Robison Nieri White Construction
- Based in
- So. San Francisco
- On San Francisco permits
- Aug 2002 to May 2026
- Last 24 months
- 3 permits filed
244 permits since 2000: 221 completed, 10 never finaled, 13 expired or cancelled.
Of the 10 never-finaled permits, 3 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 244.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 8, 2026 | Completed final sign-off May 2026 | 1090 Chestnut St | changeout wall hung toilets in master bathroom and powder room, replace in same location with new electrical plug at each toilet.Details
changeout wall hung toilets in master bathroom and powder room, replace in same location with new electrical plug at each toilet. | $2,500 |
| Jan 14, 2026 | Completed final sign-off Apr 2026 | 239 Brannan St | unit 16a; remodel primary bathroom. replace all existing plumbing fixtures with new in same location. replace existing fan with new same location. new tile, countertop and paint. no structural work. like for like.Details
unit 16a; remodel primary bathroom. replace all existing plumbing fixtures with new in same location. replace existing fan with new same location. new tile, countertop and paint. no structural work. like for like. | $50,000 |
| Jun 26, 2025 | Completed final sign-off May 2026 | 1090 Chestnut St | 5th/fl: (unit#5) interior non structural remodel: a) remodel bedroom#3 and closet b) relocate bathroom#3 and laudry c) (n) finishes,fixtures, and fittings in bath #2 and #3. d) (n) led lighting in baths and home office.Details
5th/fl: (unit#5) interior non structural remodel: a) remodel bedroom#3 and closet b) relocate bathroom#3 and laudry c) (n) finishes,fixtures, and fittings in bath #2 and #3. d) (n) led lighting in baths and home office. | $98,000 |
| Sep 27, 2024 | Completed final sign-off Mar 2026 | 1090 Chestnut St | unit #4 interior non structural remodel: remodel kitchen, remodel & reconfigure 5 bathrooms. all (n) interior finishes to replace existing finishesDetails
unit #4 interior non structural remodel: remodel kitchen, remodel & reconfigure 5 bathrooms. all (n) interior finishes to replace existing finishes | $350,786 |
| Aug 20, 2024 | Completed final sign-off Jul 2025 | 188 Minna St | unit 28a- interior remodel kitchen with new cabinets, counter tops and appliances. replace cabinet fixtures and finsihes in 3x bathrooms. new hardwood floors and painting.Details
unit 28a- interior remodel kitchen with new cabinets, counter tops and appliances. replace cabinet fixtures and finsihes in 3x bathrooms. new hardwood floors and painting. | $220,000 |
| Apr 29, 2024 | Completed final sign-off Oct 2024 | 219 Brannan St | remodel primary bathroom: remove and repalce in same locations all plumbing fixtures. remove and replace in same locations fan and light fixtures, new tile in shower, shower floor and main bathroom floor. tape and paint. no structural work.Details
remodel primary bathroom: remove and repalce in same locations all plumbing fixtures. remove and replace in same locations fan and light fixtures, new tile in shower, shower floor and main bathroom floor. tape and paint. no structural work. | $25,000 |
| Feb 5, 2024 | Completed final sign-off Oct 2024 | 239 Brannan St | interior non structural alteration. remove (e) non structural wall between (e) living and (e) bedroom #2. remodel (e) kitchen and paint cabinets. remodel (2) bathrooms. (n) led lighting and electrical modificaitons. (n) finishes to replace (e) finishes.Details
interior non structural alteration. remove (e) non structural wall between (e) living and (e) bedroom #2. remodel (e) kitchen and paint cabinets. remodel (2) bathrooms. (n) led lighting and electrical modificaitons. (n) finishes to replace (e) finishes. | $62,000 |
| Apr 7, 2023 | Completed final sign-off Sep 2023 | 1333 Jones St | new countertops in kitchen, reinstall kitchen sink after new countertops are installed. new vanity countertop in guest bathroom. install 4 sconces in livingroom. new switches and plates in livngroom. kitchen & guest bedroom. new hardwood flooring in livingroom, den, and kitchen, painting in sameDetails
new countertops in kitchen, reinstall kitchen sink after new countertops are installed. new vanity countertop in guest bathroom. install 4 sconces in livingroom. new switches and plates in livngroom. kitchen & guest bedroom. new hardwood flooring in livingroom, den, and kitchen, painting in same | $30,000 |
| Mar 6, 2023 | Completed final sign-off Aug 2023 | 1750 Taylor St | remodel master bathroom. new stone top for (e) vanity tile. new stone slab for shower walls. replace (e) sconces and eiling can lights with new. paint throughout unit. no structural work.Details
remodel master bathroom. new stone top for (e) vanity tile. new stone slab for shower walls. replace (e) sconces and eiling can lights with new. paint throughout unit. no structural work. | $80,000 |
| Mar 6, 2023 | Completed final sign-off Aug 2023 | 219 Brannan St | remodel master and guest bathrooms. replace (e) tile with new tile. vanities and vanity tops to remain. replace (e) can lights and plumbing fixtures with new. refinish (e) hardwood floors. paint throughout unit. no structural work.Details
remodel master and guest bathrooms. replace (e) tile with new tile. vanities and vanity tops to remain. replace (e) can lights and plumbing fixtures with new. refinish (e) hardwood floors. paint throughout unit. no structural work. | $90,000 |
