11, 2025
Final sign-off
Apr 30, 2026
Declared cost
$304,662
Address
1117 Market St

structural work only: re-supporting the rear 2nd floor, other works are under separate permit: accessibility upgrade, t.i., new stair from ground floor to 2/f floor, accessible upgrades- toilet rooms (under sep permits)

Open the permit page

$304,662
Apr 14, 2023Completed
final sign-off Dec 2023
728 Pacific Avtenant improvement for e medical office suite 608
Details
Permit
202304145754
Status
complete
Filed
Apr 14, 2023
Permit issued
Jun 13, 2023
Final sign-off
Dec 11, 2023
Declared cost
$221,488
Address
728 Pacific Av

tenant improvement for e medical office suite 608

Open the permit page

$221,488
Mar 10, 2023Completed
final sign-off Dec 2023
937 Clay Strev to pa# 202109309577, 1 of the bedrooms in unit 250 @ ground lvl converted to trash room. the bedroom unit will become a 1 bedrm unit.property manager office will be relocated from the 2nd flr to the former study of unit 250 and a single occup restrm will be added. ramp will be modified @ 250
Details
Permit
202303103487
Status
complete
Filed
Mar 10, 2023
Permit issued
Apr 3, 2023
Final sign-off
Dec 1, 2023
Declared cost
$40,000
Address
937 Clay St

rev to pa# 202109309577, 1 of the bedrooms in unit 250 @ ground lvl converted to trash room. the bedroom unit will become a 1 bedrm unit.property manager office will be relocated from the 2nd flr to the former study of unit 250 and a single occup restrm will be added. ramp will be modified @ 250

Open the permit page

$40,000
Feb 22, 2023Never finaled
issued Feb 2023, no final
1019 Clement Stto obtain final inspection for work approved under pa# 201801269681. all work is complete.
Details
Permit
202302222410
Status
issued
Filed
Feb 22, 2023
Permit issued
Feb 22, 2023
Address
1019 Clement St

to obtain final inspection for work approved under pa# 201801269681. all work is complete.

Open the permit page

Feb 9, 2023Completed
final sign-off Mar 2024
1003 Powell Stt.i., replace (e) restroom w/accessible single occ restroom, replace wall/floor finishes, (e) light fixtures, power, reinstall tenant plumb fixtures & washing machine. abe under bpa#202204142240
Details
Permit
202302091674
Status
complete
Filed
Feb 9, 2023
Permit issued
Feb 17, 2023
Final sign-off
Mar 11, 2024
Declared cost
$18,000
Address
1003 Powell St

t.i., replace (e) restroom w/accessible single occ restroom, replace wall/floor finishes, (e) light fixtures, power, reinstall tenant plumb fixtures & washing machine. abe under bpa#202204142240

Open the permit page

$18,000
Dec 21, 2022Completed
final sign-off Dec 2023
937 Clay Stscope of work include conversion of sro unit 223, 323, and 425 to community kitchen for tenant use. planned improvements incldue using salavaged sst sinks from existing kitchens, adding a sst counter top with two electric cook tops and range hoods. mep scope include providing plumbing and exhaust,
Details
Permit
202212218894
Status
complete
Filed
Dec 21, 2022
Permit issued
Jan 6, 2023
Final sign-off
Dec 1, 2023
Declared cost
$120,000
Address
937 Clay St

scope of work include conversion of sro unit 223, 323, and 425 to community kitchen for tenant use. planned improvements incldue using salavaged sst sinks from existing kitchens, adding a sst counter top with two electric cook tops and range hoods. mep scope include providing plumbing and exhaust,

Open the permit page

$120,000
Dec 9, 2022Completed
final sign-off Dec 2022
615 Grant Avrevision to permit 202208150517. remove (2) wall on the 3/f server room.
Details
Permit
202212098019
Status
complete
Filed
Dec 9, 2022
Permit issued
Dec 9, 2022
Final sign-off
Dec 19, 2022
Address
615 Grant Av

revision to permit 202208150517. remove (2) wall on the 3/f server room.

