Zachary Nathan
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Zachary Nathan Architect
- Based in
- San Francisco
- On San Francisco permits
- Oct 2001 to Nov 2023
125 permits since 2000 (architect on 114 permits, authorized agent-others on 10 permits, engineer on 3 permits): 68 completed, 1 in progress, 28 never finaled, 28 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 125.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 27, 2023 | Completed final sign-off Dec 2023 | 1353 Bush St | C B 2 Builders Incorporated | to obtian final inspection for work approved under pa# 201412053171 & 201206273531. all work is complete.Details
to obtian final inspection for work approved under pa# 201412053171 & 201206273531. all work is complete. | |
| Nov 7, 2023 | Completed final sign-off Jan 2024 | 1074 Folsom St | Lombardi Property Development | to comply with abe entrance ord 51-16. abe 201810152290. work includes new lockset at entrance gate, kick plates, door threshold and signageDetails
to comply with abe entrance ord 51-16. abe 201810152290. work includes new lockset at entrance gate, kick plates, door threshold and signage | $800 |
| Oct 25, 2023 | Completed final sign-off Oct 2024 | 225 Potrero Av | C B 2 Builders Incorporated | remodel existing kitchen @ ground floor, new diabled accessible entrance @ dining room.Details
remodel existing kitchen @ ground floor, new diabled accessible entrance @ dining room. | $126,000 |
| Sep 27, 2023 | In progress issued Oct 2023 | 245 05th St | Yerba Buena Builders Inc | unit# 110: remodel existing residential/commercial space at 1/f add new enclosed office and wet bar, 2/f add new residential kitchen and bathroom, upgrade unisex restroom for disabled access, replace doors at existing bedroom.Details
unit# 110: remodel existing residential/commercial space at 1/f add new enclosed office and wet bar, 2/f add new residential kitchen and bathroom, upgrade unisex restroom for disabled access, replace doors at existing bedroom. | $64,000 |
| Sep 19, 2023 | Completed final sign-off Mar 2025 | 1432 Valencia St | Chongson Construction Co. | remodel storefront with new windows and bulkhead disabled access upgrade to entrance, unisex toilet room including vestibule addition and bar counterDetails
remodel storefront with new windows and bulkhead disabled access upgrade to entrance, unisex toilet room including vestibule addition and bar counter | $85,000 |
| Aug 25, 2023 | Completed final sign-off Jul 2024 | 332 Balboa St | City Lumber & Hardware Inc Dba City Door | to comply with the accessible business entrance program-ordinance 51-16 abe 201805300571. add power door operator.Details
to comply with the accessible business entrance program-ordinance 51-16 abe 201805300571. add power door operator. | $4,000 |
| Aug 25, 2023 | Never finaled issued Sep 2023, no final | 1512 Grant Av | comply with the accessible business entrance program ord 51-16. abe 201901033826. provide powr door operator at main entrance door and replace door hardware.Details
comply with the accessible business entrance program ord 51-16. abe 201901033826. provide powr door operator at main entrance door and replace door hardware. | $4,000 | |
| Aug 25, 2023 | Never finaled issued Sep 2023, no final | 484 Union St | comply with accessible business enrance program ord no 51-16 abe no 201901033836. provide power door operator at main entrance door. replace door hardward and door threshholdDetails
comply with accessible business enrance program ord no 51-16 abe no 201901033836. provide power door operator at main entrance door. replace door hardward and door threshhold | $4,000 | |
| Aug 21, 2023 | Completed final sign-off Nov 2023 | 2244 Fillmore St | Sure, Inc. | comply with the accessible business entrance program ordinance 51-16. abe: 2019010223757. add power door operator.Details
comply with the accessible business entrance program ordinance 51-16. abe: 2019010223757. add power door operator. | $4,000 |
| Jul 25, 2023 | Expired or cancelled expired Dec 2023 | 1353 Bush St | C B 2 Builders Incorporated | rev bpa#202112224933, revise equipment config @ wouth wall of bar101, convert music studio 110 @ basement to dry storage room, omit ramp/platform @ rm 125, omit display cases @ rm 239/all free standing display cases @ basement-1/f-2/f, document (e)storage rm 100 @2/f/(e) phone nrm @ hallway 301, addDetails
rev bpa#202112224933, revise equipment config @ wouth wall of bar101, convert music studio 110 @ basement to dry storage room, omit ramp/platform @ rm 125, omit display cases @ rm 239/all free standing display cases @ basement-1/f-2/f, document (e)storage rm 100 @2/f/(e) phone nrm @ hallway 301, add | |
| Jul 17, 2023 | Never finaled issued Jul 2023, no final | 1418 Ingalls St | Restoration Workshop Ltd | interior remodel of 1/f and bathroom remodel of 2/f. voluntary foundation strengthening, replace garage slab & voluntary plywood shear wall strengthening. add bathroom and bedroom at 1/fDetails
interior remodel of 1/f and bathroom remodel of 2/f. voluntary foundation strengthening, replace garage slab & voluntary plywood shear wall strengthening. add bathroom and bedroom at 1/f | $185,000 |
| May 24, 2023 | Never finaled issued May 2023, no final | 5641 Geary Bl | to comply with the accessible business entrance program ordinance 51-16. abe-202212155652. add power door operator.Details
to comply with the accessible business entrance program ordinance 51-16. abe-202212155652. add power door operator. | $4,500 | |
| May 12, 2023 | Completed final sign-off Jan 2024 | 3358 22nd St | Restoration Workshop Ltd | replace exterior finishes at south and east facades, replace 3 front entrance doors with 2 original doors and enlarge opening , restore window at south facade at extg framed opening and replace double hung windows at ground flr.Details
replace exterior finishes at south and east facades, replace 3 front entrance doors with 2 original doors and enlarge opening , restore window at south facade at extg framed opening and replace double hung windows at ground flr. | $60,000 |