| Jan 9, 2023 | Completed final sign-off Mar 2024 | 1333 Jones St | unit 1010: remove/replace (e) w/new in in kitchen same locations, cabinets, cntrtop,plumb,elec fix, primary/guest baths. same locations vanity,top, elec/plumb fixtures,tile,paint. hardwood floors kitchen,dr,lr,entry hall approx 1000 sf. no structural/walls removedDetails
unit 1010: remove/replace (e) w/new in in kitchen same locations, cabinets, cntrtop,plumb,elec fix, primary/guest baths. same locations vanity,top, elec/plumb fixtures,tile,paint. hardwood floors kitchen,dr,lr,entry hall approx 1000 sf. no structural/walls removed | $250,000 |
| Jan 9, 2023 | Completed final sign-off May 2023 | 229 Brannan St | unit 17d: guest bathroom, new tile on walls and floor. misc paint. no structural workDetails
unit 17d: guest bathroom, new tile on walls and floor. misc paint. no structural work | $12,000 |
| Oct 18, 2022 | Completed final sign-off May 2023 | 229 Brannan St | remodel 2 bathrooms: remove old replace new in existing locations; plumbing fixtures; fans; light fixtures, switches and plates; vanities and tops; shower door and enclosures; tile and paint. no structural work.Details
remodel 2 bathrooms: remove old replace new in existing locations; plumbing fixtures; fans; light fixtures, switches and plates; vanities and tops; shower door and enclosures; tile and paint. no structural work. | $75,000 |
| Feb 24, 2022 | Completed final sign-off Dec 2022 | 229 Brannan St | unit #14e: interior alteration. reduce pantry closet. remove closet in meddia room.Details
unit #14e: interior alteration. reduce pantry closet. remove closet in meddia room. | $8,000 |
| Jan 14, 2022 | Completed final sign-off Aug 2022 | 1080 Chestnut St | guest bath remodel: remove old and replace in same location vanity, stovetop, tile, electrical and plumbing fixtures. no structural work.Details
guest bath remodel: remove old and replace in same location vanity, stovetop, tile, electrical and plumbing fixtures. no structural work. | $45,000 |
| May 19, 2021 | Completed final sign-off Dec 2021 | 1170 Sacramento St | unit #10a: remove (e) track lighting, patch repair demo scars. replace (e) sink/vanity at powder room in kind. remove linen cabinet. (n) custom decorative mentel & install tv on wall.Details
unit #10a: remove (e) track lighting, patch repair demo scars. replace (e) sink/vanity at powder room in kind. remove linen cabinet. (n) custom decorative mentel & install tv on wall. | $40,000 |
| May 4, 2021 | Completed final sign-off Sep 2022 | 1170 Sacramento St | #6b:new wall finishes and fixtures at (e) shower in (e) main bath. new tub/shower/vanity & associated fixtures and finishes at guest bathroom. new toilet/vanity and associated fixtures & finishes at powder room. relocate (e) valves & new electrical for new washer/dryer at (e) locationsDetails
#6b:new wall finishes and fixtures at (e) shower in (e) main bath. new tub/shower/vanity & associated fixtures and finishes at guest bathroom. new toilet/vanity and associated fixtures & finishes at powder room. relocate (e) valves & new electrical for new washer/dryer at (e) locations | $18,000 |
| Jan 29, 2021 | Completed final sign-off Sep 2022 | 1090 Chestnut St | unit #12: rev to pa202007019466: entry door rating updated per approved pre-app meeting.Details
unit #12: rev to pa202007019466: entry door rating updated per approved pre-app meeting. | |
| Dec 10, 2020 | Completed final sign-off Jul 2021 | 219 Brannan St | remodel e bath in like kind. replace e fixtures and finishes with newDetails
remodel e bath in like kind. replace e fixtures and finishes with new | $15,800 |
| Sep 23, 2020 | Completed final sign-off Feb 2021 | 79 Valley St | renew permit application #201701177271 for final inspectionDetails
renew permit application #201701177271 for final inspection | |
| Jul 1, 2020 | Completed final sign-off Sep 2022 | 1090 Chestnut St | unit #12: addition to pa #2019-0614-3421. proposed scope includes relocating non-structural interior walls. new hvac equipment. repair/replace window glazing in (e) frame. no exterior work. no structural.Details
unit #12: addition to pa #2019-0614-3421. proposed scope includes relocating non-structural interior walls. new hvac equipment. repair/replace window glazing in (e) frame. no exterior work. no structural. | $350,000 |
| Jan 15, 2020 | Completed final sign-off May 2022 | 1090 Chestnut St | interior non-structureal remodeling remodel kitchen, remodel/ reconfigure 3-bathroom and 1 power rooom, all new interior finishes to replace (e) finishesDetails
interior non-structureal remodeling remodel kitchen, remodel/ reconfigure 3-bathroom and 1 power rooom, all new interior finishes to replace (e) finishes | $210,000 |
| Aug 26, 2019 | Completed final sign-off Jul 2020 | 1333 Jones St | kitchen remodel: remove existing and replace with new in same location cabinets,countertops, plumbing and electrical fixtures. bathroom remodel: remove existing and replace with new in same location vanity, top, electrical and plumbing fixtures, tile, paint throughout.hardwood floors throuhout.n.s.wDetails
kitchen remodel: remove existing and replace with new in same location cabinets,countertops, plumbing and electrical fixtures. bathroom remodel: remove existing and replace with new in same location vanity, top, electrical and plumbing fixtures, tile, paint throughout.hardwood floors throuhout.n.s.w | $150,000 |
