244 permits since 2000: 221 completed, 10 never finaled, 13 expired or cancelled.
Of the 10 never-finaled permits, 3 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
104 bathroom remodel permits: 96 completed, 2 never finaled, 6 expired or cancelled. Typically 0 days from filing to permit and 200 days from permit to final inspection.
Showing the 100 most recent of 104.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 8, 2026 | Completed final sign-off May 2026 | 1090 Chestnut St | changeout wall hung toilets in master bathroom and powder room, replace in same location with new electrical plug at each toilet.Details
changeout wall hung toilets in master bathroom and powder room, replace in same location with new electrical plug at each toilet. | $2,500 |
| Jan 14, 2026 | Completed final sign-off Apr 2026 | 239 Brannan St | unit 16a; remodel primary bathroom. replace all existing plumbing fixtures with new in same location. replace existing fan with new same location. new tile, countertop and paint. no structural work. like for like.Details
unit 16a; remodel primary bathroom. replace all existing plumbing fixtures with new in same location. replace existing fan with new same location. new tile, countertop and paint. no structural work. like for like. | $50,000 |
| Jun 26, 2025 | Completed final sign-off May 2026 | 1090 Chestnut St | 5th/fl: (unit#5) interior non structural remodel: a) remodel bedroom#3 and closet b) relocate bathroom#3 and laudry c) (n) finishes,fixtures, and fittings in bath #2 and #3. d) (n) led lighting in baths and home office.Details
5th/fl: (unit#5) interior non structural remodel: a) remodel bedroom#3 and closet b) relocate bathroom#3 and laudry c) (n) finishes,fixtures, and fittings in bath #2 and #3. d) (n) led lighting in baths and home office. | $98,000 |
| Sep 27, 2024 | Completed final sign-off Mar 2026 | 1090 Chestnut St | unit #4 interior non structural remodel: remodel kitchen, remodel & reconfigure 5 bathrooms. all (n) interior finishes to replace existing finishesDetails
unit #4 interior non structural remodel: remodel kitchen, remodel & reconfigure 5 bathrooms. all (n) interior finishes to replace existing finishes | $350,786 |
| Aug 20, 2024 | Completed final sign-off Jul 2025 | 188 Minna St | unit 28a- interior remodel kitchen with new cabinets, counter tops and appliances. replace cabinet fixtures and finsihes in 3x bathrooms. new hardwood floors and painting.Details
unit 28a- interior remodel kitchen with new cabinets, counter tops and appliances. replace cabinet fixtures and finsihes in 3x bathrooms. new hardwood floors and painting. | $220,000 |
| Apr 29, 2024 | Completed final sign-off Oct 2024 | 219 Brannan St | remodel primary bathroom: remove and repalce in same locations all plumbing fixtures. remove and replace in same locations fan and light fixtures, new tile in shower, shower floor and main bathroom floor. tape and paint. no structural work.Details
remodel primary bathroom: remove and repalce in same locations all plumbing fixtures. remove and replace in same locations fan and light fixtures, new tile in shower, shower floor and main bathroom floor. tape and paint. no structural work. | $25,000 |
| Feb 5, 2024 | Completed final sign-off Oct 2024 | 239 Brannan St | interior non structural alteration. remove (e) non structural wall between (e) living and (e) bedroom #2. remodel (e) kitchen and paint cabinets. remodel (2) bathrooms. (n) led lighting and electrical modificaitons. (n) finishes to replace (e) finishes.Details
interior non structural alteration. remove (e) non structural wall between (e) living and (e) bedroom #2. remodel (e) kitchen and paint cabinets. remodel (2) bathrooms. (n) led lighting and electrical modificaitons. (n) finishes to replace (e) finishes. | $62,000 |
| Apr 7, 2023 | Completed final sign-off Sep 2023 | 1333 Jones St | new countertops in kitchen, reinstall kitchen sink after new countertops are installed. new vanity countertop in guest bathroom. install 4 sconces in livingroom. new switches and plates in livngroom. kitchen & guest bedroom. new hardwood flooring in livingroom, den, and kitchen, painting in sameDetails
new countertops in kitchen, reinstall kitchen sink after new countertops are installed. new vanity countertop in guest bathroom. install 4 sconces in livingroom. new switches and plates in livngroom. kitchen & guest bedroom. new hardwood flooring in livingroom, den, and kitchen, painting in same | $30,000 |
| Mar 6, 2023 | Completed final sign-off Aug 2023 | 1750 Taylor St | remodel master bathroom. new stone top for (e) vanity tile. new stone slab for shower walls. replace (e) sconces and eiling can lights with new. paint throughout unit. no structural work.Details
remodel master bathroom. new stone top for (e) vanity tile. new stone slab for shower walls. replace (e) sconces and eiling can lights with new. paint throughout unit. no structural work. | $80,000 |
| Mar 6, 2023 | Completed final sign-off Aug 2023 | 219 Brannan St | remodel master and guest bathrooms. replace (e) tile with new tile. vanities and vanity tops to remain. replace (e) can lights and plumbing fixtures with new. refinish (e) hardwood floors. paint throughout unit. no structural work.Details
remodel master and guest bathrooms. replace (e) tile with new tile. vanities and vanity tops to remain. replace (e) can lights and plumbing fixtures with new. refinish (e) hardwood floors. paint throughout unit. no structural work. | $90,000 |