| Mar 3, 2023 | Completed final sign-off Feb 2024 | 1681 Church St | Double Woods Construction Inc | to comply with abe program ord 51-16 abe 202212205724. add accessible ramp @ 1st fl existing entrance to 1681 church st. add power door operatorDetails
to comply with abe program ord 51-16 abe 202212205724. add accessible ramp @ 1st fl existing entrance to 1681 church st. add power door operator | $27,000 |
| Feb 28, 2023 | Never finaled issued Mar 2023, no final | 1070 Valencia St | to comply with the accesible business entrance program abe 202209144313 reuse power door to operator and install new conrols at entranceDetails
to comply with the accesible business entrance program abe 202209144313 reuse power door to operator and install new conrols at entrance | $10,000 | |
| Feb 28, 2023 | Never finaled issued Mar 2023, no final | 1074 Valencia St | to comply with the accesible business entrance program abe 202209144314 replace entry dor with 3'0" wide door and add power door opertor, provide new hardwareDetails
to comply with the accesible business entrance program abe 202209144314 replace entry dor with 3'0" wide door and add power door opertor, provide new hardware | $10,000 | |
| Jan 23, 2023 | Completed final sign-off Jan 2024 | 3006 Buchanan St | to comply with abe program ord 51-16. ref abe 201903265591. provide railing and striping at entrance stairs, provide new door hardware and reverse door swing to open inwards. add intercom and power door operator. request for technical infeasibility.Details
to comply with abe program ord 51-16. ref abe 201903265591. provide railing and striping at entrance stairs, provide new door hardware and reverse door swing to open inwards. add intercom and power door operator. request for technical infeasibility. | $9,000 | |
| Jan 23, 2023 | Completed final sign-off May 2023 | 1404 Church St | to comply with the accessible business entrance program. abe# 201807171448. request for technical infeasibility.Details
to comply with the accessible business entrance program. abe# 201807171448. request for technical infeasibility. | $400 | |
| Jan 23, 2023 | Never finaled issued Jun 2023, no final | 1996 Union St | to comply with abe program ord 51-16. ref abe 202209073933. provide power door operator, railing and striping at entrance stair. request technical infeasibility.Details
to comply with abe program ord 51-16. ref abe 202209073933. provide power door operator, railing and striping at entrance stair. request technical infeasibility. | $4,500 | |
| Dec 20, 2022 | Never finaled issued Mar 2023, no final | 3610 Sacramento St | to comply with acessible business entrance program abe 2020012311224. request for technical infeasibility, provide new stair handrails & striping, add power door operator & accessibile door hardware.Details
to comply with acessible business entrance program abe 2020012311224. request for technical infeasibility, provide new stair handrails & striping, add power door operator & accessibile door hardware. | $5,000 | |
| Dec 20, 2022 | Never finaled issued Mar 2023, no final | 3608 Sacramento St | to comply with acessible business entrance program abe 202001231223. request for technical infeasibility, provide new stair handrails & striping, add power door operator & accessibile door hardware. patch terrazzo at removed stair, rail to match existing.Details
to comply with acessible business entrance program abe 202001231223. request for technical infeasibility, provide new stair handrails & striping, add power door operator & accessibile door hardware. patch terrazzo at removed stair, rail to match existing. | $14,000 | |
| Dec 13, 2022 | Never finaled issued Mar 2023, no final | 1062 Valencia St | comply withy accessible business entrance program. 1062 valencia abe 202206302056. replace entry door with 3"0 wide door and add power door operator.Details
comply withy accessible business entrance program. 1062 valencia abe 202206302056. replace entry door with 3"0 wide door and add power door operator. | $15,000 | |
| Nov 4, 2022 | Completed final sign-off Sep 2023 | 2124 Chestnut St | to comply w/ accessible business ordinance 51-16. add power door operator and lower door hardware. abe #202205120778Details
to comply w/ accessible business ordinance 51-16. add power door operator and lower door hardware. abe #202205120778 | $4,700 | |
| Sep 8, 2022 | Never finaled issued Aug 2023, no final | 65 Aerial Wy | Zarc Construction Inc | exterior one story horizontal side yard addition to the main entry of an (e)two story residence.interior remodel @ 1st fl,remove (e)stair,(n) interior stair,replace all windows,remodel kitchen,remodel all 3 baths.Details
exterior one story horizontal side yard addition to the main entry of an (e)two story residence.interior remodel @ 1st fl,remove (e)stair,(n) interior stair,replace all windows,remodel kitchen,remodel all 3 baths. | $190,000 |
| Aug 23, 2022 | Never finaled issued Jun 2023, no final | 1994 Union St | comply with abe program per ord 51-16. abe# 201910287465. request for technical infeasibility. install railing and striping at entrance stairs.Details
comply with abe program per ord 51-16. abe# 201910287465. request for technical infeasibility. install railing and striping at entrance stairs. | $1,000 | |
| Mar 16, 2022 | Completed final sign-off Feb 2023 | 854 Folsom St | Yerba Buena Builders Inc | t.i. at 2nd floor. add new conferance room and reception room. disabled access path of travel upgrade at 2nd floor restrooms.Details
t.i. at 2nd floor. add new conferance room and reception room. disabled access path of travel upgrade at 2nd floor restrooms. | $45,000 |
| Dec 22, 2021 | Expired or cancelled expired Dec 2023 | 1353 Bush St | C B 2 Builders Incorporated | revision to 201808137167, relocate kitchen to basement level food prep area. add bar @ basement w/sidewalk service windows. reconfigure basement rooms. reconfifure offce #231 into a dry storage rm. storage rm #205 into a beer cooler glass rm. rm #211 into an employee changing rm (all on 1st fl)Details