| Aug 1, 2019 | Completed final sign-off Mar 2021 | 1090 Chestnut St | complete remodel of entire unit 11. kitchen, baths, dining, bedrooms, add 1/2 bath. cabinets, fixtures. no structural or exterior work ref 201805229742 (kitchen remodel) maher not reqDetails
complete remodel of entire unit 11. kitchen, baths, dining, bedrooms, add 1/2 bath. cabinets, fixtures. no structural or exterior work ref 201805229742 (kitchen remodel) maher not req | $100,000 |
| Jun 14, 2019 | Completed final sign-off Sep 2022 | 1090 Chestnut St | all work#12:kitchen romodel: remove existing and replace with new in same location cabinets, stone countertop, plumbing and electrical fixtrues, master bathroom,(2)guest bathroom and powder room remodel:replace in same location vanities, stonetop,electrical and plumbing fixtures, no structural work.Details
all work#12:kitchen romodel: remove existing and replace with new in same location cabinets, stone countertop, plumbing and electrical fixtrues, master bathroom,(2)guest bathroom and powder room remodel:replace in same location vanities, stonetop,electrical and plumbing fixtures, no structural work. | $350,000 |
| Jun 14, 2019 | Completed final sign-off Oct 2020 | 1738 Lombard St | unit 8: remodel two guest bathrooms, remove existing and replace with new in same locations vanities, counter tops, tile, electrical and plumbing fixtures. existing floor to remain. paint, no structural work.Details
unit 8: remodel two guest bathrooms, remove existing and replace with new in same locations vanities, counter tops, tile, electrical and plumbing fixtures. existing floor to remain. paint, no structural work. | $50,000 |
| Jun 12, 2019 | Completed final sign-off Sep 2020 | 229 Brannan St | master bedroom: sheetrock patch after installation of recessed light fixtures in ceiling. faint where patched. no structural work. replace in-kind. maintain fire-ratingDetails
master bedroom: sheetrock patch after installation of recessed light fixtures in ceiling. faint where patched. no structural work. replace in-kind. maintain fire-rating | $7,000 |
| Jun 6, 2019 | Never finaled issued Jun 2019, no final | 1090 Chestnut St | street spaceDetails
street space | |
| Nov 21, 2018 | Never finaled issued Nov 2018, no final | 1333 Jones St | street spaceDetails
street space | |
| Oct 5, 2018 | Completed final sign-off May 2019 | 219 Brannan St | master bath: new tiles on shower walls and floor. new vanity and stone top. guest bath: new tiles on floor only. new vanity and top. new switches and plugs. paint throughout unit. hardwood floors throughout except for master and guest bathrooms. no structural work. maher n/aDetails
master bath: new tiles on shower walls and floor. new vanity and stone top. guest bath: new tiles on floor only. new vanity and top. new switches and plugs. paint throughout unit. hardwood floors throughout except for master and guest bathrooms. no structural work. maher n/a | $75,000 |
| Aug 1, 2018 | Completed final sign-off Mar 2019 | 1333 Jones St | remodel: kitchen 12'x12', master bathroom 9'x9',front door, hardwood floors, finishesDetails
remodel: kitchen 12'x12', master bathroom 9'x9',front door, hardwood floors, finishes | $103,000 |
| May 22, 2018 | Completed final sign-off Jun 2018 | 219 Brannan St | ste 18a: install recessed lighting in three bedrooms, no structural work. lighting comply with cec 150k. maher naDetails
ste 18a: install recessed lighting in three bedrooms, no structural work. lighting comply with cec 150k. maher na | $16,500 |
| May 22, 2018 | Completed final sign-off Mar 2021 | 1090 Chestnut St | ste 11: kitchen remodel, remove and replace with new in same locations cabinets, stone counter tops, plumbing & elelctrical fixtures. master bath, guest bath and powder room remodel. remove old and replace with new in same locations vanities, stone tops, tile, electrical and plumbing fixtures.Details
ste 11: kitchen remodel, remove and replace with new in same locations cabinets, stone counter tops, plumbing & elelctrical fixtures. master bath, guest bath and powder room remodel. remove old and replace with new in same locations vanities, stone tops, tile, electrical and plumbing fixtures. | $250,000 |
| May 4, 2018 | Completed final sign-off Jul 2018 | 229 Brannan St | unit 8g: new kitchen countertop & deck splash, new tile flooring; guest bath: remove/replace w/new in same locations, vanity, stovetop, medicine cabinet, tile, electrical & plumbing, fixtures. no structural work.Details
unit 8g: new kitchen countertop & deck splash, new tile flooring; guest bath: remove/replace w/new in same locations, vanity, stovetop, medicine cabinet, tile, electrical & plumbing, fixtures. no structural work. | $25,000 |
| May 4, 2018 | Never finaled issued May 2018, no final | 2164 Hyde St | unit 611: master bath remodel, remove/replace w/new in same locations, vanity, stove top, medicine cabinet, tile, electrical & plumbing fixtures, paint. no structural work.Details
unit 611: master bath remodel, remove/replace w/new in same locations, vanity, stove top, medicine cabinet, tile, electrical & plumbing fixtures, paint. no structural work. | $25,000 |