Open the permit page

Nov 7, 2022Completed
final sign-off Mar 2026
1515 Vallejo Stnorth wing: provide ten steel diaphragm strengthening frames at (e)skylight opening above g/f. all work to occur on interior side of skylight above vacant commercial space & boiler room. provide steel brackets at each of the two (e) bridges that connect the north wing to the main bldg.
Details
Permit
202211075973
Status
complete
Filed
Nov 7, 2022
Permit issued
Apr 17, 2023
Final sign-off
Mar 26, 2026
Declared cost
$106,000
Address
1515 Vallejo St

north wing: provide ten steel diaphragm strengthening frames at (e)skylight opening above g/f. all work to occur on interior side of skylight above vacant commercial space & boiler room. provide steel brackets at each of the two (e) bridges that connect the north wing to the main bldg.

Open the permit page

$106,000
Oct 13, 2022Completed
final sign-off Mar 2024
1005 Powell Stpartial replacement of footings to correct conditions found during construction under permit #202204142240
Details
Permit
202210134313
Status
complete
Filed
Oct 13, 2022
Permit issued
Oct 14, 2022
Final sign-off
Mar 11, 2024
Declared cost
$10,000
Address
1005 Powell St

partial replacement of footings to correct conditions found during construction under permit #202204142240

Open the permit page

$10,000
Sep 30, 2022Completed
final sign-off Feb 2025
2820 16th Stnew t.i. build out offices in existing warm shell space. work includes new offices, open meeting rooms and kitchenete area. existing space has approved ada restrooms and hvac.
Details
Permit
202209303568
Status
complete
Filed
Sep 30, 2022
Permit issued
Nov 3, 2023
Final sign-off
Feb 3, 2025
Declared cost
$264,600
Address
2820 16th St

new t.i. build out offices in existing warm shell space. work includes new offices, open meeting rooms and kitchenete area. existing space has approved ada restrooms and hvac.

Open the permit page

$264,600
Sep 12, 2022Completed
final sign-off Oct 2022
1201 Powell Stto obtain final inspection for work approved under pa# 202002255287. all work is complete.
Details
Permit
202209122226
Status
complete
Filed
Sep 12, 2022
Permit issued
Sep 12, 2022
Final sign-off
Oct 3, 2022
Address
1201 Powell St

to obtain final inspection for work approved under pa# 202002255287. all work is complete.

Open the permit page

Aug 29, 2022Completed
final sign-off Dec 2024
683 Florida Stg/f: creating a multi-purpose space with a recording studio, dance rehearsal space, a kitchen and maker's space on ground floor of the base building. signage design will be under separate permit shown here for reference only.
Details
Permit
202208291528
Status
complete
Filed
Aug 29, 2022
Permit issued
Jul 31, 2023
Final sign-off
Dec 10, 2024
Declared cost
$1,750,000
Address
683 Florida St

g/f: creating a multi-purpose space with a recording studio, dance rehearsal space, a kitchen and maker's space on ground floor of the base building. signage design will be under separate permit shown here for reference only.

Open the permit page

$1,750,000
Aug 15, 2022Completed
final sign-off Dec 2022
615 Grant Avoffice space t.i, new finishes, doors, walls, provide accessible sink & counter @ 4th fl. breakroom & 3rd fl. server room. kitchenette for employee self-use only. no outside catering will be provided.
Details
Permit
202208150517
Status
complete
Filed
Aug 15, 2022
Permit issued
Nov 16, 2022
Final sign-off
Dec 19, 2022
Declared cost
$178,000
Address
615 Grant Av

office space t.i, new finishes, doors, walls, provide accessible sink & counter @ 4th fl. breakroom & 3rd fl. server room. kitchenette for employee self-use only. no outside catering will be provided.

Open the permit page

$178,000
Jul 14, 2022Completed
final sign-off Feb 2024
1005 Powell Streplace dry rot wood sleeper in dirt with non-structural concrete slab on grade. structure work under permit #202202228422 600 sq ft.
Details
Permit
202207148505
Status
complete
Filed
Jul 14, 2022
Permit issued
Jul 14, 2022
Final sign-off
Feb 20, 2024
Declared cost
$5,000
Address
1005 Powell St

replace dry rot wood sleeper in dirt with non-structural concrete slab on grade. structure work under permit #202202228422 600 sq ft.

