Block 0178, lot 001
799 Pacific Ave
- City’s use
- Multi-Family Residential
- Built
- 1950
- Stories
- 7
- Units
- 117
- Rooms
- 121 bathrooms
- Lot
- 55,578 sq ft
- Zoning
- RM4
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
66 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 27, 2025 | In progress filed Feb 2025, not yet issued | 799 Pacific Av | Amone Corp | new out door fence and gate(construction revision) per pa #202501077873. relocate of the proposed, fence away from the existing, pull down fire escape ladder. replacement of exterior doors with new exterior door and window; construction revision cost is $10,000.00Details
new out door fence and gate(construction revision) per pa #202501077873. relocate of the proposed, fence away from the existing, pull down fire escape ladder. replacement of exterior doors with new exterior door and window; construction revision cost is $10,000.00 | $10,000 |
| Feb 20, 2025 | In progress issued Apr 2025 | 795 Pacific Av | Amone Corp | new outdoor fence and gate @ playground behind the building of 795 pacific ave. not on property lineDetails
new outdoor fence and gate @ playground behind the building of 795 pacific ave. not on property line | $15,000 |
| Jan 7, 2025 | In progress issued Jan 2025 | 799 Pacific Av | Amone Corp | new outdoor fence and gate.Details
new outdoor fence and gate. | $15,000 |
| Feb 5, 2024 | Completed final sign-off Mar 2024 | 711 Pacific Av | San Francisco Fire Protection | to verify extg sound levels in sleeping areas. comply with sffc section 1103.7.6.1 indicating the dba reading in each living area and sleeping area of at least 75dbaDetails
to verify extg sound levels in sleeping areas. comply with sffc section 1103.7.6.1 indicating the dba reading in each living area and sleeping area of at least 75dba | |
| Jan 14, 2020 | Completed final sign-off Jan 2021 | 799 Pacific Av | Gourley Construction | install new cantilever shade at preschool ada was addressed on previous on pa# 201902153033.Details
install new cantilever shade at preschool ada was addressed on previous on pa# 201902153033. | $20,708 |
| Aug 14, 2019 | Never finaled issued Aug 2019, no final | 799 Pacific Av | street spaceDetails
street space | ||
| Jun 3, 2019 | Never finaled filed Jun 2019, never issued | 799 Pacific Av | street spaceDetails
street space | ||
| Feb 15, 2019 | Completed final sign-off Sep 2019 | 799 Pacific Av | Miracle Construction | remove 2 (e) non-compliant structures. install (n) ada / title 24 play equipment, fence w/ 2 gates 48" in height. gates w/ panic bars to provide a compliant path of travelDetails
remove 2 (e) non-compliant structures. install (n) ada / title 24 play equipment, fence w/ 2 gates 48" in height. gates w/ panic bars to provide a compliant path of travel | $126,500 |
| Dec 12, 2018 | Completed final sign-off Mar 2019 | 711 Pacific Av | Cahill Contractors Inc | change of use from temporary occupancy approved permit pa 2018-0402-5282 education to original approved assembly occupancy per 2015-1020-0191 install kitchen and bathroom doors, toilet partitions and apliances at community centerDetails
change of use from temporary occupancy approved permit pa 2018-0402-5282 education to original approved assembly occupancy per 2015-1020-0191 install kitchen and bathroom doors, toilet partitions and apliances at community center | |
| Dec 5, 2018 | Never finaled issued Dec 2018, no final | 795 Pacific Av | Details
| ||
| Aug 22, 2018 | Completed final sign-off Mar 2019 | 795 Pacific Av | Cahill Contractors Llc. | revision to app#201510200191 to provide wrap at shower pipe per field inspectionDetails
revision to app#201510200191 to provide wrap at shower pipe per field inspection | $1,000 |
| Aug 22, 2018 | Completed final sign-off Mar 2019 | 711 Pacific Av | Cahill Contractors Llc. | revision to app#201510200191 to revise previously approved plan layout at type c.2, 2 bedroom unit and type b.5, 2 bedroom unit, replacement units only.Details
revision to app#201510200191 to revise previously approved plan layout at type c.2, 2 bedroom unit and type b.5, 2 bedroom unit, replacement units only. | $5,000 |
| May 15, 2018 | Never finaled issued May 2018, no final | 711 Pacific Av | street spaceDetails