| Feb 6, 2018 | Completed final sign-off Feb 2021 | 3449 Pacific Av | basement: repairs due to water damage, insulation, cabinetry; taping/painting; 1/f kitchen, bar, bath/powder rms; remove/replace same locations, finishes, plumbing fixtures/electrical, tile, flooring; 2/f: master & guest baths, remove/relocation same locations, vanities, plumbing, electrical, tile,Details
basement: repairs due to water damage, insulation, cabinetry; taping/painting; 1/f kitchen, bar, bath/powder rms; remove/replace same locations, finishes, plumbing fixtures/electrical, tile, flooring; 2/f: master & guest baths, remove/relocation same locations, vanities, plumbing, electrical, tile, | $250,000 |
| Jan 18, 2018 | Completed final sign-off Feb 2021 | 3449 Pacific Av | voluntary partial seismic upgrade, replace stucco in-kind as needed at front facade. match facade details to (e)Details
voluntary partial seismic upgrade, replace stucco in-kind as needed at front facade. match facade details to (e) | $80,000 |
| Dec 27, 2017 | Completed final sign-off Dec 2018 | 1 Hawthorne St | hang new owner supplied barn door at (e) opening to bedroom. no structural workDetails
hang new owner supplied barn door at (e) opening to bedroom. no structural work | $2,500 |
| Nov 2, 2017 | Completed final sign-off Jul 2018 | 1170 Sacramento St | remodel four baths. all fixtures to remain in e locations. new plumbing fixtures, vanities, stonetops, tile and paint. kitchen remodel. all fixtures to remain in existing locations. new plumbing fixtures, cabinets, countertops, hood and hardwood flooring. no structural workDetails
remodel four baths. all fixtures to remain in e locations. new plumbing fixtures, vanities, stonetops, tile and paint. kitchen remodel. all fixtures to remain in existing locations. new plumbing fixtures, cabinets, countertops, hood and hardwood flooring. no structural work | $350,000 |
| Oct 30, 2017 | Completed final sign-off Aug 2018 | 1635 Chestnut St | removal of middle posts at garage level; seismic upgrade for existing garage level; new living rm/powder rm at rear of garage to replace e storage rm and e toilet rmDetails
removal of middle posts at garage level; seismic upgrade for existing garage level; new living rm/powder rm at rear of garage to replace e storage rm and e toilet rm | $48,000 |
| Oct 27, 2017 | Expired or cancelled cancelled Nov 2017 | 1170 Sacramento St | remodel 4 baths. fixtures remain e location. new plumbing,vanities,stonetops, tile, paint. kitchen remodel. all fixtures to remain in existing locations. new plumbinb fixtures, cabonets, countertops, hood and hardwood flooring. no strucutural workDetails
remodel 4 baths. fixtures remain e location. new plumbing,vanities,stonetops, tile, paint. kitchen remodel. all fixtures to remain in existing locations. new plumbinb fixtures, cabonets, countertops, hood and hardwood flooring. no strucutural work | $350,000 |
| Sep 20, 2017 | Completed final sign-off Jan 2018 | 1 Hawthorne St | #14d - remodel master bathroom - cinvert existing shower/tub into a shower at the same location, new tile & paint, new light fixture at same location. no structural work.Details
#14d - remodel master bathroom - cinvert existing shower/tub into a shower at the same location, new tile & paint, new light fixture at same location. no structural work. | $17,000 |
| Aug 28, 2017 | Completed final sign-off Nov 2017 | 1637 Chestnut St | exterior dry rot work at the rear of the building. no structural work. all repair work in kind at rear sunroomDetails
exterior dry rot work at the rear of the building. no structural work. all repair work in kind at rear sunroom | $15,000 |
| Aug 28, 2017 | Completed final sign-off Nov 2017 | 229 Brannan St | master bath remodel - new tile and vanity stone top, patch and paint. kitchen remodel - new counter tops, tile back splash, sink and faucet, patch and paint. no structural work. n/a maherDetails
master bath remodel - new tile and vanity stone top, patch and paint. kitchen remodel - new counter tops, tile back splash, sink and faucet, patch and paint. no structural work. n/a maher | $17,000 |
| Aug 10, 2017 | Completed final sign-off Sep 2017 | 1170 Sacramento St | #2c - re-tile shower stall only. new shower valve. no structural work.Details
#2c - re-tile shower stall only. new shower valve. no structural work. | $15,000 |
| Apr 18, 2017 | Completed final sign-off Aug 2017 | 219 Brannan St | new dropped ceiling in living room, new fireplace surround. new bedroom wall relocation approximately 1'. ref. pa # 201609309224; n/a maherDetails
new dropped ceiling in living room, new fireplace surround. new bedroom wall relocation approximately 1'. ref. pa # 201609309224; n/a maher | $2,000 |
| Apr 18, 2017 | Completed final sign-off Apr 2019 | 3641 Clement St | investigate water intrusion at rear of the building may include stucco and/or roofing. no structural work.Details
investigate water intrusion at rear of the building may include stucco and/or roofing. no structural work. | $2,000 |
| Mar 23, 2017 | Completed final sign-off Feb 2021 | 3449 Pacific Av | at rear family room: repai rdryrot, stucco patch & paint. no structural work, work not visible to the street. exterior work at rear of bldg.Details
at rear family room: repai rdryrot, stucco patch & paint. no structural work, work not visible to the street. exterior work at rear of bldg. | $8,000 |