Open the permit page

$5,000
Jun 14, 2022Completed
final sign-off Jan 2024
1590 Broadwayreplace (e) kitchen and counter top in 21 acessible units to meet hud requirements . interior only
Details
Permit
202206146320
Status
complete
Filed
Jun 14, 2022
Permit issued
Aug 1, 2022
Final sign-off
Jan 16, 2024
Declared cost
$168,000
Address
1590 Broadway

replace (e) kitchen and counter top in 21 acessible units to meet hud requirements . interior only

Open the permit page

$168,000
May 18, 2022Completed
final sign-off May 2022
385 Eddy Streduction of scope for 201905029560. removal of fsd on level 2, 3, 4, 5 & 6. total of 2 fsd's removald on each floor/level.
Details
Permit
202205184499
Status
complete
Filed
May 18, 2022
Permit issued
May 20, 2022
Final sign-off
May 26, 2022
Address
385 Eddy St

reduction of scope for 201905029560. removal of fsd on level 2, 3, 4, 5 & 6. total of 2 fsd's removald on each floor/level.

Open the permit page

May 17, 2022Expired or cancelled
expired Mar 2026
1590 Broadway100% affordable housing. main bldg: install new concrete foundation at new steel columns at rear of bldg. provide new concrete walkway and flat work at west courtyard. provide new handrail at (e) ramp. provide steel brackets at each of the two (e) bridges that connect the north wing to the main bldg
Details
Permit
202205174400
Status
expired
Filed
May 17, 2022
Permit issued
Apr 17, 2023
Declared cost
$200,000
Address
1590 Broadway

100% affordable housing. main bldg: install new concrete foundation at new steel columns at rear of bldg. provide new concrete walkway and flat work at west courtyard. provide new handrail at (e) ramp. provide steel brackets at each of the two (e) bridges that connect the north wing to the main bldg

Open the permit page

$200,000
May 3, 2022Completed
final sign-off Sep 2023
363 Noe Stdeferred submittal for approved bpa #202107094047. parking lot renovation for 21 unit public housing apt. 1 van accessible parking spot in rear of bldg, including platform lift for accessible path of travel to main level of bldg. no work in public right away.
Details
Permit
202205033493
Status
complete
Filed
May 3, 2022
Permit issued
Jul 14, 2022
Final sign-off
Sep 14, 2023
Declared cost
$25,000
Address
363 Noe St

deferred submittal for approved bpa #202107094047. parking lot renovation for 21 unit public housing apt. 1 van accessible parking spot in rear of bldg, including platform lift for accessible path of travel to main level of bldg. no work in public right away.

Open the permit page

$25,000
Apr 14, 2022Completed
final sign-off Mar 2024
1005 Powell Stto comply with nov#201803424.replace entries.former residential lobby will become sro manager office.reconfigure entry.warp sidewalk to provide landing.add ramp in the office for accessibility.modify(e)storage areas to a trash room, lounge & restroom.mep improvements.infill vault&cover at sidewalk
Details
Permit
202204142240
Status
complete
Filed
Apr 14, 2022
Permit issued
Oct 13, 2022
Final sign-off
Mar 15, 2024
Declared cost
$150,000
Address
1005 Powell St

to comply with nov#201803424.replace entries.former residential lobby will become sro manager office.reconfigure entry.warp sidewalk to provide landing.add ramp in the office for accessibility.modify(e)storage areas to a trash room, lounge & restroom.mep improvements.infill vault&cover at sidewalk

Open the permit page

$150,000
Feb 25, 2022Completed
final sign-off Mar 2024
1001 Powell Str/r finishes,fixtures,equipment and mep upgrades at units of the 4 sro levels of 1005 powell. door openings at the unit entires are widened to 36in.(e) wdws at fire escapes are replaced with doors.wdws replace with alum-clad wdw at powell and clay st elevations. and vinyl windows
Details
Permit
202202258773
Status
complete
Filed
Feb 25, 2022
Permit issued
Apr 29, 2022
Final sign-off
Mar 13, 2024
Declared cost
$1,500,000
Address
1001 Powell St

r/r finishes,fixtures,equipment and mep upgrades at units of the 4 sro levels of 1005 powell. door openings at the unit entires are widened to 36in.(e) wdws at fire escapes are replaced with doors.wdws replace with alum-clad wdw at powell and clay st elevations. and vinyl windows