| Jan 9, 2023 | Completed final sign-off May 2023 | 229 Brannan St | unit 17d: guest bathroom, new tile on walls and floor. misc paint. no structural workDetails
unit 17d: guest bathroom, new tile on walls and floor. misc paint. no structural work | $12,000 |
| Jan 9, 2023 | Completed final sign-off Mar 2024 | 1333 Jones St | unit 1010: remove/replace (e) w/new in in kitchen same locations, cabinets, cntrtop,plumb,elec fix, primary/guest baths. same locations vanity,top, elec/plumb fixtures,tile,paint. hardwood floors kitchen,dr,lr,entry hall approx 1000 sf. no structural/walls removedDetails
unit 1010: remove/replace (e) w/new in in kitchen same locations, cabinets, cntrtop,plumb,elec fix, primary/guest baths. same locations vanity,top, elec/plumb fixtures,tile,paint. hardwood floors kitchen,dr,lr,entry hall approx 1000 sf. no structural/walls removed | $250,000 |
| Oct 18, 2022 | Completed final sign-off May 2023 | 229 Brannan St | remodel 2 bathrooms: remove old replace new in existing locations; plumbing fixtures; fans; light fixtures, switches and plates; vanities and tops; shower door and enclosures; tile and paint. no structural work.Details
remodel 2 bathrooms: remove old replace new in existing locations; plumbing fixtures; fans; light fixtures, switches and plates; vanities and tops; shower door and enclosures; tile and paint. no structural work. | $75,000 |
| Jan 14, 2022 | Completed final sign-off Aug 2022 | 1080 Chestnut St | guest bath remodel: remove old and replace in same location vanity, stovetop, tile, electrical and plumbing fixtures. no structural work.Details
guest bath remodel: remove old and replace in same location vanity, stovetop, tile, electrical and plumbing fixtures. no structural work. | $45,000 |
| May 4, 2021 | Completed final sign-off Sep 2022 | 1170 Sacramento St | #6b:new wall finishes and fixtures at (e) shower in (e) main bath. new tub/shower/vanity & associated fixtures and finishes at guest bathroom. new toilet/vanity and associated fixtures & finishes at powder room. relocate (e) valves & new electrical for new washer/dryer at (e) locationsDetails
#6b:new wall finishes and fixtures at (e) shower in (e) main bath. new tub/shower/vanity & associated fixtures and finishes at guest bathroom. new toilet/vanity and associated fixtures & finishes at powder room. relocate (e) valves & new electrical for new washer/dryer at (e) locations | $18,000 |
| Dec 10, 2020 | Completed final sign-off Jul 2021 | 219 Brannan St | remodel e bath in like kind. replace e fixtures and finishes with newDetails
remodel e bath in like kind. replace e fixtures and finishes with new | $15,800 |
| Jan 15, 2020 | Completed final sign-off May 2022 | 1090 Chestnut St | interior non-structureal remodeling remodel kitchen, remodel/ reconfigure 3-bathroom and 1 power rooom, all new interior finishes to replace (e) finishesDetails
interior non-structureal remodeling remodel kitchen, remodel/ reconfigure 3-bathroom and 1 power rooom, all new interior finishes to replace (e) finishes | $210,000 |
| Aug 26, 2019 | Completed final sign-off Jul 2020 | 1333 Jones St | kitchen remodel: remove existing and replace with new in same location cabinets,countertops, plumbing and electrical fixtures. bathroom remodel: remove existing and replace with new in same location vanity, top, electrical and plumbing fixtures, tile, paint throughout.hardwood floors throuhout.n.s.wDetails
kitchen remodel: remove existing and replace with new in same location cabinets,countertops, plumbing and electrical fixtures. bathroom remodel: remove existing and replace with new in same location vanity, top, electrical and plumbing fixtures, tile, paint throughout.hardwood floors throuhout.n.s.w | $150,000 |
| Aug 1, 2019 | Completed final sign-off Mar 2021 | 1090 Chestnut St | complete remodel of entire unit 11. kitchen, baths, dining, bedrooms, add 1/2 bath. cabinets, fixtures. no structural or exterior work ref 201805229742 (kitchen remodel) maher not reqDetails
complete remodel of entire unit 11. kitchen, baths, dining, bedrooms, add 1/2 bath. cabinets, fixtures. no structural or exterior work ref 201805229742 (kitchen remodel) maher not req | $100,000 |
| Jun 14, 2019 | Completed final sign-off Sep 2022 | 1090 Chestnut St | all work#12:kitchen romodel: remove existing and replace with new in same location cabinets, stone countertop, plumbing and electrical fixtrues, master bathroom,(2)guest bathroom and powder room remodel:replace in same location vanities, stonetop,electrical and plumbing fixtures, no structural work.Details
all work#12:kitchen romodel: remove existing and replace with new in same location cabinets, stone countertop, plumbing and electrical fixtrues, master bathroom,(2)guest bathroom and powder room remodel:replace in same location vanities, stonetop,electrical and plumbing fixtures, no structural work. | $350,000 |
| Jun 14, 2019 | Completed final sign-off Oct 2020 | 1738 Lombard St | unit 8: remodel two guest bathrooms, remove existing and replace with new in same locations vanities, counter tops, tile, electrical and plumbing fixtures. existing floor to remain. paint, no structural work.Details
unit 8: remodel two guest bathrooms, remove existing and replace with new in same locations vanities, counter tops, tile, electrical and plumbing fixtures. existing floor to remain. paint, no structural work. | $50,000 |