revision to 201808137167, relocate kitchen to basement level food prep area. add bar @ basement w/sidewalk service windows. reconfigure basement rooms. reconfifure offce #231 into a dry storage rm. storage rm #205 into a beer cooler glass rm. rm #211 into an employee changing rm (all on 1st fl) | |
| Oct 15, 2021 | Expired or cancelled expired Oct 2025 | 161 Powell St | revision to 202103086109. reconfigure bathrooms @ guestrooms 316 & 416. enlarge sleeping area @ each rm. (e) hvac to remain. no removing any guestrooms.Details
revision to 202103086109. reconfigure bathrooms @ guestrooms 316 & 416. enlarge sleeping area @ each rm. (e) hvac to remain. no removing any guestrooms. | ||
| Sep 29, 2021 | Expired or cancelled cancelled Jan 2026 | 318 Columbus Av | to comply with accessible business entrance program ordinance 51-16. provide power door operatorDetails
to comply with accessible business entrance program ordinance 51-16. provide power door operator | $4,500 | |
| Jul 15, 2021 | Completed final sign-off Jan 2022 | 50 Clement St | Burton's Construction | to comply with the accesible business entrance program ordinance 51-18. request for technical infeasibility and provide new signage and intercom.Details
to comply with the accesible business entrance program ordinance 51-18. request for technical infeasibility and provide new signage and intercom. | $600 |
| Jul 2, 2021 | Never finaled issued Jul 2021, no final | 1785 San Jose Av | Unicon Construction Solutions Llc | revision to pa 2019-0205-2082 s1 - add hot tub @ deck, widen stair from deck to grade and add gas heaters @ deckDetails
revision to pa 2019-0205-2082 s1 - add hot tub @ deck, widen stair from deck to grade and add gas heaters @ deck | $4,500 |
| Apr 16, 2021 | Completed final sign-off Feb 2022 | 459 Hazelwood Av | Pacheco Builders Inc. | interior remodel of the existing first floor bathroom.Details
interior remodel of the existing first floor bathroom. | $27,000 |
| Mar 8, 2021 | Expired or cancelled expired Oct 2025 | 161 Powell St | barrier removal at 2 existing hotel guestrooms 316 and 416 to provide mobility features and communication features.Details
barrier removal at 2 existing hotel guestrooms 316 and 416 to provide mobility features and communication features. | $55,000 | |
| Jan 19, 2021 | Never finaled issued Sep 2023, no final | 470 08th Av | 1) vertical and horizontal addition and alteration to existing (3)dwelling unit building.(1)new dwelling unit at 4th floor vertical addition.addition at front and rear.2) demolition of existing non-conforming garage in rear yard to be submitted under a separate permit.3) full seismic retrofit.Details
1) vertical and horizontal addition and alteration to existing (3)dwelling unit building.(1)new dwelling unit at 4th floor vertical addition.addition at front and rear.2) demolition of existing non-conforming garage in rear yard to be submitted under a separate permit.3) full seismic retrofit. | $420,000 | |
| Dec 28, 2020 | Completed final sign-off Dec 2023 | 58 Lake Forest Ct | B&I Modernconstr.Inc/Dba Bi Qualty Pntng | provide one new accessory dwelling unit at ground floor of existing single family home. existing habitable space will be converted into an adu within the existing building envelope. an existing home office will be converted to a kitchen within the proposed adu space.Details
provide one new accessory dwelling unit at ground floor of existing single family home. existing habitable space will be converted into an adu within the existing building envelope. an existing home office will be converted to a kitchen within the proposed adu space. | $21,000 |
| Nov 20, 2020 | Completed final sign-off Sep 2025 | 1700 Waller St | provide one new accessory dwelling unit at ground floor of existing 4 unit apartment building. existing storage space (not for tenant use) will be converted into an adu within the existing building envelope. per ord 162-16.Details
provide one new accessory dwelling unit at ground floor of existing 4 unit apartment building. existing storage space (not for tenant use) will be converted into an adu within the existing building envelope. per ord 162-16. | $100,000 | |
| Oct 2, 2020 | Completed final sign-off Jul 2022 | 2901 Mariposa St | Fly Cloud Construction | restore demising walls at 2nd fl guest rooms per original approved permit to provide 46 total guest rooms. walls to be provided at rooms 217, 218, 219, 221, 222, 223 and 224. fire rated doors to be provided between these rooms.Details
restore demising walls at 2nd fl guest rooms per original approved permit to provide 46 total guest rooms. walls to be provided at rooms 217, 218, 219, 221, 222, 223 and 224. fire rated doors to be provided between these rooms. | $28,000 |
| Sep 17, 2019 | Never finaled issued Sep 2019, no final | 32 Marne Av | Terence Mcmahon Construction | new interior vertical lift and shaft. remodel of an existing second floor bathroom into an accessible bathroom with roll-in shower. new exterior door to rear yard and a new 18" high wood deck and wood rampDetails
new interior vertical lift and shaft. remodel of an existing second floor bathroom into an accessible bathroom with roll-in shower. new exterior door to rear yard and a new 18" high wood deck and wood ramp | $96,000 |
| Aug 27, 2019 | Completed final sign-off Feb 2020 | 846 Divisadero St | Hertz Electric | to comply with accesible business entrance program ordinance 51-16. provide door operator. n/a for maherDetails
to comply with accesible business entrance program ordinance 51-16. provide door operator. n/a for maher | $4,400 |
| Jun 10, 2019 | Completed final sign-off Oct 2021 | 242 Powell St | remodel of (e) hotel guest room except rooms 2016, 207, 208 & 209 provide number of rooms with mobility & communication features. provide new meeting rooms on 2nd floor. add magnetic hold open device @ stair 2; floors 2-8. new reception counter ground floor lobbyDetails