Open the permit page

$1,500,000
Feb 22, 2022Completed
final sign-off Mar 2024
1005 Powell Ststructural work mandatory soft story retrofit using cebc appendix ch a4 and associated accessibility alterations. accessibility improvments include replacement of entry door and side lite at e laundromat. automatic door operators added to the laundromat entrace and at the existing salon door entranc
Details
Permit
202202228422
Status
complete
Filed
Feb 22, 2022
Permit issued
Apr 29, 2022
Final sign-off
Mar 11, 2024
Declared cost
$175,000
Address
1005 Powell St

structural work mandatory soft story retrofit using cebc appendix ch a4 and associated accessibility alterations. accessibility improvments include replacement of entry door and side lite at e laundromat. automatic door operators added to the laundromat entrace and at the existing salon door entranc

Open the permit page

$175,000
Feb 3, 2022Completed
final sign-off Apr 2022
2200 Van Ness Avrevision to permit #202001303133. provide window in extg window opening. provide handrails at extg entrance.
Details
Permit
202202037300
Status
complete
Filed
Feb 3, 2022
Permit issued
Feb 4, 2022
Final sign-off
Apr 8, 2022
Address
2200 Van Ness Av

revision to permit #202001303133. provide window in extg window opening. provide handrails at extg entrance.

Open the permit page

Jan 28, 2022Completed
final sign-off Jun 2022
728 Pacific Avsuite 115: revision to permit 202108045808. update layout.
Details
Permit
202201286887
Status
complete
Filed
Jan 28, 2022
Permit issued
Feb 18, 2022
Final sign-off
Jun 17, 2022
Declared cost
$10,000
Address
728 Pacific Av

suite 115: revision to permit 202108045808. update layout.

Open the permit page

$10,000
Jan 14, 2022Completed
final sign-off Apr 2022
671 China Basin Strecalculation of occupancy load to allow retention of (e) as built door/swing. permit 2021-0214-4828 revision. original exterior paly area (58) . proposed occupancy (47) based on deletion of fixed yard structures/storage.
Details
Permit
202201146068
Status
complete
Filed
Jan 14, 2022
Permit issued
Mar 10, 2022
Final sign-off
Apr 7, 2022
Address
671 China Basin St

recalculation of occupancy load to allow retention of (e) as built door/swing. permit 2021-0214-4828 revision. original exterior paly area (58) . proposed occupancy (47) based on deletion of fixed yard structures/storage.

Open the permit page

Dec 29, 2021Completed
final sign-off Mar 2024
1005 Powell Stcommon space improvements include replacement or repair of finishes, fixtures, equipment and mep upgrades at community kitchens, bathrooms and corridors of the 4 sro residential levels of 1005 powell. 1 of the bathrooms will be made semi-accessible at each level. doors at the bathrooms and ktchens
Details
Permit
202112295154
Status
complete
Filed
Dec 29, 2021
Permit issued
Feb 10, 2022
Final sign-off
Mar 14, 2024
Declared cost
$475,000
Address
1005 Powell St

common space improvements include replacement or repair of finishes, fixtures, equipment and mep upgrades at community kitchens, bathrooms and corridors of the 4 sro residential levels of 1005 powell. 1 of the bathrooms will be made semi-accessible at each level. doors at the bathrooms and ktchens

Open the permit page

$475,000
Dec 22, 2021Completed
final sign-off May 2022
385 Eddy Strevision to permit 201905029560: added rear improvements by adding a deck (30" max.) above (e) grade and fence and replacing (e) door with accessible in-kind door.
Details
Permit
202112224880
Status
complete
Filed
Dec 22, 2021
Permit issued
Mar 11, 2022
Final sign-off
May 26, 2022
Declared cost
$55,000
Address
385 Eddy St

revision to permit 201905029560: added rear improvements by adding a deck (30" max.) above (e) grade and fence and replacing (e) door with accessible in-kind door.