| Mar 23, 2017 | Completed final sign-off Aug 2017 | 840 Powell St | kitchen remodel: remove & replace with new in same locations cabinet doors & drawer fronts, hood + hoodliner, cook top, counter tops, paint. master bathroom remodel: remove & replace with new in same locations toilet, 2 lavatories, vanity, countertop, tile + shower door, paint. no structural work.Details
kitchen remodel: remove & replace with new in same locations cabinet doors & drawer fronts, hood + hoodliner, cook top, counter tops, paint. master bathroom remodel: remove & replace with new in same locations toilet, 2 lavatories, vanity, countertop, tile + shower door, paint. no structural work. | $150,000 |
| Jan 18, 2017 | Completed final sign-off Aug 2017 | 1170 Sacramento St | remodel two bathrooms. all fixtures to remain in (e) location. new vanities, stovve, tops, tile and paint. new hardwood flooringDetails
remodel two bathrooms. all fixtures to remain in (e) location. new vanities, stovve, tops, tile and paint. new hardwood flooring | $150,000 |
| Jan 17, 2017 | Completed final sign-off Feb 2021 | 79 Valley St | new lvl 1 3/4 x 11 7/8 ledger for widened opening between kitchen and living roomDetails
new lvl 1 3/4 x 11 7/8 ledger for widened opening between kitchen and living room | $1,000 |
| Dec 1, 2016 | Completed final sign-off Apr 2017 | 2164 Hyde St | unit 510: remodel kitchen: new cabinets, countertops, flooring, plumbing & electrical fixtures, tile + paint. remodel guest + bath; new vanity & stove top, new tile, electrical & plumbing fixtures, & paint. no structural work.Details
unit 510: remodel kitchen: new cabinets, countertops, flooring, plumbing & electrical fixtures, tile + paint. remodel guest + bath; new vanity & stove top, new tile, electrical & plumbing fixtures, & paint. no structural work. | $60,000 |
| Oct 21, 2016 | Completed final sign-off Apr 2017 | 79 Valley St | remodel kitchen and two baths. kitchen - new cabinets, countertop, appliances in same locations. bathroom - new vanities, countertops, plumbing fixtures in same locations, new tile. new hardwood floor, approx 1200 sf, throughout except in bathrooms. paint. no structural work. no change in layout.Details
remodel kitchen and two baths. kitchen - new cabinets, countertop, appliances in same locations. bathroom - new vanities, countertops, plumbing fixtures in same locations, new tile. new hardwood floor, approx 1200 sf, throughout except in bathrooms. paint. no structural work. no change in layout. | $80,000 |
| Sep 30, 2016 | Completed final sign-off Aug 2017 | 219 Brannan St | unit #18a: replace (e) sheetrock ceiling area in living room, approx. 250 sq. ft. new hardwood floors in living room, dining room, hallway and kitchen, approx. 2500 sq. ft, throughout unit. no structural work.Details
unit #18a: replace (e) sheetrock ceiling area in living room, approx. 250 sq. ft. new hardwood floors in living room, dining room, hallway and kitchen, approx. 2500 sq. ft, throughout unit. no structural work. | $40,000 |
| Sep 30, 2016 | Completed final sign-off Aug 2017 | 1750 Taylor St | #1802: kitchen remodel: (n) cabinets, countertops, & appl. in same location as (e). new hardwood floors in kitchen, living room and two bedrooms, total approx. 1000 sf. no structural work. no change in wall and opening layout. lighting change will invoke 50% min watt. of high efficacy fixturesDetails
#1802: kitchen remodel: (n) cabinets, countertops, & appl. in same location as (e). new hardwood floors in kitchen, living room and two bedrooms, total approx. 1000 sf. no structural work. no change in wall and opening layout. lighting change will invoke 50% min watt. of high efficacy fixtures | $90,000 |
| Jun 16, 2016 | Completed final sign-off Dec 2016 | 239 Brannan St | interior non structural remodel 15th fl unit 16 g. remodel kitchen, remodel 2 baths, new interior finishesDetails
interior non structural remodel 15th fl unit 16 g. remodel kitchen, remodel 2 baths, new interior finishes | $58,000 |
| May 26, 2016 | Completed final sign-off Mar 2017 | 229 Brannan St | kitchen: new cabinets, countertops, fixtures in same location. new hardwood fl. entry/living room, dining rm, 1 bedrm, office, new hardwood fl, master bath, guest bath, new vanities, countertops, fixtures in same location as existing. new tile, laundry rm. new shelving,babinet. new tile fl. no strucDetails
kitchen: new cabinets, countertops, fixtures in same location. new hardwood fl. entry/living room, dining rm, 1 bedrm, office, new hardwood fl, master bath, guest bath, new vanities, countertops, fixtures in same location as existing. new tile, laundry rm. new shelving,babinet. new tile fl. no struc | $125,000 |
| May 19, 2016 | Completed final sign-off Oct 2016 | 229 Brannan St | kitchen: new counter tops & tile backsplash. new range & hood. master bathroom: new shower & tub in same locations. new tile & countertop. no structural work.Details
kitchen: new counter tops & tile backsplash. new range & hood. master bathroom: new shower & tub in same locations. new tile & countertop. no structural work. | $50,000 |
| May 11, 2016 | Completed final sign-off Sep 2016 | 35 Dolores St | furnish & install bookcases/computer desk in the kitchen. no structural work.Details
furnish & install bookcases/computer desk in the kitchen. no structural work. | $10,000 |
| Apr 29, 2016 | Completed final sign-off Jun 2016 | 1 Hawthorne St | unit #11f - add wall to enclose closet space. relocate light switch & thermostat.Details