remodel of (e) hotel guest room except rooms 2016, 207, 208 & 209 provide number of rooms with mobility & communication features. provide new meeting rooms on 2nd floor. add magnetic hold open device @ stair 2; floors 2-8. new reception counter ground floor lobby | $295,000 | |
| May 22, 2019 | Expired or cancelled cancelled Jan 2025 | 260 Page St | add one new studio dwelling unit withing the (e) bldg envelope @ the ground fl of apt bldg per ordinance 162-16. add bike parking & storage area @ (e) garage. remodel(e) storage room between lightwells including new foundation.provide fire sprinklers @ new dwelling @ ground fl under separate permit.Details
add one new studio dwelling unit withing the (e) bldg envelope @ the ground fl of apt bldg per ordinance 162-16. add bike parking & storage area @ (e) garage. remodel(e) storage room between lightwells including new foundation.provide fire sprinklers @ new dwelling @ ground fl under separate permit. | $145,000 | |
| Mar 6, 2019 | Completed final sign-off Jul 2019 | 161 Powell St | to comply with nov per complaint 201558411 convert (e) guestrooms bathrooms (217 thru 717) to common area bathrooms at residential hotel at floors 2 thru 7. unit count to remain the same maher naDetails
to comply with nov per complaint 201558411 convert (e) guestrooms bathrooms (217 thru 717) to common area bathrooms at residential hotel at floors 2 thru 7. unit count to remain the same maher na | $2,000 | |
| Feb 5, 2019 | Completed final sign-off Apr 2022 | 1785 San Jose Av | Unicon Construction Solutions Llc | demolish & remove (e) lower & upper wood decks & stairs @ rear of the blg.construct new deck @ 1st floor & stairs leading to 2nd fl @ rear of blg,new fire rated property line walls @ stair & deck.Details
demolish & remove (e) lower & upper wood decks & stairs @ rear of the blg.construct new deck @ 1st floor & stairs leading to 2nd fl @ rear of blg,new fire rated property line walls @ stair & deck. | $27,000 |
| Nov 27, 2018 | Completed final sign-off Oct 2021 | 242 Powell St | Level 8 Construction Inc | disabled access upgrade and combine guest toom #211 & #214 interior remodel at rooms #206, 207, 208 & 209. includingnew shower pan & surround, replacement of plm fixture and cosmetic work. sprinklers & gire alarm under sep permitDetails
disabled access upgrade and combine guest toom #211 & #214 interior remodel at rooms #206, 207, 208 & 209. includingnew shower pan & surround, replacement of plm fixture and cosmetic work. sprinklers & gire alarm under sep permit | $20,000 |
| Nov 15, 2018 | Never finaled issued Nov 2018, no final | 1278 Market St | Yerba Buena Builders Inc | install projecting double faced sign "rams" 1278-1298 marketDetails
install projecting double faced sign "rams" 1278-1298 market | $500 |
| Oct 5, 2018 | Completed final sign-off Oct 2018 | 2443 Lombard St | Bailey General Contracting Co Inc | removal of non-permitted partitions & showers per notice of violation #201115323. maher n/a.Details
removal of non-permitted partitions & showers per notice of violation #201115323. maher n/a. | |
| Sep 6, 2018 | Completed final sign-off Aug 2020 | 1785 San Jose Av | Alpha Construction Co *Stop Issusing* | interior remodel and legalizing of first flr bedroom, master bath and walk-in closets, voluntary seismic retrofit at first flrDetails
interior remodel and legalizing of first flr bedroom, master bath and walk-in closets, voluntary seismic retrofit at first flr | $97,000 |
| Sep 5, 2018 | Completed final sign-off Apr 2021 | 1653 Grant Av | J M K Construction Inc | residential: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809059142Details
residential: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. commercial pa #201809059142 | $273,318 |
| Sep 5, 2018 | Completed final sign-off Apr 2021 | 1653 Grant Av | J M K Construction Inc | commercial: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. partial disabled access upgrade at comercial space entrance. residential pa #201809059140Details
commercial: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. partial disabled access upgrade at comercial space entrance. residential pa #201809059140 | $21,682 |
| Aug 15, 2018 | Completed final sign-off Oct 2020 | 701 Union St | Bailey General Contracting Co Inc | commercial compliance with mandatory seismic retrofit per iebc chapter a4. disabled access upgrade at restaurant entrance and restroom triggered by soft story upgrade.Details
commercial compliance with mandatory seismic retrofit per iebc chapter a4. disabled access upgrade at restaurant entrance and restroom triggered by soft story upgrade. | $135,330 |
| Aug 15, 2018 | Completed final sign-off Oct 2020 | 701 Union St | Bailey General Contracting Co Inc | residential soft story retrofit per iebc chapter a4.Details
residential soft story retrofit per iebc chapter a4. | $214,000 |
| Aug 13, 2018 | Expired or cancelled expired Dec 2023 | 1353 Bush St | C B 2 Builders Incorporated | revision to app#200904166420 and 201510230696 to include a-2 occupancy at 1st floor cafe, modify 1st floor storefront and install clerestory windows, bsmnt remodel, install dumbwaiter, structural upgrades. life safety deferred.Details
revision to app#200904166420 and 201510230696 to include a-2 occupancy at 1st floor cafe, modify 1st floor storefront and install clerestory windows, bsmnt remodel, install dumbwaiter, structural upgrades. life safety deferred. | |
| Jul 11, 2018 | Never finaled issued Jul 2018, no final | 501 Folsom St | Yerba Buena Builders Inc | enlarge (e) 1st and 2nd flr restrooms. add 2 unisex shower at 1st flr. disabled access upgrades at path of travel incl entrance door push plates and elevator buttons, relocate intercom and card reader at (e) entrancesDetails
enlarge (e) 1st and 2nd flr restrooms. add 2 unisex shower at 1st flr. disabled access upgrades at path of travel incl entrance door push plates and elevator buttons, relocate intercom and card reader at (e) entrances | $175,000 |