| Oct 5, 2018 | Completed final sign-off May 2019 | 219 Brannan St | master bath: new tiles on shower walls and floor. new vanity and stone top. guest bath: new tiles on floor only. new vanity and top. new switches and plugs. paint throughout unit. hardwood floors throughout except for master and guest bathrooms. no structural work. maher n/aDetails
master bath: new tiles on shower walls and floor. new vanity and stone top. guest bath: new tiles on floor only. new vanity and top. new switches and plugs. paint throughout unit. hardwood floors throughout except for master and guest bathrooms. no structural work. maher n/a | $75,000 |
| Aug 1, 2018 | Completed final sign-off Mar 2019 | 1333 Jones St | remodel: kitchen 12'x12', master bathroom 9'x9',front door, hardwood floors, finishesDetails
remodel: kitchen 12'x12', master bathroom 9'x9',front door, hardwood floors, finishes | $103,000 |
| May 22, 2018 | Completed final sign-off Mar 2021 | 1090 Chestnut St | ste 11: kitchen remodel, remove and replace with new in same locations cabinets, stone counter tops, plumbing & elelctrical fixtures. master bath, guest bath and powder room remodel. remove old and replace with new in same locations vanities, stone tops, tile, electrical and plumbing fixtures.Details
ste 11: kitchen remodel, remove and replace with new in same locations cabinets, stone counter tops, plumbing & elelctrical fixtures. master bath, guest bath and powder room remodel. remove old and replace with new in same locations vanities, stone tops, tile, electrical and plumbing fixtures. | $250,000 |
| May 4, 2018 | Never finaled issued May 2018, no final | 2164 Hyde St | unit 611: master bath remodel, remove/replace w/new in same locations, vanity, stove top, medicine cabinet, tile, electrical & plumbing fixtures, paint. no structural work.Details
unit 611: master bath remodel, remove/replace w/new in same locations, vanity, stove top, medicine cabinet, tile, electrical & plumbing fixtures, paint. no structural work. | $25,000 |
| May 4, 2018 | Completed final sign-off Jul 2018 | 229 Brannan St | unit 8g: new kitchen countertop & deck splash, new tile flooring; guest bath: remove/replace w/new in same locations, vanity, stovetop, medicine cabinet, tile, electrical & plumbing, fixtures. no structural work.Details
unit 8g: new kitchen countertop & deck splash, new tile flooring; guest bath: remove/replace w/new in same locations, vanity, stovetop, medicine cabinet, tile, electrical & plumbing, fixtures. no structural work. | $25,000 |
| Feb 6, 2018 | Completed final sign-off Feb 2021 | 3449 Pacific Av | basement: repairs due to water damage, insulation, cabinetry; taping/painting; 1/f kitchen, bar, bath/powder rms; remove/replace same locations, finishes, plumbing fixtures/electrical, tile, flooring; 2/f: master & guest baths, remove/relocation same locations, vanities, plumbing, electrical, tile,Details
basement: repairs due to water damage, insulation, cabinetry; taping/painting; 1/f kitchen, bar, bath/powder rms; remove/replace same locations, finishes, plumbing fixtures/electrical, tile, flooring; 2/f: master & guest baths, remove/relocation same locations, vanities, plumbing, electrical, tile, | $250,000 |
| Nov 2, 2017 | Completed final sign-off Jul 2018 | 1170 Sacramento St | remodel four baths. all fixtures to remain in e locations. new plumbing fixtures, vanities, stonetops, tile and paint. kitchen remodel. all fixtures to remain in existing locations. new plumbing fixtures, cabinets, countertops, hood and hardwood flooring. no structural workDetails
remodel four baths. all fixtures to remain in e locations. new plumbing fixtures, vanities, stonetops, tile and paint. kitchen remodel. all fixtures to remain in existing locations. new plumbing fixtures, cabinets, countertops, hood and hardwood flooring. no structural work | $350,000 |
| Oct 27, 2017 | Expired or cancelled cancelled Nov 2017 | 1170 Sacramento St | remodel 4 baths. fixtures remain e location. new plumbing,vanities,stonetops, tile, paint. kitchen remodel. all fixtures to remain in existing locations. new plumbinb fixtures, cabonets, countertops, hood and hardwood flooring. no strucutural workDetails
remodel 4 baths. fixtures remain e location. new plumbing,vanities,stonetops, tile, paint. kitchen remodel. all fixtures to remain in existing locations. new plumbinb fixtures, cabonets, countertops, hood and hardwood flooring. no strucutural work | $350,000 |
| Sep 20, 2017 | Completed final sign-off Jan 2018 | 1 Hawthorne St | #14d - remodel master bathroom - cinvert existing shower/tub into a shower at the same location, new tile & paint, new light fixture at same location. no structural work.Details
#14d - remodel master bathroom - cinvert existing shower/tub into a shower at the same location, new tile & paint, new light fixture at same location. no structural work. | $17,000 |
| Aug 28, 2017 | Completed final sign-off Nov 2017 | 229 Brannan St | master bath remodel - new tile and vanity stone top, patch and paint. kitchen remodel - new counter tops, tile back splash, sink and faucet, patch and paint. no structural work. n/a maherDetails
master bath remodel - new tile and vanity stone top, patch and paint. kitchen remodel - new counter tops, tile back splash, sink and faucet, patch and paint. no structural work. n/a maher | $17,000 |
| Mar 23, 2017 | Completed final sign-off Aug 2017 | 840 Powell St | kitchen remodel: remove & replace with new in same locations cabinet doors & drawer fronts, hood + hoodliner, cook top, counter tops, paint. master bathroom remodel: remove & replace with new in same locations toilet, 2 lavatories, vanity, countertop, tile + shower door, paint. no structural work.Details