unit #11f - add wall to enclose closet space. relocate light switch & thermostat. | $500 |
| Jan 20, 2016 | Completed final sign-off Aug 2016 | 1080 Chestnut St | remodel (e) master bathrm. no structural work. n/a for maher.Details
remodel (e) master bathrm. no structural work. n/a for maher. | $50,000 |
| Jan 20, 2016 | Completed final sign-off May 2016 | 219 Brannan St | remodel (e) guest bathroom. no structural work. n/a for maher.Details
remodel (e) guest bathroom. no structural work. n/a for maher. | $20,000 |
| Oct 22, 2015 | Completed final sign-off Sep 2016 | 1750 Taylor St | 8th floor, unit #802 limited renovation: demo (e) interior east wall and rebuild for the unitDetails
8th floor, unit #802 limited renovation: demo (e) interior east wall and rebuild for the unit | $10,000 |
| Sep 22, 2015 | Completed final sign-off Apr 2016 | 2743 Baker St | kitchen: r&r , same location- plumb fixtures, outlets, cabinetry, countertops. new stone tile & paint. bathrooms (2) r&r , same location - plumb fixture, outlets, vanities & countertops. new stone, tile and paint. no structural work, maher naDetails
kitchen: r&r , same location- plumb fixtures, outlets, cabinetry, countertops. new stone tile & paint. bathrooms (2) r&r , same location - plumb fixture, outlets, vanities & countertops. new stone, tile and paint. no structural work, maher na | $75,000 |
| Sep 22, 2015 | Never finaled issued Sep 2015, no final | 2743 Baker St | street spaceDetails
street space | |
| Sep 1, 2015 | Completed final sign-off Nov 2015 | 1750 Taylor St | unit #602: kitchen: new door and drawer fronts on all cabinetry, new counter tops, new plugs and recessed lighting in some locations. no structural work.Details
unit #602: kitchen: new door and drawer fronts on all cabinetry, new counter tops, new plugs and recessed lighting in some locations. no structural work. | $12,000 |
| Sep 1, 2015 | Completed final sign-off Aug 2016 | 1080 Chestnut St | unit 9a: install three closet packages, modular/pre-fab closet units. replace dining room light fixture with new. no structural work.Details
unit 9a: install three closet packages, modular/pre-fab closet units. replace dining room light fixture with new. no structural work. | $15,000 |
| Aug 12, 2015 | Completed final sign-off Jan 2016 | 343 Frederick St | replace foundation per structural engineer plan, stucco patch and paintDetails
replace foundation per structural engineer plan, stucco patch and paint | $8,000 |
| Jun 23, 2015 | Completed final sign-off Jan 2017 | 1750 Taylor St | unit merger only. combine unit 804 and 805. drm# 2015-007396. remove (e) door & wall dividing units interior renovation for new hall, entry foyer, butler pantry, closets match (e) finishes.Details
unit merger only. combine unit 804 and 805. drm# 2015-007396. remove (e) door & wall dividing units interior renovation for new hall, entry foyer, butler pantry, closets match (e) finishes. | |
| May 18, 2015 | Completed final sign-off Aug 2016 | 1080 Chestnut St | kitchen: remove and replace with new plumbing fixtures, outlets, cabinetry and countertops, new stone, tile and paint. bathrooms (2) remove and replace with new plumbing fixtures, outlets, vanities and countertops. new stone, tile & paint. new hardwood floors in living room, dining roomDetails
kitchen: remove and replace with new plumbing fixtures, outlets, cabinetry and countertops, new stone, tile and paint. bathrooms (2) remove and replace with new plumbing fixtures, outlets, vanities and countertops. new stone, tile & paint. new hardwood floors in living room, dining room | $125,000 |
| May 18, 2015 | Completed final sign-off Jul 2015 | 1170 Sacramento St | replace existing shower with new tub/shower combination, new tile, plumbing fixtures and paint. no structural work. n/a maher ord. # 155-13Details
replace existing shower with new tub/shower combination, new tile, plumbing fixtures and paint. no structural work. n/a maher ord. # 155-13 | $25,000 |
| Feb 27, 2015 | Completed final sign-off Jun 2015 | 1750 Taylor St | cut holes for electrician in 2 bedrms & living room, remove marble backsplash at hood area in kitchen & replace with mirror. repaint kitchen. patch & paint throughout unit. no structural work, replace in kind for fire protection.Details
cut holes for electrician in 2 bedrms & living room, remove marble backsplash at hood area in kitchen & replace with mirror. repaint kitchen. patch & paint throughout unit. no structural work, replace in kind for fire protection. | $16,500 |
| Feb 27, 2015 | Completed final sign-off May 2015 | 219 Brannan St | master bath remodel; remove existing tub/shower combination & install new full shower,new tile on shower walls,shower floor & bathrm flr,new counertop,new mirror above vanity,remove 1 (e) recessed light & repl with new.remove (e) sconces,retrim plugs,switches dimmers.new shower valves,patch paint,Details
master bath remodel; remove existing tub/shower combination & install new full shower,new tile on shower walls,shower floor & bathrm flr,new counertop,new mirror above vanity,remove 1 (e) recessed light & repl with new.remove (e) sconces,retrim plugs,switches dimmers.new shower valves,patch paint, | $15,000 |
| Feb 24, 2015 | Completed final sign-off Aug 2015 | 2134 Green St | remodel geust bathroom: new tile floor, vanity & toilet. new plumbing fixtures. paint. no structural workDetails