| Nov 17, 2017 | Completed final sign-off Aug 2019 | 3423 19th St | Bai Construction | commercial: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4Details
commercial: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $30,000 |
| Nov 17, 2017 | Completed final sign-off Aug 2019 | 3423 19th St | Bai Construction | residential: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4Details
residential: soft story retrofit per sfebc chapter 4d:2016 cebc appendix a-4 | $90,000 |
| May 9, 2017 | Expired or cancelled expired Sep 2025 | 618 Baker St | Restoration Workshop Ltd | change of use. interior remodel of (e) attic flr of dwelling unit with the additin of 4 new dormers & walk-in closet & bathroom. refer to permit #201406067734 for legalizaiton of unit #1.Details
change of use. interior remodel of (e) attic flr of dwelling unit with the additin of 4 new dormers & walk-in closet & bathroom. refer to permit #201406067734 for legalizaiton of unit #1. | $85,000 |
| Feb 13, 2017 | Completed final sign-off Aug 2017 | 403 Arguello Bl | Extra Mile Construction | disabled access barrier remocal on the 3rd flr: addition of all gender disabled accessible bathroomDetails
disabled access barrier remocal on the 3rd flr: addition of all gender disabled accessible bathroom | $28,000 |
| Dec 28, 2016 | Completed final sign-off May 2017 | 261 32nd Av | Pacheco Builders Inc. | interior remodel of (e) 1st flr kitchen. range and new ventilation duct to roofDetails
interior remodel of (e) 1st flr kitchen. range and new ventilation duct to roof | $3,800 |
| Dec 20, 2016 | Never finaled issued Jan 2017, no final | 1171 Mission St | W E Lyons Construction Co | g/f- remodel (e) service facility include new restrooms, remodel (e) restrooms, new break room, exam room, isolation room, men's/women's small respite rooms, new nurse station & remodel (e) nurse station, new exterior security gates & fence at mission street. mep & life safety deferred.Details
g/f- remodel (e) service facility include new restrooms, remodel (e) restrooms, new break room, exam room, isolation room, men's/women's small respite rooms, new nurse station & remodel (e) nurse station, new exterior security gates & fence at mission street. mep & life safety deferred. | $300,000 |
| Nov 8, 2016 | Never finaled issued Nov 2016, no final | 1171 Mission St | W E Lyons Construction Co | remodel (e)social service facility,replace entrance doors @(e)location,new 1st flr restrooms w/showers @sleeping area,new first flr office & meeting room,new partitions,finishes,new wire mesh enclosure @basement,new disable accssble parking space,new unisex restrm near reception,infill (e)roll-upDetails
remodel (e)social service facility,replace entrance doors @(e)location,new 1st flr restrooms w/showers @sleeping area,new first flr office & meeting room,new partitions,finishes,new wire mesh enclosure @basement,new disable accssble parking space,new unisex restrm near reception,infill (e)roll-up | $180,000 |
| Sep 15, 2016 | Never finaled issued Feb 2017, no final | 1977 Union St | H & L Construction Inc | t.i. of (e) retail space, change of use from a 818 sq.ft. vacant retail use to non-formula retail ltd. restaurant @ g/f, new kitchen plumbing, new electrical outlets & light fixtures, disabled accessible upgrades at entrance, wider opening at kitchen and new disabled accessible unisex toilet room.Details
t.i. of (e) retail space, change of use from a 818 sq.ft. vacant retail use to non-formula retail ltd. restaurant @ g/f, new kitchen plumbing, new electrical outlets & light fixtures, disabled accessible upgrades at entrance, wider opening at kitchen and new disabled accessible unisex toilet room. | $74,000 |
| Apr 11, 2016 | Completed final sign-off Dec 2016 | 1325 Indiana St | Blue Mountain Construction Services Inc | water proofing renovations at decks on 42 decks(all decks except 103,112, 113, 114,213,316). doors and windows flashing only at units 116, 313, 314. provide 1 hour and 2 hour fire rated enclosures at 5 wall heaters units 104, 107, 204, 207, 215.Details
water proofing renovations at decks on 42 decks(all decks except 103,112, 113, 114,213,316). doors and windows flashing only at units 116, 313, 314. provide 1 hour and 2 hour fire rated enclosures at 5 wall heaters units 104, 107, 204, 207, 215. | $243,000 |
| Oct 23, 2015 | Expired or cancelled expired Dec 2023 | 1353 Bush St | Fowler Construction | revision to ref pa 2009-0416-6420: relocate cafe kitchen & serving area @ 1st, provide type 1 hood. reconfig music studios @ 1st & 2nd. reconfig 1st toilet rms, revise lighting plan, relo entrance ramp, relo bsmnt food storage, revise mech system @ 1st & 2nd including rooftop equip, add exhDetails
revision to ref pa 2009-0416-6420: relocate cafe kitchen & serving area @ 1st, provide type 1 hood. reconfig music studios @ 1st & 2nd. reconfig 1st toilet rms, revise lighting plan, relo entrance ramp, relo bsmnt food storage, revise mech system @ 1st & 2nd including rooftop equip, add exh | $10,000 |
| Oct 8, 2015 | Never finaled issued Oct 2015, no final | 1282 Market St | Yerba Buena Builders Inc | tenant improvement existng gr fl office space. new interior partitions for offices and workspaces, new suspended ceiling, new disabled access ramp, new womes accessible toilet rm, disabled access upgrade of existing mens toilet rm. no exterior changes lighting, mech & life safety under sep permtDetails
tenant improvement existng gr fl office space. new interior partitions for offices and workspaces, new suspended ceiling, new disabled access ramp, new womes accessible toilet rm, disabled access upgrade of existing mens toilet rm. no exterior changes lighting, mech & life safety under sep permt | $175,000 |
| Aug 12, 2015 | Completed final sign-off Jun 2016 | 261 32nd Av | new closet in entry hall of existing single family residenceDetails
new closet in entry hall of existing single family residence | $2,500 | |