street space | ||
| May 15, 2018 | Never finaled issued May 2018, no final | 795 Pacific Av | street space w/mtaDetails
street space w/mta | ||
| Apr 4, 2018 | Completed final sign-off Mar 2019 | 711 Pacific Av | Cahill Contractors Llc. | upgrade to extg exterior emergency generator. revision to app#201510200191. n/a for maherDetails
upgrade to extg exterior emergency generator. revision to app#201510200191. n/a for maher | $5,000 |
| Apr 2, 2018 | Completed final sign-off Oct 2018 | 711 Pacific Av | Cahill Contractors Llc. | temporary change of use of new a-3 construction for relocated on site childcare, use for 9-12 month . revision to pa# 2015-1020-0191. n/a for maherDetails
temporary change of use of new a-3 construction for relocated on site childcare, use for 9-12 month . revision to pa# 2015-1020-0191. n/a for maher | |
| Mar 19, 2018 | Completed final sign-off Apr 2018 | 795 Pacific Av | test building for errcs coverage - bldg passed testing. no physical work under this permitDetails
test building for errcs coverage - bldg passed testing. no physical work under this permit | $1,500 | |
| Mar 19, 2018 | Completed final sign-off Apr 2018 | 711 Pacific Av | test building for errcs coverage - bldg passed testing. no physical work done under this permit. maher naDetails
test building for errcs coverage - bldg passed testing. no physical work done under this permit. maher na | $1,500 | |
| Mar 1, 2018 | Completed final sign-off Mar 2019 | 711 Pacific Av | Garnett Signs Llc | evacuation mapsDetails
evacuation maps | $18,400 |
| Feb 26, 2018 | Completed final sign-off Mar 2019 | 711 Pacific Av | Cahill Contractors Llc. | revision to pa#201510201091, clarification of sloping at unit entrances. n/a for maher.Details
revision to pa#201510201091, clarification of sloping at unit entrances. n/a for maher. | |
| Jan 4, 2018 | Never finaled issued Jan 2018, no final | 711 Pacific Av | Rcm Fire Protection Inc. | recommencement and completion of work approved under pa# 201612124681, install new fire line (e) lineDetails
recommencement and completion of work approved under pa# 201612124681, install new fire line (e) line | $15,000 |
| Dec 8, 2017 | Never finaled issued Dec 2017, no final | 799 Pacific Av | street spaceDetails
street space | ||
| Nov 15, 2017 | Completed final sign-off Mar 2019 | 711 Pacific Av | Cahill Contractors Llc. | revision to pa#201510200191 s-1 to confirm type of construction for the community center is type 1b, fire wall plan check comment shown on reference drawings (attached) is not applicable to this project. the 3-hr wall is not required. n/a ordinance #155-13Details
revision to pa#201510200191 s-1 to confirm type of construction for the community center is type 1b, fire wall plan check comment shown on reference drawings (attached) is not applicable to this project. the 3-hr wall is not required. n/a ordinance #155-13 | |
| Oct 16, 2017 | Completed final sign-off Mar 2019 | 711 Pacific Av | reference bpa#201510200191, installation of roof stanchions maher not reqDetails
reference bpa#201510200191, installation of roof stanchions maher not req | $20,000 | |
| Sep 11, 2017 | Never finaled issued Sep 2017, no final | 795 Pacific Av | street spaceDetails
street space | ||
| Aug 15, 2017 | Never finaled issued Aug 2017, no final | 711 Pacific Av | street spaceDetails
street space | ||
| Jul 28, 2017 | Never finaled issued Jul 2017, no final | 795 Pacific Av | street space w/mtaDetails
street space w/mta | ||
| Jul 7, 2017 | Never finaled issued Jul 2017, no final | 795 Pacific Av | street space w/mtaDetails
street space w/mta | ||
| Jun 29, 2017 | Completed final sign-off Nov 2017 | 799 Pacific Av | Thomson Construction, Inc. | not visible from street. exterior path travel barrier removal. remove 1 4' (e) fence with gate and 1 (e) 7'gate and replace with 1 new 7' gate with panic hardware to allow accessible path of travel from ex outdoor play areaDetails
not visible from street. exterior path travel barrier removal. remove 1 4' (e) fence with gate and 1 (e) 7'gate and replace with 1 new 7' gate with panic hardware to allow accessible path of travel from ex outdoor play area | $6,500 |
| Jun 6, 2017 | Never finaled issued Jun 2017, no final | 711 Pacific Av | Cahill Contractors Llc. | street spaceDetails