remodel geust bathroom: new tile floor, vanity & toilet. new plumbing fixtures. paint. no structural work | $8,000 |
| Feb 24, 2015 | Expired or cancelled cancelled May 2015 | 1750 Taylor St | miscellaneous new lighting, plugs & switches throughout. new toilets in 3 bathrooms, new doors in 2 bathrooms & 3 closets marble polishing. pathcing & painting throughout. no structural workDetails
miscellaneous new lighting, plugs & switches throughout. new toilets in 3 bathrooms, new doors in 2 bathrooms & 3 closets marble polishing. pathcing & painting throughout. no structural work | $35,000 |
| Jan 20, 2015 | Completed final sign-off Apr 2015 | 1750 Taylor St | change out door, toilet, existing light fixtures in master bedroom, refinish existing hardwood floors. fabricate & install desk cabinet in guest bedroom, paint throughout. no structural work.Details
change out door, toilet, existing light fixtures in master bedroom, refinish existing hardwood floors. fabricate & install desk cabinet in guest bedroom, paint throughout. no structural work. | $80,000 |
| Jan 20, 2015 | Expired or cancelled cancelled Oct 2018 | 3641 Clement St | remove existing windows, furnish & install 12 new windows at the back of house in (e) openings. no structural work.Details
remove existing windows, furnish & install 12 new windows at the back of house in (e) openings. no structural work. | $8,000 |
| Jan 20, 2015 | Completed final sign-off Jun 2015 | 1100 Union St | kitchen remodel: new cabinets, countertops, flooring, tile, appliances, plumbing fixtures in same location. new recessed lights, new hood using existing exhaust duct work, painting. no structural work. n/a ordinance #155-13.Details
kitchen remodel: new cabinets, countertops, flooring, tile, appliances, plumbing fixtures in same location. new recessed lights, new hood using existing exhaust duct work, painting. no structural work. n/a ordinance #155-13. | $58,000 |
| Nov 7, 2014 | Completed final sign-off Dec 2014 | 1080 Chestnut St | powder room change out plumbing fixtures & fan with new in same location as existing. new light fixtures and plugs. new tile in shower & floor. new vanity & countertop in same location as existing. new shower door.l no structural work. n/a maher ord. # 155-13Details
powder room change out plumbing fixtures & fan with new in same location as existing. new light fixtures and plugs. new tile in shower & floor. new vanity & countertop in same location as existing. new shower door.l no structural work. n/a maher ord. # 155-13 | $15,000 |
| Sep 29, 2014 | Completed final sign-off Mar 2015 | 5 Montague Pl | minor dryrot repairs in garage. replace in like and kind. no structural work. no street visible work, repair wood siding and paper under layment, at rear of house lower level.Details
minor dryrot repairs in garage. replace in like and kind. no structural work. no street visible work, repair wood siding and paper under layment, at rear of house lower level. | $2,000 |
| Aug 26, 2014 | Completed final sign-off Jan 2015 | 239 Brannan St | remodel one bathroom, new tub & tile. plumbing & electrical paint throughout. no structural workDetails
remodel one bathroom, new tub & tile. plumbing & electrical paint throughout. no structural work | $15,000 |
| May 30, 2014 | Completed final sign-off Jan 2015 | 1170 Sacramento St | replace existing tub & install shower, new tile, plumbing. no structural work. scope of work to include fixture replacement only. no walls to be altered or modified. work beyond this scope will require additional permit with drawings.Details
replace existing tub & install shower, new tile, plumbing. no structural work. scope of work to include fixture replacement only. no walls to be altered or modified. work beyond this scope will require additional permit with drawings. | $10,000 |
| May 21, 2014 | Completed final sign-off Jul 2014 | 343 Frederick St | repair dry rot at back stairs, replace 1 post, 2 threads, 1 ledger, 1 handrail, and 1 3x6 landing. less than 50% of stairs being replaced. no structural work. common area.Details
repair dry rot at back stairs, replace 1 post, 2 threads, 1 ledger, 1 handrail, and 1 3x6 landing. less than 50% of stairs being replaced. no structural work. common area. | $2,000 |
| Apr 8, 2014 | Completed final sign-off May 2014 | 301 Main St | non structural work open ceiling for electrician, sheetrock and patch for surface mounted light fixture approx 30 ft . open a dropped ceiling in the kitchen sheetrock of approx 30 sq ft work only in unit #21g no changes to doors or windows.Details
non structural work open ceiling for electrician, sheetrock and patch for surface mounted light fixture approx 30 ft . open a dropped ceiling in the kitchen sheetrock of approx 30 sq ft work only in unit #21g no changes to doors or windows. | $2,000 |
| Apr 8, 2014 | Completed final sign-off Sep 2014 | 1080 Chestnut St | bathr remodel, remove & replace in some locations plumbing fixtures outlets vanity & countertops, new tile paint throughout unit, refinish hardwood floor no strucrutal work, no changes to doors or windows work only to be done in unit #14bDetails
bathr remodel, remove & replace in some locations plumbing fixtures outlets vanity & countertops, new tile paint throughout unit, refinish hardwood floor no strucrutal work, no changes to doors or windows work only to be done in unit #14b | $20,000 |