Open the permit page

$55,000
Nov 9, 2021Completed
final sign-off Oct 2023
255 Shotwell Strevision to pa# 202009103857. revised shared restroom. shared bathroom between tenant spaces deleted, new single stall restroom for tenant a only. expanded storage sq. ft.
Details
Permit
202111092113
Status
complete
Filed
Nov 9, 2021
Permit issued
Aug 4, 2022
Final sign-off
Oct 25, 2023
Address
255 Shotwell St

revision to pa# 202009103857. revised shared restroom. shared bathroom between tenant spaces deleted, new single stall restroom for tenant a only. expanded storage sq. ft.

Open the permit page

Nov 5, 2021Completed
final sign-off Oct 2022
1201 Powell Stres'l units not in scope. provide a new accessible all gender restrm to comm'l retail space on gr fl; new all gender restrm includes (n) door, frameand hardware, (n) paint, flooring, toilet, lavatory, bath accessories, efficient lighting, gfci rated outlets. (n) storage shelving. no addition and no
Details
Permit
202111051906
Status
complete
Filed
Nov 5, 2021
Permit issued
Dec 7, 2021
Final sign-off
Oct 3, 2022
Declared cost
$20,000
Address
1201 Powell St

res'l units not in scope. provide a new accessible all gender restrm to comm'l retail space on gr fl; new all gender restrm includes (n) door, frameand hardware, (n) paint, flooring, toilet, lavatory, bath accessories, efficient lighting, gfci rated outlets. (n) storage shelving. no addition and no

Open the permit page

$20,000
Sep 30, 2021Completed
final sign-off Nov 2023
937 Clay Stadd waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferred
Details
Permit
202109309577
Status
complete
Filed
Sep 30, 2021
Permit issued
Mar 1, 2022
Final sign-off
Nov 30, 2023
Declared cost
$400,000
Address
937 Clay St

add waste/recycling chute sys & trash rm within the bldg, reconfig of kitchens incl instal new exhaust sys, repl of hoods & sinks. 1 of bedrooms in #250@grd lvl will be conveted into trash room. the 2 bedroom will be one bedroom unit. 2 new comm units @ 2nd/3rd floors. sprinkler/fire alarm deferred

Open the permit page

$400,000
Aug 10, 2021Completed
final sign-off Jun 2023
1365 Eddy Stmayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1357 0748/016b,1361 0748/016a,1353 0748/016c
Details
Permit
202108106117
Status
complete
Filed
Aug 10, 2021
Permit issued
Feb 16, 2022
Final sign-off
Jun 23, 2023
Declared cost
$925,000
Address
1365 Eddy St

mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1357 0748/016b,1361 0748/016a,1353 0748/016c

Open the permit page

$925,000
Aug 10, 2021Completed
final sign-off Jun 2023
1353 Eddy Stmayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1361 0748/016a,1357 0748/016b
Details
Permit
202108106115
Status
complete
Filed
Aug 10, 2021
Permit issued
Feb 16, 2022
Final sign-off
Jun 23, 2023
Declared cost
$925,000
Address
1353 Eddy St

mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1361 0748/016a,1357 0748/016b

Open the permit page

$925,000
Aug 10, 2021Completed
final sign-off Jun 2023
1357 Eddy Stmayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. units connected to 1365 0748/016,1361 0748/016a,1353 0748/016c
Details
Permit
202108106114
Status
complete
Filed
Aug 10, 2021
Permit issued
Feb 16, 2022
Final sign-off
Jun 23, 2023
Declared cost
$925,000
Address
1357 Eddy St

mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. units connected to 1365 0748/016,1361 0748/016a,1353 0748/016c

Open the permit page

$925,000
Aug 10, 2021Completed
final sign-off Jun 2023
1361 Eddy Stmayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016c
Details
Permit
202108106116
Status
complete
Filed
Aug 10, 2021
Permit issued
Feb 16, 2022
Final sign-off
Jun 23, 2023
Declared cost
$925,000
Address
1361 Eddy St

mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016c

Open the permit page

$925,000
Aug 4, 2021Completed
final sign-off Jun 2022
728 Pacific Av#115-1/f: t.i. mall of midrise building. new partitions, casework, toilet room, interior mall windows/doors, security gates, hvac, lighting, plumbing
Details
Permit
202108045808
Status
complete
Filed
Aug 4, 2021
Permit issued
Nov 4, 2021
Final sign-off
Jun 17, 2022
Declared cost
$280,000
Address
728 Pacific Av