kitchen remodel: remove & replace with new in same locations cabinet doors & drawer fronts, hood + hoodliner, cook top, counter tops, paint. master bathroom remodel: remove & replace with new in same locations toilet, 2 lavatories, vanity, countertop, tile + shower door, paint. no structural work. | $150,000 |
| Jan 18, 2017 | Completed final sign-off Aug 2017 | 1170 Sacramento St | remodel two bathrooms. all fixtures to remain in (e) location. new vanities, stovve, tops, tile and paint. new hardwood flooringDetails
remodel two bathrooms. all fixtures to remain in (e) location. new vanities, stovve, tops, tile and paint. new hardwood flooring | $150,000 |
| Dec 1, 2016 | Completed final sign-off Apr 2017 | 2164 Hyde St | unit 510: remodel kitchen: new cabinets, countertops, flooring, plumbing & electrical fixtures, tile + paint. remodel guest + bath; new vanity & stove top, new tile, electrical & plumbing fixtures, & paint. no structural work.Details
unit 510: remodel kitchen: new cabinets, countertops, flooring, plumbing & electrical fixtures, tile + paint. remodel guest + bath; new vanity & stove top, new tile, electrical & plumbing fixtures, & paint. no structural work. | $60,000 |
| Oct 21, 2016 | Completed final sign-off Apr 2017 | 79 Valley St | remodel kitchen and two baths. kitchen - new cabinets, countertop, appliances in same locations. bathroom - new vanities, countertops, plumbing fixtures in same locations, new tile. new hardwood floor, approx 1200 sf, throughout except in bathrooms. paint. no structural work. no change in layout.Details
remodel kitchen and two baths. kitchen - new cabinets, countertop, appliances in same locations. bathroom - new vanities, countertops, plumbing fixtures in same locations, new tile. new hardwood floor, approx 1200 sf, throughout except in bathrooms. paint. no structural work. no change in layout. | $80,000 |
| Jun 16, 2016 | Completed final sign-off Dec 2016 | 239 Brannan St | interior non structural remodel 15th fl unit 16 g. remodel kitchen, remodel 2 baths, new interior finishesDetails
interior non structural remodel 15th fl unit 16 g. remodel kitchen, remodel 2 baths, new interior finishes | $58,000 |
| May 26, 2016 | Completed final sign-off Mar 2017 | 229 Brannan St | kitchen: new cabinets, countertops, fixtures in same location. new hardwood fl. entry/living room, dining rm, 1 bedrm, office, new hardwood fl, master bath, guest bath, new vanities, countertops, fixtures in same location as existing. new tile, laundry rm. new shelving,babinet. new tile fl. no strucDetails
kitchen: new cabinets, countertops, fixtures in same location. new hardwood fl. entry/living room, dining rm, 1 bedrm, office, new hardwood fl, master bath, guest bath, new vanities, countertops, fixtures in same location as existing. new tile, laundry rm. new shelving,babinet. new tile fl. no struc | $125,000 |
| May 19, 2016 | Completed final sign-off Oct 2016 | 229 Brannan St | kitchen: new counter tops & tile backsplash. new range & hood. master bathroom: new shower & tub in same locations. new tile & countertop. no structural work.Details
kitchen: new counter tops & tile backsplash. new range & hood. master bathroom: new shower & tub in same locations. new tile & countertop. no structural work. | $50,000 |
| Jan 20, 2016 | Completed final sign-off May 2016 | 219 Brannan St | remodel (e) guest bathroom. no structural work. n/a for maher.Details
remodel (e) guest bathroom. no structural work. n/a for maher. | $20,000 |
| Sep 22, 2015 | Completed final sign-off Apr 2016 | 2743 Baker St | kitchen: r&r , same location- plumb fixtures, outlets, cabinetry, countertops. new stone tile & paint. bathrooms (2) r&r , same location - plumb fixture, outlets, vanities & countertops. new stone, tile and paint. no structural work, maher naDetails
kitchen: r&r , same location- plumb fixtures, outlets, cabinetry, countertops. new stone tile & paint. bathrooms (2) r&r , same location - plumb fixture, outlets, vanities & countertops. new stone, tile and paint. no structural work, maher na | $75,000 |
| May 18, 2015 | Completed final sign-off Aug 2016 | 1080 Chestnut St | kitchen: remove and replace with new plumbing fixtures, outlets, cabinetry and countertops, new stone, tile and paint. bathrooms (2) remove and replace with new plumbing fixtures, outlets, vanities and countertops. new stone, tile & paint. new hardwood floors in living room, dining roomDetails
kitchen: remove and replace with new plumbing fixtures, outlets, cabinetry and countertops, new stone, tile and paint. bathrooms (2) remove and replace with new plumbing fixtures, outlets, vanities and countertops. new stone, tile & paint. new hardwood floors in living room, dining room | $125,000 |
| Feb 27, 2015 | Completed final sign-off May 2015 | 219 Brannan St | master bath remodel; remove existing tub/shower combination & install new full shower,new tile on shower walls,shower floor & bathrm flr,new counertop,new mirror above vanity,remove 1 (e) recessed light & repl with new.remove (e) sconces,retrim plugs,switches dimmers.new shower valves,patch paint,Details
master bath remodel; remove existing tub/shower combination & install new full shower,new tile on shower walls,shower floor & bathrm flr,new counertop,new mirror above vanity,remove 1 (e) recessed light & repl with new.remove (e) sconces,retrim plugs,switches dimmers.new shower valves,patch paint, | $15,000 |