| Feb 25, 2015 | Completed final sign-off May 2016 | 7 Clement St | Golden Vector Stars Corporation | disabled access barrier removal at entrances to 7 and 8 clement street including new level entrance and interior ramps.Details
disabled access barrier removal at entrances to 7 and 8 clement street including new level entrance and interior ramps. | $26,000 |
| Nov 12, 2014 | Completed final sign-off Jun 2017 | 260 Page St | add 2 new studio dwg units w/in (e) bldg envelope at the 1/f of a 9 unit apt bldg. seismic upgrade per sf soft story ordinance 54-10. provide new roof deck above (e) garage at lily st. and reframe garage roof. provide new hallwy fr 1/f lobby to new dwg units. add bicycle parking at garageDetails
add 2 new studio dwg units w/in (e) bldg envelope at the 1/f of a 9 unit apt bldg. seismic upgrade per sf soft story ordinance 54-10. provide new roof deck above (e) garage at lily st. and reframe garage roof. provide new hallwy fr 1/f lobby to new dwg units. add bicycle parking at garage | $165,000 | |
| Oct 21, 2014 | Never finaled issued Oct 2014, no final | 46 Rausch St | Angotti & Reilly Inc. | interior remodel of (e) 2nd flr unit including new bathrm, kitchen remodle, rear bath remodel, replace window @ porch (3 total), remove rear stairs to 2nd flr & infill flr, remove int walls at rear, new closets @ (e) room, new laundry rm, new lighting, new gas furnace & water heater.Details
interior remodel of (e) 2nd flr unit including new bathrm, kitchen remodle, rear bath remodel, replace window @ porch (3 total), remove rear stairs to 2nd flr & infill flr, remove int walls at rear, new closets @ (e) room, new laundry rm, new lighting, new gas furnace & water heater. | $160,000 |
| Feb 7, 2014 | Expired or cancelled withdrawn May 2014 | 518 Castro St | Centerpoint Construction Management Serv | revisioin to pa# 2013/11/12/1689. no change of use. proposed work is for pharmacy & ralated storage only.Details
revisioin to pa# 2013/11/12/1689. no change of use. proposed work is for pharmacy & ralated storage only. | |
| Dec 30, 2013 | Never finaled issued Jan 2014, no final | 680 08th St | Yerba Buena Builders Inc | new signage on existing awningDetails
new signage on existing awning | $1,000 |
| Dec 30, 2013 | Completed final sign-off Mar 2014 | 680 08th St | Yerba Buena Builders Inc | to erect electric wall signDetails
to erect electric wall sign | $13,000 |
| Oct 31, 2013 | Completed final sign-off Jun 2014 | 875 Post St | revision to 200712311569 vacant ground floor plans recessed interior wall & slab, per nov, issued 10/4/13 201328561.Details
revision to 200712311569 vacant ground floor plans recessed interior wall & slab, per nov, issued 10/4/13 201328561. | $1,000 | |
| Oct 25, 2013 | Never finaled issued Oct 2013, no final | 680 08th St | Yerba Buena Builders Inc | t.i. of extg wholesale showroom space #155 to be used as domestic appliance showroom. work includes new non bearing, not rated partitions, lighting, 2 working demonstration kitchens and active laundry desplay, level extg floors and soffit above hood display. mechanical under separate permit.Details
t.i. of extg wholesale showroom space #155 to be used as domestic appliance showroom. work includes new non bearing, not rated partitions, lighting, 2 working demonstration kitchens and active laundry desplay, level extg floors and soffit above hood display. mechanical under separate permit. | $400,000 |
| Sep 4, 2013 | Completed final sign-off Feb 2014 | 355 Hayes St | Egan Agape Construction | t.i @2nd fl include remove/new partitions, kitchen remodel for disabled access, new disabled accessible drinking fountain, new disabled accessible doors to 2nd fl deck. outswinging doors at 2nd fl restrooms & new high low buttons at power assist door at main entrance at ground fl. change 2b to 3b.Details
t.i @2nd fl include remove/new partitions, kitchen remodel for disabled access, new disabled accessible drinking fountain, new disabled accessible doors to 2nd fl deck. outswinging doors at 2nd fl restrooms & new high low buttons at power assist door at main entrance at ground fl. change 2b to 3b. | $110,000 |
| Aug 8, 2013 | Never finaled issued Aug 2013, no final | 680 08th St | Yerba Buena Builders Inc | disabled access path of travel barrier removal at g/f including main entrance east side, parking lot entrance, ramp at parking lot, 3 disabled accessible parking spaces, exterior directional signs, ground floor mens & womens toilet rooms and drinking fountain.Details
disabled access path of travel barrier removal at g/f including main entrance east side, parking lot entrance, ramp at parking lot, 3 disabled accessible parking spaces, exterior directional signs, ground floor mens & womens toilet rooms and drinking fountain. | $29,000 |
| May 20, 2013 | Completed final sign-off Dec 2015 | 384 11th Av | Rinaldi Construction | change of use from dental office to single family residential. at 2nd floor - demolish non-structural partition at (e) sterilization room & remove interior glazing & partition below glazing at (e) waiting room. add kitchen and one bath. provide stair enclosure.Details
change of use from dental office to single family residential. at 2nd floor - demolish non-structural partition at (e) sterilization room & remove interior glazing & partition below glazing at (e) waiting room. add kitchen and one bath. provide stair enclosure. | $8,000 |
| Apr 22, 2013 | Expired or cancelled cancelled Sep 2023 | 838 Pacific Av | upgrade fire alarm system with new programmed fire alarm panel & new fire alarm annunciator panel, new horn/strobes to replace existing horn/strobes or bells, new pull stations to replace existing pull stations & new smoke detectors to replace existing.Details
upgrade fire alarm system with new programmed fire alarm panel & new fire alarm annunciator panel, new horn/strobes to replace existing horn/strobes or bells, new pull stations to replace existing pull stations & new smoke detectors to replace existing. | $80,000 | |