street space | |
| Dec 12, 2016 | Completed final sign-off Mar 2019 | 711 Pacific Av | Rcm Fire Protection Inc. | install new fire service line to (e) fire sprinkler system upgrade (e) fire sprinkler system ref 201510200191; n/a maherDetails
install new fire service line to (e) fire sprinkler system upgrade (e) fire sprinkler system ref 201510200191; n/a maher | $15,000 |
| Nov 17, 2016 | Completed final sign-off Nov 2017 | 799 Pacific Av | Thomson Construction, Inc. | remove exiting office door, remove closets in office, remove exterior wall and replace with new storefront. install new ceiling, lighting and electrical outlets. new carpet and paintDetails
remove exiting office door, remove closets in office, remove exterior wall and replace with new storefront. install new ceiling, lighting and electrical outlets. new carpet and paint | $24,000 |
| Aug 1, 2016 | Completed final sign-off Oct 2016 | 799 Pacific Av | Thomson Construction, Inc. | new rated doors (5), new food prep cabinets, appliances & lighting. new partition in toddles/infant room. new staff room w/new door. remove (e) closet, remove 2 (e) doors & replace with 1 new door.Details
new rated doors (5), new food prep cabinets, appliances & lighting. new partition in toddles/infant room. new staff room w/new door. remove (e) closet, remove 2 (e) doors & replace with 1 new door. | $68,280 |
| Oct 20, 2015 | Completed final sign-off Mar 2019 | 711 Pacific Av | Cahill Contractors Inc, Sabah International Incorporated | rad program. new horizontal addition for community room, new accessible units, new garbage enclosures, new plumbing + electrical systems, new exhaust systems. n/a for maher ordinance no. 155-13.Details
rad program. new horizontal addition for community room, new accessible units, new garbage enclosures, new plumbing + electrical systems, new exhaust systems. n/a for maher ordinance no. 155-13. | $5,000,000 |
| Apr 22, 2013 | Expired or cancelled cancelled Sep 2023 | 711 Pacific Av | upgrade fire alarm system with new programmed fire alarm panel & new fire alarm annunciator panel, new horn/strobes to replace existing horn/strobes or bells, new pull stations to replace existing pull stations & new smoke detectors to replace existing.Details
upgrade fire alarm system with new programmed fire alarm panel & new fire alarm annunciator panel, new horn/strobes to replace existing horn/strobes or bells, new pull stations to replace existing pull stations & new smoke detectors to replace existing. | $50,000 | |
| Dec 5, 2012 | Never finaled issued Dec 2012, no final | 795 Pacific Av | street space & mta parking meterDetails
street space & mta parking meter | ||
| Oct 12, 2012 | Never finaled issued Oct 2012, no final | 795 Pacific Av | street spaceDetails
street space | ||
| Jul 12, 2012 | Never finaled issued Jul 2012, no final | 711 Pacific Av | street space & mta permitDetails
street space & mta permit | ||
| Jun 12, 2012 | Never finaled issued Jun 2012, no final | 711 Pacific Av | street space permit.Details
street space permit. | ||
| Mar 26, 2012 | Expired or cancelled cancelled Jan 2026 | 795 Pacific Av | boiler & gwh replacement. boiler = 970#, gwh = 1800#Details
boiler & gwh replacement. boiler = 970#, gwh = 1800# | $300,000 | |
| Sep 29, 2011 | Never finaled issued Sep 2011, no final | 711 Pacific Av | street spaceDetails
street space | ||
| Sep 6, 2011 | Never finaled issued Sep 2011, no final | 795 Pacific Av | street space permitDetails
street space permit | ||
| Jul 8, 2011 | Never finaled issued Jul 2011, no final | 795 Pacific Av | street space permitDetails
street space permit | ||
| Jun 13, 2011 | Never finaled issued Jun 2011, no final | 795 Pacific Av | street space & mta parking meterDetails
street space & mta parking meter | ||
| Apr 29, 2011 | Never finaled issued Apr 2011, no final | 711 Pacific Av | street space & sidewalkDetails
street space & sidewalk | ||
| Apr 18, 2011 | Never finaled issued Apr 2011, no final | 795 Pacific Av | street space permitDetails
street space permit | ||