| Feb 24, 2015 | Completed final sign-off Aug 2015 | 2134 Green St | remodel geust bathroom: new tile floor, vanity & toilet. new plumbing fixtures. paint. no structural workDetails
remodel geust bathroom: new tile floor, vanity & toilet. new plumbing fixtures. paint. no structural work | $8,000 |
| Feb 24, 2015 | Expired or cancelled cancelled May 2015 | 1750 Taylor St | miscellaneous new lighting, plugs & switches throughout. new toilets in 3 bathrooms, new doors in 2 bathrooms & 3 closets marble polishing. pathcing & painting throughout. no structural workDetails
miscellaneous new lighting, plugs & switches throughout. new toilets in 3 bathrooms, new doors in 2 bathrooms & 3 closets marble polishing. pathcing & painting throughout. no structural work | $35,000 |
| Aug 26, 2014 | Completed final sign-off Jan 2015 | 239 Brannan St | remodel one bathroom, new tub & tile. plumbing & electrical paint throughout. no structural workDetails
remodel one bathroom, new tub & tile. plumbing & electrical paint throughout. no structural work | $15,000 |
| Feb 13, 2014 | Completed final sign-off Apr 2014 | 2100 Washington St | bathroom remodel, new vanity, countertop, tile paint, plumbing fixtures, and outlets, no structural work , no removal of any wallsDetails
bathroom remodel, new vanity, countertop, tile paint, plumbing fixtures, and outlets, no structural work , no removal of any walls | $30,000 |
| Jul 30, 2013 | Completed final sign-off Oct 2013 | 343 Frederick St | unit #4: bath remodel - new bath fixture in same locations. new outlets. new tile. paint. no structural work. no new lighting.Details
unit #4: bath remodel - new bath fixture in same locations. new outlets. new tile. paint. no structural work. no new lighting. | $18,000 |
| Jun 19, 2013 | Completed final sign-off Jun 2014 | 611 Washington St | #2201 - reframe light guage metal partition walls and new finisihes. remodel of kitchen and 2 bathrooms. new mechanical and lighting. no change of use structure, area, exteriors exiting.Details
#2201 - reframe light guage metal partition walls and new finisihes. remodel of kitchen and 2 bathrooms. new mechanical and lighting. no change of use structure, area, exteriors exiting. | $75,000 |
| May 17, 2013 | Completed final sign-off Sep 2013 | 229 Brannan St | kitchen: new counter top & new light fixtures. guest & master bathroom: new shower enclosures, new tile. paint through out. no structural work, replace in kind location.Details
kitchen: new counter top & new light fixtures. guest & master bathroom: new shower enclosures, new tile. paint through out. no structural work, replace in kind location. | $35,000 |
| Apr 18, 2013 | Completed final sign-off May 2014 | 1090 Chestnut St | unit 6. general remodel of kitchen, master bath, guest bath, & powder room. replace plumbing & electrical fixtures, tile, marble countertops, & vanities. new hardwood floors & paint. no structural work. no removal & relocate of any wall. lighting must w/cec 150(k).Details
unit 6. general remodel of kitchen, master bath, guest bath, & powder room. replace plumbing & electrical fixtures, tile, marble countertops, & vanities. new hardwood floors & paint. no structural work. no removal & relocate of any wall. lighting must w/cec 150(k). | $180,000 |
| Jan 11, 2013 | Completed final sign-off Dec 2013 | 1080 Chestnut St | kitchen & two bathroom: remove & replace in same locations plumbing fixtures, outlets, cabinetry & countertops. new tile. painting throughout unit. no structural workDetails
kitchen & two bathroom: remove & replace in same locations plumbing fixtures, outlets, cabinetry & countertops. new tile. painting throughout unit. no structural work | $100,000 |
| Jul 30, 2012 | Completed final sign-off Mar 2013 | 1080 Chestnut St | kitchen, master bath & powder room: remove & replace in same locations, plumbing fixtures, outlets cabinetry & counter tops. new tile & paint. no structural work. no change on walls and opening. (e0 bathroom exit to remain, bathroom % 50% kitchen lighting shall be high efficacy.Details
kitchen, master bath & powder room: remove & replace in same locations, plumbing fixtures, outlets cabinetry & counter tops. new tile & paint. no structural work. no change on walls and opening. (e0 bathroom exit to remain, bathroom % 50% kitchen lighting shall be high efficacy. | $125,000 |
| Mar 5, 2012 | Completed final sign-off Aug 2012 | 1080 Chestnut St | kitchen: remove/replsace with new, same locations plumbing fixtures, outlets, cabinetry & countertops. new stone tile & paint. 2 bathrooms: remove/replace with new, same location plumbing fixtures, outlets, vanities & coutertops. new sone tile & paint. no structural work. lighting to comply cec150(kDetails
kitchen: remove/replsace with new, same locations plumbing fixtures, outlets, cabinetry & countertops. new stone tile & paint. 2 bathrooms: remove/replace with new, same location plumbing fixtures, outlets, vanities & coutertops. new sone tile & paint. no structural work. lighting to comply cec150(k | $100,000 |
| Nov 16, 2011 | Completed final sign-off Mar 2012 | 142 Lomita Av | add toilet & vanity at 1st floor closet (change closet into bathroom). new electrical & plumbing & paint. no structural workDetails
add toilet & vanity at 1st floor closet (change closet into bathroom). new electrical & plumbing & paint. no structural work | $5,000 |