| Apr 22, 2013 | Expired or cancelled cancelled Sep 2023 | 895 Pacific Av | upgrade fire alarm system with new programmed fire alarm panel & new fire alarm annunciator panel, new horn/strobes to replace existing horn/strobes or bells, new pull stations to replace existing pull stations & new smoke detectors to replace existing.Details
upgrade fire alarm system with new programmed fire alarm panel & new fire alarm annunciator panel, new horn/strobes to replace existing horn/strobes or bells, new pull stations to replace existing pull stations & new smoke detectors to replace existing. | $30,000 | |
| Apr 22, 2013 | Expired or cancelled cancelled Sep 2023 | 711 Pacific Av | upgrade fire alarm system with new programmed fire alarm panel & new fire alarm annunciator panel, new horn/strobes to replace existing horn/strobes or bells, new pull stations to replace existing pull stations & new smoke detectors to replace existing.Details
upgrade fire alarm system with new programmed fire alarm panel & new fire alarm annunciator panel, new horn/strobes to replace existing horn/strobes or bells, new pull stations to replace existing pull stations & new smoke detectors to replace existing. | $50,000 | |
| Apr 22, 2013 | Expired or cancelled cancelled Sep 2023 | 655 Pacific Av | upgrade fire alarm system with new programmed fire alarm panel & new fire alarm annunciator panel, new horn/strobes to replace existing horn/strobes or bells, new pull stations to replace existing pull stations & new smoke detectors to replace existing.Details
upgrade fire alarm system with new programmed fire alarm panel & new fire alarm annunciator panel, new horn/strobes to replace existing horn/strobes or bells, new pull stations to replace existing pull stations & new smoke detectors to replace existing. | $30,000 | |
| Oct 5, 2012 | Completed final sign-off Feb 2013 | 65 09th St | Angotti & Reilly Inc. | remodel of existing ground floor food preparation area & 2nd floor offices, add 2 private offices at 2nd floor work includes new partitions, new lighting, new cabinets, mechanical, disabled access signs. no structural work.Details
remodel of existing ground floor food preparation area & 2nd floor offices, add 2 private offices at 2nd floor work includes new partitions, new lighting, new cabinets, mechanical, disabled access signs. no structural work. | $51,000 |
| Jun 27, 2012 | Expired or cancelled expired Dec 2023 | 1353 Bush St | House To Home Remodeling | revision to pa# 2009-0416-6420 - new concrete infill wall at (e) basement vault, exterior wall at electrical room at bush street.Details
revision to pa# 2009-0416-6420 - new concrete infill wall at (e) basement vault, exterior wall at electrical room at bush street. | $3,200 |
| Jun 7, 2012 | Completed final sign-off Sep 2012 | 555 04th St | Yerba Buena Builders Inc | t.i of (e)vacant retail space for art gallery (change of use m to a). includes new non-rated partitions, new storefront entry doors at (e) location, new topping slab at floor, (n)mezz stair,toilet room, kitchenette, storage and office. sprinkler, mech, fire alarm sep permit.Details
t.i of (e)vacant retail space for art gallery (change of use m to a). includes new non-rated partitions, new storefront entry doors at (e) location, new topping slab at floor, (n)mezz stair,toilet room, kitchenette, storage and office. sprinkler, mech, fire alarm sep permit. | $145,000 |
| May 23, 2012 | Completed final sign-off Oct 2012 | 680 08th St | Yerba Buena Builders Inc | space #163-correction of notice of violation #200839192 for (e) wholesale-retail door showroom. work includes non bearing partitons, lighting, disabled access upgrade at restrooms. new display cooktop/kitchette. no change to mechanical, no structural work. fire sprinkler under seperate permitDetails
space #163-correction of notice of violation #200839192 for (e) wholesale-retail door showroom. work includes non bearing partitons, lighting, disabled access upgrade at restrooms. new display cooktop/kitchette. no change to mechanical, no structural work. fire sprinkler under seperate permit | $156,700 |
| May 21, 2012 | Expired or cancelled expired Jan 2014 | 2005 Green St | Pioneer Builders | side yard improvements at east side including retaining walls, landscaping, drainage, paved walkways & stairs. relocate (e) gate & guardrails & handrailsDetails
side yard improvements at east side including retaining walls, landscaping, drainage, paved walkways & stairs. relocate (e) gate & guardrails & handrails | $29,000 |
| Feb 17, 2012 | Completed final sign-off Mar 2012 | 150 Valencia St | Angotti & Reilly Inc. | refer to pa# 2012-0124-2771-add steel stringers at (e) roof trusses for light fixture supportDetails
refer to pa# 2012-0124-2771-add steel stringers at (e) roof trusses for light fixture support | $6,500 |
| Jan 24, 2012 | Completed final sign-off Mar 2012 | 150 Valencia St | Angotti & Reilly Inc. | new disabled accessible entrance at west side of existing 2nd level entrance from elgin park. no change to mech. no structrual work. new emergency lighting, exit signs, and electerical outlets. lighting under sep permit.Details
new disabled accessible entrance at west side of existing 2nd level entrance from elgin park. no change to mech. no structrual work. new emergency lighting, exit signs, and electerical outlets. lighting under sep permit. | $28,500 |
| Nov 8, 2011 | Completed final sign-off Feb 2012 | 3150 24th St | t.i. of (e) vacant fast food restaurant space for new fast food restaurant-work includes new low partitions in dining room, removal of tile floor & suspended acoustical ceiling in dining room. new disabled accessible entrance & services counter. lighting under seperate permit, no structural work, noDetails
t.i. of (e) vacant fast food restaurant space for new fast food restaurant-work includes new low partitions in dining room, removal of tile floor & suspended acoustical ceiling in dining room. new disabled accessible entrance & services counter. lighting under seperate permit, no structural work, no | $32,000 | |