#115-1/f: t.i. mall of midrise building. new partitions, casework, toilet room, interior mall windows/doors, security gates, hvac, lighting, plumbing

Open the permit page

$280,000
Jul 26, 2021Completed
final sign-off Nov 2023
937 Clay Stplanned improvements include shower rooms replaement in-kind and dry rot repair; replace 3 sinks @ restrooms w/ trough sinks, add 3 sinks @ corridor. this scope of work occurs in 2nd, 3rd & 4th residential levels of bldg. there is no work being done @ ground fl of bldg under this permit
Details
Permit
202107265085
Status
complete
Filed
Jul 26, 2021
Permit issued
Sep 2, 2021
Final sign-off
Nov 30, 2023
Declared cost
$400,000
Address
937 Clay St

planned improvements include shower rooms replaement in-kind and dry rot repair; replace 3 sinks @ restrooms w/ trough sinks, add 3 sinks @ corridor. this scope of work occurs in 2nd, 3rd & 4th residential levels of bldg. there is no work being done @ ground fl of bldg under this permit

Open the permit page

$400,000
Jul 9, 2021Completed
final sign-off Sep 2023
363 Noe St21 public housing apt w/ 1 resident mgr office. rehab & accesibility @ community space w/ kitchenette,toilet rms & launtry room. replaced windows & exterior doors troughout, (n) roofing, boilers, finishes,fixtures & appliances.(n)mep fixtures+equipmt.minor elevator modernize.addit "b" for office.
Details
Permit
202107094047
Status
complete
Filed
Jul 9, 2021
Permit issued
Feb 16, 2022
Final sign-off
Sep 22, 2023
Declared cost
$5,000,000
Address
363 Noe St

21 public housing apt w/ 1 resident mgr office. rehab & accesibility @ community space w/ kitchenette,toilet rms & launtry room. replaced windows & exterior doors troughout, (n) roofing, boilers, finishes,fixtures & appliances.(n)mep fixtures+equipmt.minor elevator modernize.addit "b" for office.

Open the permit page

$5,000,000
Apr 15, 2021Completed
final sign-off Jan 2022
2200 Van Ness Avrevision to pa 202001303133. revise opening to accessible alcove, moving interior walls, changing concrete strength. ground floor office is accessory to ccdc housing.
Details
Permit
202104158670
Status
complete
Filed
Apr 15, 2021
Permit issued
May 12, 2021
Final sign-off
Jan 28, 2022
Address
2200 Van Ness Av

revision to pa 202001303133. revise opening to accessible alcove, moving interior walls, changing concrete strength. ground floor office is accessory to ccdc housing.

Open the permit page

Feb 25, 2021Never finaled
issued Apr 2021, no final
728 Pacific Avno construction to be done. request to designate an area within mixed used space for a "place of assembly" permit.
Details
Permit
202102255400
Status
issued
Filed
Feb 25, 2021
Permit issued
Apr 5, 2021
Address
728 Pacific Av

no construction to be done. request to designate an area within mixed used space for a "place of assembly" permit.

Open the permit page

Feb 17, 2021Completed
final sign-off May 2022
671 China Basin Stt.i. build out for a childcare center in a 100% affordable housing project(bpa#201804196818)for 4,428 sq childcare center for 45 children. interior spaces:pre-school,toddler & infant classrooms w/ children's restrooms,central space,food warming/prep room,family & staff resources offices.
Details
Permit
202102174828
Status
complete
Filed
Feb 17, 2021
Permit issued
Aug 16, 2021
Final sign-off
May 11, 2022
Declared cost
$1,125,000
Address
671 China Basin St

t.i. build out for a childcare center in a 100% affordable housing project(bpa#201804196818)for 4,428 sq childcare center for 45 children. interior spaces:pre-school,toddler & infant classrooms w/ children's restrooms,central space,food warming/prep room,family & staff resources offices.