| Jul 18, 2011 | Completed final sign-off Apr 2012 | 2164 Hyde St | complete remodel of kitchen & 3 bathrooms-plumbing & electrical, cabinets, tile, paint. no structural work. plumbing & electrical fixtures in same locations. kitchen at least 50% high eff (he) lighting, bathroom he or occupancy sensor, cec 150(c)Details
complete remodel of kitchen & 3 bathrooms-plumbing & electrical, cabinets, tile, paint. no structural work. plumbing & electrical fixtures in same locations. kitchen at least 50% high eff (he) lighting, bathroom he or occupancy sensor, cec 150(c) | $260,000 |
| Apr 6, 2011 | Completed final sign-off Aug 2011 | 2123 Pierce St | bathroom remodel: remove & repl with new in same locations, plumbing fixture and outlets, new tile & paint, no structural work, all lighting must comply with cec 150(k)Details
bathroom remodel: remove & repl with new in same locations, plumbing fixture and outlets, new tile & paint, no structural work, all lighting must comply with cec 150(k) | $7,000 |
| Apr 6, 2011 | Completed final sign-off Aug 2011 | 2017 Grant Av | bathroom remodel: remove & replace in same location plumbing fixtures, outlets, vanity & store countertop. new tile and paint. no structural work. lighting must comply w/ cec 150 (k).Details
bathroom remodel: remove & replace in same location plumbing fixtures, outlets, vanity & store countertop. new tile and paint. no structural work. lighting must comply w/ cec 150 (k). | $32,000 |
| Mar 28, 2011 | Completed final sign-off Oct 2011 | 1080 Chestnut St | kitchen: remove & replace with new in same locations. plumbing fixtures, outlets, cabinetry & counter tops. new stone, tile & paint. (2) bathrooms; remove & replace with new in same location plumbing fixtures, outlets, vanities & counter tops. new stone, tile & paint. no structural work.Details
kitchen: remove & replace with new in same locations. plumbing fixtures, outlets, cabinetry & counter tops. new stone, tile & paint. (2) bathrooms; remove & replace with new in same location plumbing fixtures, outlets, vanities & counter tops. new stone, tile & paint. no structural work. | $150,000 |
| Jul 12, 2010 | Completed final sign-off Dec 2010 | 2860 Green St | guest bathroom remodel: remove & replace in same location with new plumbing fixtures, outlets, vanity & countertop, new tile, paint. no structural work, no new wall & no existing wall relocation.Details
guest bathroom remodel: remove & replace in same location with new plumbing fixtures, outlets, vanity & countertop, new tile, paint. no structural work, no new wall & no existing wall relocation. | $60,000 |
| Apr 23, 2010 | Completed final sign-off Aug 2010 | 2134 Green St | unit #4: master bath, remove & repl in same location new plumbing fixtures, outlets, vanity & couner top, new tile & point, no structural works, provide exhaust fan, high efficiency lightDetails
unit #4: master bath, remove & repl in same location new plumbing fixtures, outlets, vanity & couner top, new tile & point, no structural works, provide exhaust fan, high efficiency light | $10,000 |
| Apr 23, 2010 | Completed final sign-off Dec 2010 | 1750 Taylor St | unit #802: kitchen: remove & repl with new in same location plumbing fixtures, outlets, cabinets, appliances, & countertop, paint: masterbath: remove & repl with new in same locations, guest bath- remove & repl with new; new hardwood flooring in living rm, provide high efficiency lights per cecDetails
unit #802: kitchen: remove & repl with new in same location plumbing fixtures, outlets, cabinets, appliances, & countertop, paint: masterbath: remove & repl with new in same locations, guest bath- remove & repl with new; new hardwood flooring in living rm, provide high efficiency lights per cec | $80,000 |
| Dec 23, 2009 | Completed final sign-off May 2010 | 1901 California St | master bath remodel. remove and replace with new in same location. vanity, plumbing fixtures, elec plugs, new tile, paint. no structural workDetails
master bath remodel. remove and replace with new in same location. vanity, plumbing fixtures, elec plugs, new tile, paint. no structural work | $40,000 |
| Jan 27, 2009 | Completed final sign-off Sep 2009 | 407 Lakeshore Dr | second floor bathroom-remove + replace with new in same locations plumbing fixtures, bathroom and outlets, new tile & paint. no structural work.Details
second floor bathroom-remove + replace with new in same locations plumbing fixtures, bathroom and outlets, new tile & paint. no structural work. | $10,000 |
| Jan 27, 2009 | Never finaled issued Jan 2009, no final | 1170 Sacramento St | kitchen remove + replace swith new in same location plumbing fixtures, outlets, cabinets, appliance + granite countertop. paint. master bath-remove + replace with new in same locations plumbing fixtures, outlets, vanity + countertop. new tile + paint. guest bath + powder room: remove + replace withDetails
kitchen remove + replace swith new in same location plumbing fixtures, outlets, cabinets, appliance + granite countertop. paint. master bath-remove + replace with new in same locations plumbing fixtures, outlets, vanity + countertop. new tile + paint. guest bath + powder room: remove + replace with | $55,000 |
| Sep 2, 2008 | Completed final sign-off Jan 2009 | 1170 Sacramento St | work @ unit# 15d only. master bath remodel. remove & replace with new in same locations. plumbing fixtures, outlets, vanity & countertop. new tile & paint. no structural work. provide fluorescent light or title 24 occupancy sensors in bathroom.Details