| Apr 29, 2011 | Completed final sign-off Oct 2012 | 2005 Green St | Pioneer Builders | remodel of existing ground floor dwelling unit, relocate kitchen & remodel bath. voluntary lateral strengthening of ground floor, new radiant heating system & floor slab, new lighting. remove & replace wood siding at ground floor front for seismic - in kind.Details
remodel of existing ground floor dwelling unit, relocate kitchen & remodel bath. voluntary lateral strengthening of ground floor, new radiant heating system & floor slab, new lighting. remove & replace wood siding at ground floor front for seismic - in kind. | $135,000 |
| Dec 23, 2010 | Expired or cancelled cancelled Mar 2012 | 1 Clement St | disabled access barrier remval at existing public sidewalk for gr floor entrances on clement street. all work in public right of way for documentation purposes.Details
disabled access barrier remval at existing public sidewalk for gr floor entrances on clement street. all work in public right of way for documentation purposes. | ||
| Nov 17, 2010 | Completed final sign-off Feb 2011 | 1737 Post St | Yerba Buena Builders Inc | tenant improvment of existing vacant retail space into new retail bakery at suite 383. disabled access upgrade to path of travel. no structural work. no change to lighting and mechDetails
tenant improvment of existing vacant retail space into new retail bakery at suite 383. disabled access upgrade to path of travel. no structural work. no change to lighting and mech | $18,465 |
| Nov 12, 2010 | Completed final sign-off Apr 2011 | 5240 Geary Bl | Behnam And Associates | ground floor - new elevator machine room at existng storage room to replace existing machine room. disabled access upgrades at existing elevator.Details
ground floor - new elevator machine room at existng storage room to replace existing machine room. disabled access upgrades at existing elevator. | $86,000 |
| May 5, 2010 | Expired or cancelled cancelled Apr 2012 | 2035 Thomas Av | vertical & horizontal addtion . remodel(e) 2 story single family home. work includes new rear deck, relocate laundry room to 2nd floor. remodel 2nd foor bathroom & bedrooms, new interior stair , add bedroom, study & bath at 3rd floor.Details
vertical & horizontal addtion . remodel(e) 2 story single family home. work includes new rear deck, relocate laundry room to 2nd floor. remodel 2nd foor bathroom & bedrooms, new interior stair , add bedroom, study & bath at 3rd floor. | $260,000 | |
| Mar 8, 2010 | Completed final sign-off Jun 2010 | 3423 19th St | Yes Construction | to comply with nov# 200848212 dated march 4, 2008 for documentation of (e) first floor plan showing (e) kitchen area within existing retail space. remove (e) front gate.Details
to comply with nov# 200848212 dated march 4, 2008 for documentation of (e) first floor plan showing (e) kitchen area within existing retail space. remove (e) front gate. | $10,000 |
| Jan 22, 2010 | Completed final sign-off Jul 2010 | 340 Bryant St | to comply w/nov #9800751 - demo non bearing wood stud partitions, per ab-017, no other workDetails
to comply w/nov #9800751 - demo non bearing wood stud partitions, per ab-017, no other work | $3,500 | |
| Sep 17, 2009 | Completed final sign-off Dec 2009 | 2060 Chestnut St | Angotti & Reilly Inc. | new storefront at existing vacant retail bldg including new concrete curb, steel beam above storefront, concrete landing at entry, cement plaster at facade & roof insulation.Details
new storefront at existing vacant retail bldg including new concrete curb, steel beam above storefront, concrete landing at entry, cement plaster at facade & roof insulation. | $60,000 |
| Apr 16, 2009 | Expired or cancelled expired Dec 2023 | 1353 Bush St | House To Home Remodeling | remodel (e) 1st & 2nd flrs vacant comm space & portion of occupied basemnt. 1st fl to be music studios, 49 seat cafe. 2nd fl to be music studios, new disabled accessible entrance & toilet rms, structural, electrical & mechanical work included. fire sprinklers,electrical & lighting under seperate perDetails
remodel (e) 1st & 2nd flrs vacant comm space & portion of occupied basemnt. 1st fl to be music studios, 49 seat cafe. 2nd fl to be music studios, new disabled accessible entrance & toilet rms, structural, electrical & mechanical work included. fire sprinklers,electrical & lighting under seperate per | $400,000 |
| Mar 25, 2009 | Completed final sign-off May 2009 | 2728 Hyde St | interior remodel of ground floor looby of (e) office building. no exterior work.Details
interior remodel of ground floor looby of (e) office building. no exterior work. | $30,000 | |
| Jan 29, 2009 | Never finaled issued Jun 2009, no final | 1862 15th Av | Donald Lewis Gen. Contr.Inc. | remodel of 2nd floor of extg dwelling including remodel of 2 bathrooms. install new wndws and doors at master bedroom and closet at master bedroom. replace extg exterior rear stair. install new footing at south wall of master bedroom.Details
remodel of 2nd floor of extg dwelling including remodel of 2 bathrooms. install new wndws and doors at master bedroom and closet at master bedroom. replace extg exterior rear stair. install new footing at south wall of master bedroom. | $72,000 |
| Jun 18, 2008 | Completed final sign-off Oct 2008 | 875 Post St | to correct nov# 200857957. remove new framing at rear of ground floor of residential hotel at 2 (e) guest rooms. new opening between units to be filled in & removed door to be reinstalled at guest room where opening infilled. portions of the work are included in pa# 2007/12/31/1569 & will remainDetails
to correct nov# 200857957. remove new framing at rear of ground floor of residential hotel at 2 (e) guest rooms. new opening between units to be filled in & removed door to be reinstalled at guest room where opening infilled. portions of the work are included in pa# 2007/12/31/1569 & will remain | $2,000 |