Open the permit page

$1,125,000
Feb 4, 2021Completed
final sign-off Dec 2021
804 Clement Stfour bathrooms & two kitchen remodel, paint & flooring, new lighting. in-kind replacement. layout to remain the same. (work in residential units only).
Details
Permit
202102043955
Status
complete
Filed
Feb 4, 2021
Permit issued
Feb 4, 2021
Final sign-off
Dec 9, 2021
Declared cost
$50,000
Address
804 Clement St

four bathrooms & two kitchen remodel, paint & flooring, new lighting. in-kind replacement. layout to remain the same. (work in residential units only).

Open the permit page

$50,000
Jan 4, 2021Completed
final sign-off Dec 2021
800 Clement Strepair or replace 15 existing wood windows with similar wood windows. visible from street. wood to wood being single or double hung with ogee lugs and the curved bays will have curved sashes
Details
Permit
202101042012
Status
complete
Filed
Jan 4, 2021
Permit issued
Jan 4, 2021
Final sign-off
Dec 9, 2021
Declared cost
$28,000
Address
800 Clement St

repair or replace 15 existing wood windows with similar wood windows. visible from street. wood to wood being single or double hung with ogee lugs and the curved bays will have curved sashes

Open the permit page

$28,000
Nov 17, 2020Never finaled
issued Feb 2021, no final
728 Pacific Avsuite #201: no construction; tenant space to remain as is. previous a-2 accessory occupancy to be reinstated to activity area under current existing property conditions
Details
Permit
202011179082
Status
issued
Filed
Nov 17, 2020
Permit issued
Feb 9, 2021
Address
728 Pacific Av

suite #201: no construction; tenant space to remain as is. previous a-2 accessory occupancy to be reinstated to activity area under current existing property conditions

Open the permit page

Nov 3, 2020Completed
final sign-off Oct 2022
900 Jackson Strehab 9 of 17 units. #1,2,4,5,9,10,12,14,&15. replace doors, hardware, flooring, toilets, lavatories, appliances, cabinets, countertops, tub surrounds, elect. outlets in kitchens & baths, new elect. heaters, new elect. water heaters, repair plumbing, new windows in select locations, paint, roofing.
Details
Permit
202011038031
Status
complete
Filed
Nov 3, 2020
Permit issued
May 26, 2021
Final sign-off
Oct 3, 2022
Declared cost
$1,500,000
Address
900 Jackson St

rehab 9 of 17 units. #1,2,4,5,9,10,12,14,&15. replace doors, hardware, flooring, toilets, lavatories, appliances, cabinets, countertops, tub surrounds, elect. outlets in kitchens & baths, new elect. heaters, new elect. water heaters, repair plumbing, new windows in select locations, paint, roofing.

Open the permit page

$1,500,000
Oct 19, 2020Completed
final sign-off Feb 2022
800 Clement Stvoluntary lateral strengthening and associated repairs to floor in area of seismic work. also accessibility per 20% rule.
Details
Permit
202010196873
Status
complete
Filed
Oct 19, 2020
Permit issued
Mar 10, 2021
Final sign-off
Feb 14, 2022
Declared cost
$25,000
Address
800 Clement St

voluntary lateral strengthening and associated repairs to floor in area of seismic work. also accessibility per 20% rule.

Open the permit page

$25,000
Aug 27, 2020Completed
final sign-off Nov 2020
3158 Mission Stcommencement of work approved under permit application #201707071225
Details
Permit
202008272803
Status
complete
Filed
Aug 27, 2020
Permit issued
Nov 2, 2020
Final sign-off
Nov 16, 2020
Declared cost
$30,000
Address
3158 Mission St

commencement of work approved under permit application #201707071225

Open the permit page

$30,000
May 21, 2020Completed
final sign-off Jun 2020
348 Precita Avrev to pa#202002204930. revise the new foundation details (sheet s-3 detail 5).
Details
Permit
202005217665
Status
complete
Filed
May 21, 2020
Permit issued
Jun 3, 2020
Final sign-off
Jun 30, 2020
Address
348 Precita Av

rev to pa#202002204930. revise the new foundation details (sheet s-3 detail 5).