work @ unit# 15d only. master bath remodel. remove & replace with new in same locations. plumbing fixtures, outlets, vanity & countertop. new tile & paint. no structural work. provide fluorescent light or title 24 occupancy sensors in bathroom. | $20,000 |
| Feb 29, 2008 | Completed final sign-off Oct 2008 | 1333 Jones St | remove and replace with new in existing locations. cabinets, countertops, appliances in kitchen. remove and replace with new existing locations vanieties, fixtures, lighting, and finishes in guest and master bathrooms. no structural work.Details
remove and replace with new in existing locations. cabinets, countertops, appliances in kitchen. remove and replace with new existing locations vanieties, fixtures, lighting, and finishes in guest and master bathrooms. no structural work. | $100,000 |
| Oct 15, 2007 | Completed final sign-off Feb 2008 | 1250 Jones St | remove (e) lumbing fixtures and tile in guest bathroom. install new plumbing fixtures in same locations and install new tile throughout. no structural work.Details
remove (e) lumbing fixtures and tile in guest bathroom. install new plumbing fixtures in same locations and install new tile throughout. no structural work. | $35,000 |
| Oct 9, 2007 | Completed final sign-off Mar 2008 | 239 Brannan St | remove bathroom #3, delete removal of bathroom #2 from previous permit 2007 0417 8991,delete expansion of bedroom #2.Details
remove bathroom #3, delete removal of bathroom #2 from previous permit 2007 0417 8991,delete expansion of bedroom #2. | $10,000 |
| Aug 13, 2007 | Completed final sign-off Sep 2008 | 840 Powell St | 4th floor-remodel of apartment unit #402, demolition of closets at master bedroom, construction of new walk in closet, remodel kitchen and bathrooms; new laundry room. new finishes.Details
4th floor-remodel of apartment unit #402, demolition of closets at master bedroom, construction of new walk in closet, remodel kitchen and bathrooms; new laundry room. new finishes. | $200,000 |
| Jun 29, 2007 | Completed final sign-off Mar 2008 | 1333 Jones St | work on#1210. remove & replace w/new in (e) locations cabinets, countertops + appliances in kitchen. vanities fixtures, lighting & finishes in guest & master bathrooms. new washer & dryer in guest bath. new hardwood flooring throughout unit.no structural work.Details
work on#1210. remove & replace w/new in (e) locations cabinets, countertops + appliances in kitchen. vanities fixtures, lighting & finishes in guest & master bathrooms. new washer & dryer in guest bath. new hardwood flooring throughout unit.no structural work. | $100,000 |
| Jun 7, 2007 | Completed final sign-off Sep 2007 | 2622 Jackson St | 3rd fl powder room, bathroom and family room. remove/replace cabinets w/casement cabinets in basementDetails
3rd fl powder room, bathroom and family room. remove/replace cabinets w/casement cabinets in basement | $35,000 |
| Jun 5, 2007 | Completed final sign-off Mar 2008 | 840 Powell St | guesst bathroom-remove &replace with new in some location bathtub, toilet & lavy. new tile, laundry room-move washer & dryer to adjacent wall. no structural work. provide fluorescent light or occupancy sensor in bathroom.Details
guesst bathroom-remove &replace with new in some location bathtub, toilet & lavy. new tile, laundry room-move washer & dryer to adjacent wall. no structural work. provide fluorescent light or occupancy sensor in bathroom. | $25,000 |
| Apr 17, 2007 | Completed final sign-off Mar 2008 | 239 Brannan St | #10a- interior non-structural remodeling: (n0 structural work). conncet (merge) unit 10a to adjacent unit 10j owned by husband & wife. remodeling (interior) & re-configuration of bed #2, bed #3, no lighting work. remove kitchen counters, cabs. & appliances & remove bath #3.Details
#10a- interior non-structural remodeling: (n0 structural work). conncet (merge) unit 10a to adjacent unit 10j owned by husband & wife. remodeling (interior) & re-configuration of bed #2, bed #3, no lighting work. remove kitchen counters, cabs. & appliances & remove bath #3. | $80,000 |
| Apr 3, 2007 | Completed final sign-off Oct 2007 | 1333 Jones St | new shower pan and tile floor in master bathroom. new shower door at master bathroom. remove and replace toilet with new. paint exterior of kchn cabinets and ceiling in living room & bedroom. rework sliding doors between lvg room and dining for smooth operation. furnish & install pills on kchn cbntsDetails
new shower pan and tile floor in master bathroom. new shower door at master bathroom. remove and replace toilet with new. paint exterior of kchn cabinets and ceiling in living room & bedroom. rework sliding doors between lvg room and dining for smooth operation. furnish & install pills on kchn cbnts | $10,000 |
| Mar 27, 2007 | Completed final sign-off Jan 2008 | 2123 Pierce St | remodel bathroom, remove/replace with new shower & vanity. new tile & paint. new plumbing fixtures. no structural work. no window replacement. flourscent lighting or controlled by monitor sensor.Details
remodel bathroom, remove/replace with new shower & vanity. new tile & paint. new plumbing fixtures. no structural work. no window replacement. flourscent lighting or controlled by monitor sensor. | $30,000 |
