John Dal Pino
- Listed as
- engineer
- Firm
- Degenkolb
- Based in
- San Francisco
- On San Francisco permits
- Nov 2007 to Aug 2019
6 permits since 2000 (engineer on 6 permits): 6 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 5, 2019 | Completed final sign-off Aug 2019 | 453 Union St | Eric Wong | revision to pa 201707273050 & 201707273051 for final inspection (soft story)Details
revision to pa 201707273050 & 201707273051 for final inspection (soft story) | |
| Aug 15, 2018 | Completed final sign-off Oct 2020 | 701 Union St | Bailey General Contracting Co Inc | commercial compliance with mandatory seismic retrofit per iebc chapter a4. disabled access upgrade at restaurant entrance and restroom triggered by soft story upgrade.Details
commercial compliance with mandatory seismic retrofit per iebc chapter a4. disabled access upgrade at restaurant entrance and restroom triggered by soft story upgrade. | $135,330 |
| Jan 18, 2018 | Completed final sign-off Feb 2021 | 3449 Pacific Av | Robison Nieri White Construction | voluntary partial seismic upgrade, replace stucco in-kind as needed at front facade. match facade details to (e)Details
voluntary partial seismic upgrade, replace stucco in-kind as needed at front facade. match facade details to (e) | $80,000 |
| Jan 19, 2017 | Completed final sign-off Jun 2017 | 3800 18th St | Mulhall Construction Inc. | soft story retrofit per sfbc chapter 34b engineering criteria: 2016 iebc appendix a-4.Details
soft story retrofit per sfbc chapter 34b engineering criteria: 2016 iebc appendix a-4. | $175,000 |
| Apr 29, 2009 | Completed final sign-off Dec 2009 | 1131 Folsom St | Robison Nieri White Construction | revision to appl #200608290828 - second floor joist modification @ light court.Details
revision to appl #200608290828 - second floor joist modification @ light court. | |
| Nov 16, 2007 | Completed final sign-off May 2008 | 1430 Van Ness Av | Robison Nieri White Construction | seismic strengthening, new concrete frame @ front entrance, strengthening concrete walls on sides of bldg. ,infill 2 existing skylightsDetails
seismic strengthening, new concrete frame @ front entrance, strengthening concrete walls on sides of bldg. ,infill 2 existing skylights | $150,000 |