Open the permit page

May 20, 2020Never finaled
issued Jul 2020, no final
3198 24th Stmech, electrical & plumb work for interior t.i of (e) ground flr tenant space for (e) donut cafe. (n) furnace, restrm exhaust fan, type 1 hood & associated exhaust fan & makeup air unit. replace electrical branch cir panel,(n) water heater & grease interceptor. ref pa#'s 201809130103, 201912179801
Details
Permit
202005207641
Status
issued
Filed
May 20, 2020
Permit issued
Jul 7, 2020
Declared cost
$100,000
Address
3198 24th St

mech, electrical & plumb work for interior t.i of (e) ground flr tenant space for (e) donut cafe. (n) furnace, restrm exhaust fan, type 1 hood & associated exhaust fan & makeup air unit. replace electrical branch cir panel,(n) water heater & grease interceptor. ref pa#'s 201809130103, 201912179801

Open the permit page

$100,000
May 11, 2020Completed
final sign-off Oct 2021
1535 Jackson Strevision to permit application number 2019-1114-7307 for mandatory soft story retrofit using cebc appendix a-4. revision includes changes based field conditions and eliminates two shear lines for value engineering.
Details
Permit
202005117389
Status
complete
Filed
May 11, 2020
Permit issued
Sep 18, 2020
Final sign-off
Oct 27, 2021
Address
1535 Jackson St

revision to permit application number 2019-1114-7307 for mandatory soft story retrofit using cebc appendix a-4. revision includes changes based field conditions and eliminates two shear lines for value engineering.

Open the permit page

Mar 4, 2020Completed
final sign-off Jun 2020
344 Precita Avremoval of (e) roofdeck to replace (e) flatroof, reinstall (e) deck mat'l after roofwork, work less than 50% of new mat'l, roof under separate permit, exploratory demo of exterior wood siding for structural investigatives, replace (13) aluminum clad wood windows in-kind.
Details
Permit
202003046215
Status
complete
Filed
Mar 4, 2020
Permit issued
Mar 10, 2020
Final sign-off
Jun 30, 2020
Declared cost
$10,000
Address
344 Precita Av

removal of (e) roofdeck to replace (e) flatroof, reinstall (e) deck mat'l after roofwork, work less than 50% of new mat'l, roof under separate permit, exploratory demo of exterior wood siding for structural investigatives, replace (13) aluminum clad wood windows in-kind.

Open the permit page

$10,000
Feb 25, 2020Completed
final sign-off Oct 2022
1201 Powell Stmandatory soft story retrofit of gr fl basement based on 2019 cebc appendix chapter a4. comply with nov 201803429
Details
Permit
202002255286
Status
complete
Filed
Feb 25, 2020
Permit issued
Oct 6, 2020
Final sign-off
Oct 3, 2022
Declared cost
$200,000
Address
1201 Powell St

mandatory soft story retrofit of gr fl basement based on 2019 cebc appendix chapter a4. comply with nov 201803429

Open the permit page

$200,000
Feb 25, 2020Expired or cancelled
expired Oct 2022
1201 Powell Stmandatory soft story retrofit of gr fl and basement based on 2019 cebc appendix ch a4. includes accesibility improvments to commercial entry. automatic door. comply with nov 201803426
Details
Permit
202002255287
Status
expired
Filed
Feb 25, 2020
Permit issued
Oct 6, 2020
Declared cost
$40,000
Address
1201 Powell St

mandatory soft story retrofit of gr fl and basement based on 2019 cebc appendix ch a4. includes accesibility improvments to commercial entry. automatic door. comply with nov 201803426

Open the permit page

$40,000
Feb 20, 2020Completed
final sign-off Sep 2020
3154 Mission Stvoluntary seismic retrofit of first story and ada improvements n/a maher
Details
Permit
202002204961
Status
complete
Filed
Feb 20, 2020
Permit issued
Apr 22, 2020
Final sign-off
Sep 8, 2020
Declared cost
$50,000
Address
3154 Mission St

voluntary seismic retrofit of first story and ada improvements n/a maher

Open the permit page

$50,000
Feb 20, 2020Never finaled
issued Apr 2020, no final
348 Precita Avvoluntary improvement to rebuild a portion of the building foundation
Details
Permit
202002204930
Status
issued
Filed
Feb 20, 2020
Permit issued
Apr 17, 2020
Declared cost
$20,000
Address
348 Precita Av

voluntary improvement to rebuild a portion of the building foundation

Open the permit page

$20,000