| Feb 13, 2014 | Completed final sign-off Oct 2014 | 1170 Sacramento St | demo existing closet, install new closet package, relocate existing jamb switch, no structural work; compliance with ord 155-13 not requiredDetails
demo existing closet, install new closet package, relocate existing jamb switch, no structural work; compliance with ord 155-13 not required | $500 |
| Feb 13, 2014 | Completed final sign-off Apr 2014 | 2100 Washington St | bathroom remodel, new vanity, countertop, tile paint, plumbing fixtures, and outlets, no structural work , no removal of any wallsDetails
bathroom remodel, new vanity, countertop, tile paint, plumbing fixtures, and outlets, no structural work , no removal of any walls | $30,000 |
| Jan 14, 2014 | Completed final sign-off Dec 2014 | 142 Lomita Av | 1)revision to app#201306109025. 2)substituting wood framing in lieu of concrete pad and new wall bracing detailing at privacy screen.Details
1)revision to app#201306109025. 2)substituting wood framing in lieu of concrete pad and new wall bracing detailing at privacy screen. | |
| Nov 7, 2013 | Completed final sign-off Jan 2014 | 301 Mission St | install poliform wall unit, install electrical for flat screen monitor, no structural work.Details
install poliform wall unit, install electrical for flat screen monitor, no structural work. | $1,000 |
| Sep 16, 2013 | Completed final sign-off Jan 2014 | 301 Mission St | new light fixtures. install new entertainment center cabinet and paint. not structural work. patch in like kind.Details
new light fixtures. install new entertainment center cabinet and paint. not structural work. patch in like kind. | $5,000 |
| Sep 10, 2013 | Completed final sign-off Dec 2014 | 142 Lomita Av | revision to 201306109025.Details
revision to 201306109025. | $500 |
| Jul 30, 2013 | Completed final sign-off Oct 2013 | 343 Frederick St | unit #4: bath remodel - new bath fixture in same locations. new outlets. new tile. paint. no structural work. no new lighting.Details
unit #4: bath remodel - new bath fixture in same locations. new outlets. new tile. paint. no structural work. no new lighting. | $18,000 |
| Jul 30, 2013 | Completed final sign-off Oct 2013 | 343 Frederick St | lobby: repairs due to water damage. new tile floor. minor sheetrock patching, tape and paint. no structural work. use = 5/8" type x sheetrock; ceiling area is approx 8'x15'. wall area is approx 8'x25' (each wall).Details
lobby: repairs due to water damage. new tile floor. minor sheetrock patching, tape and paint. no structural work. use = 5/8" type x sheetrock; ceiling area is approx 8'x15'. wall area is approx 8'x25' (each wall). | $7,000 |
| Jun 19, 2013 | Completed final sign-off Jun 2014 | 611 Washington St | #2201 - reframe light guage metal partition walls and new finisihes. remodel of kitchen and 2 bathrooms. new mechanical and lighting. no change of use structure, area, exteriors exiting.Details
#2201 - reframe light guage metal partition walls and new finisihes. remodel of kitchen and 2 bathrooms. new mechanical and lighting. no change of use structure, area, exteriors exiting. | $75,000 |
| Jun 18, 2013 | Completed final sign-off Feb 2014 | 1750 Taylor St | new non-fire rated entry door. new wall between wall and office. new tile on entry floor.Details
new non-fire rated entry door. new wall between wall and office. new tile on entry floor. | $20,000 |
| Jun 10, 2013 | Completed final sign-off Dec 2014 | 142 Lomita Av | back yard landscaping & deck & retaining walls, repalc e(e) stairs, railings & decking, (e) concrete walls to remain _ be skim-coated, new walls to match.Details
back yard landscaping & deck & retaining walls, repalc e(e) stairs, railings & decking, (e) concrete walls to remain _ be skim-coated, new walls to match. | $150,000 |
| May 17, 2013 | Completed final sign-off Sep 2013 | 229 Brannan St | kitchen: new counter top & new light fixtures. guest & master bathroom: new shower enclosures, new tile. paint through out. no structural work, replace in kind location.Details
kitchen: new counter top & new light fixtures. guest & master bathroom: new shower enclosures, new tile. paint through out. no structural work, replace in kind location. | $35,000 |
| May 17, 2013 | Completed final sign-off Sep 2013 | 219 Brannan St | relocate the (e) bedroom door to the opposite side of the same wall. no structural workDetails
relocate the (e) bedroom door to the opposite side of the same wall. no structural work | $1,500 |
| May 10, 2013 | Completed final sign-off Jul 2013 | 338 Spear St | new kitchen countertop, new carpet, new shower enclosure, paint throughout, no structural work, no change on walls.Details
new kitchen countertop, new carpet, new shower enclosure, paint throughout, no structural work, no change on walls. | $25,000 |
| Apr 18, 2013 | Completed final sign-off May 2014 | 1090 Chestnut St | unit 6. general remodel of kitchen, master bath, guest bath, & powder room. replace plumbing & electrical fixtures, tile, marble countertops, & vanities. new hardwood floors & paint. no structural work. no removal & relocate of any wall. lighting must w/cec 150(k).Details
unit 6. general remodel of kitchen, master bath, guest bath, & powder room. replace plumbing & electrical fixtures, tile, marble countertops, & vanities. new hardwood floors & paint. no structural work. no removal & relocate of any wall. lighting must w/cec 150(k). | $180,000 |