| Mar 8, 2011 | Expired or cancelled cancelled Jul 2024 | 711 Pacific Av | voluntary addition of a new tracation elevator hoistway structure adjacent to the (e) building at the west wing courtyard @ 711 pacific ave. this is a voluntary upgrade to improve disable & senior access. only alteration is removing asection 0f guardrail for elevator connection.Details
voluntary addition of a new tracation elevator hoistway structure adjacent to the (e) building at the west wing courtyard @ 711 pacific ave. this is a voluntary upgrade to improve disable & senior access. only alteration is removing asection 0f guardrail for elevator connection. | $300,000 | |
| Mar 7, 2011 | Never finaled issued Mar 2011, no final | 795 Pacific Av | street space & mta permitDetails
street space & mta permit | ||
| Jan 28, 2011 | Never finaled issued Jan 2011, no final | 711 Pacific Av | street space permit.Details
street space permit. | ||
| Oct 28, 2010 | Never finaled issued Oct 2010, no final | 711 Pacific Av | street space permitDetails
street space permit | ||
| Sep 27, 2010 | Never finaled issued Sep 2010, no final | 711 Pacific Av | street space permit only.Details
street space permit only. | ||
| Aug 5, 2010 | Completed final sign-off Dec 2011 | 795 Pacific Av | Best Roofing & Waterproofing Inc | window replacement.Details
window replacement. | $1,200,000 |
| Dec 19, 2008 | Never finaled issued Dec 2008, no final | 711 Pacific Av | street space only.Details
street space only. | ||
| Nov 20, 2008 | Never finaled issued Nov 2008, no final | 711 Pacific Av | street space permit only.Details
street space permit only. | ||
| Oct 23, 2008 | Expired or cancelled cancelled Mar 2011 | 711 Pacific Av | proposed elevator addition adjacent to (e) bldg.structurally independent, hoistway structure, bridging to (e) balconies at 6 locations. new lighting, electrical and mechanical, included for function of machine-room- less elevator type.Details
proposed elevator addition adjacent to (e) bldg.structurally independent, hoistway structure, bridging to (e) balconies at 6 locations. new lighting, electrical and mechanical, included for function of machine-room- less elevator type. | $350,000 | |
| Sep 10, 2008 | Never finaled issued Sep 2008, no final | 711 Pacific Av | street space permit only.Details
street space permit only. | ||
| Aug 23, 2006 | Completed final sign-off Jan 2008 | 711 Pacific Av | removal of extg outdoor mailboxes. installation of new recessed mail boxes unit in new wall enclosure within extg site. provide accessible walk for new mail boxesDetails
removal of extg outdoor mailboxes. installation of new recessed mail boxes unit in new wall enclosure within extg site. provide accessible walk for new mail boxes | $15,537 | |
| Mar 16, 2004 | Never finaled issued Mar 2004, no final | 711 Pacific Av | street space permitDetails
street space permit | ||
| Jan 12, 2004 | Never finaled issued Jan 2004, no final | 711 Pacific Av | street spaceDetails
street space | ||
| Aug 4, 2003 | Never finaled issued Aug 2003, no final | 711 Pacific Av | street spaceDetails
street space | ||
| Jun 3, 2003 | Completed final sign-off May 2004 | 711 Pacific Av | Hoi's Construction | ada compliance wor,included remodeling existing exterior concrete ramp to accssble ramp;install newDetails
ada compliance wor,included remodeling existing exterior concrete ramp to accssble ramp;install new | $137,000 |
| Nov 6, 2002 | Completed final sign-off Jul 2003 | 711 Pacific Av | install ductless kitchen range hood&electrical wiring.install wall mounted wood cabinet to supp hoodDetails
install ductless kitchen range hood&electrical wiring.install wall mounted wood cabinet to supp hood | $62,000 | |
| Nov 6, 2002 | Completed final sign-off Jul 2003 | 795 Pacific Av | install ductless kitchen range hood&electrical wiring.install wall mounted wood cabinet to supp hoodDetails
install ductless kitchen range hood&electrical wiring.install wall mounted wood cabinet to supp hood | $62,000 | |
| May 14, 2001 | Expired or cancelled expired May 2002 | 711 Pacific Av | street spaceDetails
street space | ||
| Dec 21, 2000 | Expired or cancelled expired Dec 2001 | 711 Pacific Av | street spaceDetails
street space | ||
| Aug 1, 2000 | Expired or cancelled expired Dec 2000 | 711 Pacific Av | street spaceDetails
street space |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.