| Feb 22, 2007 | Completed final sign-off Sep 2007 | 1034 Chestnut St | work @ unit# 1038 only. kitchen & master bath remodel. remove old bath fixtures & replace with new. new shower pan, shower valve & shower enclosure. new vanity & countertop. new tile. new kitchen cabinets & counter top. remove old appliances & replace with new. replaces switches, outlets &Details
work @ unit# 1038 only. kitchen & master bath remodel. remove old bath fixtures & replace with new. new shower pan, shower valve & shower enclosure. new vanity & countertop. new tile. new kitchen cabinets & counter top. remove old appliances & replace with new. replaces switches, outlets & | $125,000 |
| Jan 23, 2007 | Completed final sign-off Apr 2007 | 2536 Broadway | remodel existing bathroom . remove (e) bath fixture + replace with new install new medicine cabinet +make up miror . new tile floor + walls, new shower valves. new plug + switch plaster. no structural work. (bathroom on 2nd floor). (no lighting change)Details
remodel existing bathroom . remove (e) bath fixture + replace with new install new medicine cabinet +make up miror . new tile floor + walls, new shower valves. new plug + switch plaster. no structural work. (bathroom on 2nd floor). (no lighting change) | $25,000 |
| Nov 14, 2006 | Completed final sign-off Aug 2008 | 125 Montalvo Av | new kitchen sink and countertops. existing kitchen cabinets to remain. remove existing bath vanity, medicine cabinet and all fixtures. replace with new. no structural work. no new lightingDetails
new kitchen sink and countertops. existing kitchen cabinets to remain. remove existing bath vanity, medicine cabinet and all fixtures. replace with new. no structural work. no new lighting | $25,500 |
| Aug 4, 2006 | Completed final sign-off Mar 2007 | 1170 Sacramento St | work @ unit# 8 only. no structural work. partial bath remodel. new plumbing & electrical fixtures. tile flooring. patch & paint.Details
work @ unit# 8 only. no structural work. partial bath remodel. new plumbing & electrical fixtures. tile flooring. patch & paint. | $25,000 |
| Jul 21, 2006 | Completed final sign-off Apr 2007 | 1080 Chestnut St | remocelkitchen & 2 bathrooms electrical, plumbin, cabinets flooring & paint no structural workDetails
remocelkitchen & 2 bathrooms electrical, plumbin, cabinets flooring & paint no structural work | $100,000 |
| Feb 28, 2006 | Completed final sign-off Oct 2006 | 1090 Chestnut St | kitchen + master bath remodel. replace cabinets, appliances. countertops, vanity, plumbing fixtures, tile, paint. no structural work.Details
kitchen + master bath remodel. replace cabinets, appliances. countertops, vanity, plumbing fixtures, tile, paint. no structural work. | $70,000 |
| Feb 17, 2006 | Completed final sign-off Oct 2006 | 5 Montague Pl | no structural work. remodel kitchen & (2) bathrooms replace vanities, replace kitchen cabinets, tile, countertops, hardwood floors, paint, work on upper unitDetails
no structural work. remodel kitchen & (2) bathrooms replace vanities, replace kitchen cabinets, tile, countertops, hardwood floors, paint, work on upper unit | $250,000 |
| Dec 9, 2005 | Completed final sign-off Feb 2006 | 152 Lombard St | kitchen & bath remodel. remove & replace fixtures in same location. new cabinets, tile electrical plumbing & paint, no structural workDetails
kitchen & bath remodel. remove & replace fixtures in same location. new cabinets, tile electrical plumbing & paint, no structural work | $75,000 |
| Dec 5, 2005 | Completed final sign-off Apr 2006 | 343 Frederick St | bathroom remodel.Details
bathroom remodel. | $8,000 |
| Sep 21, 2005 | Completed final sign-off Sep 2006 | 1090 Chestnut St | general remodel kitchen, master bath, guest bath + powder rm. replace plumbing + electrical fixturesDetails
general remodel kitchen, master bath, guest bath + powder rm. replace plumbing + electrical fixtures | $200,000 |
| Jun 8, 2005 | Completed final sign-off Sep 2005 | 164 Jordan Av | remove and replace in same location plumbing fix and vanity in bath. install tile and paint. remove/Details
remove and replace in same location plumbing fix and vanity in bath. install tile and paint. remove/ | $35,000 |
| May 13, 2005 | Completed final sign-off Oct 2005 | 3074 Pacific Av | no structural work. replace existing kitchen and 2 bathrooms cabinets. replace bath fixtures.Details
no structural work. replace existing kitchen and 2 bathrooms cabinets. replace bath fixtures. | $100,000 |
| Feb 23, 2005 | Completed final sign-off Jul 2005 | 3600 Clay St | remodel two bathrooms and one powder room.replace plumbing fixtures. no structural work.Details
remodel two bathrooms and one powder room.replace plumbing fixtures. no structural work. | $65,000 |
| Feb 23, 2005 | Completed final sign-off Jun 2005 | 1170 Sacramento St | remodel kitchen and bath. painting, electrical and plumbing .nop structural work.Details
remodel kitchen and bath. painting, electrical and plumbing .nop structural work. | $105,000 |
| Feb 2, 2005 | Completed final sign-off Mar 2005 | 1200 California St | renew pa 200407279233- bath remodel unit no. 10aDetails
renew pa 200407279233- bath remodel unit no. 10a | |
| Feb 2, 2005 | Completed final sign-off Feb 2005 | 1080 Chestnut St | #16b-no structural work,remodel kitchen & 2 1/2 baths.millwork,marble,plumbing fixtures.appliances.Details
#16b-no structural work,remodel kitchen & 2 1/2 baths.millwork,marble,plumbing fixtures.appliances. | $200,000 |
| Sep 21, 2004 | Completed final sign-off Nov 2005 | 1170 Sacramento St | interior remodel of existing bedrooms, bathrooms, living room & dining room. included are new floor,Details
interior remodel of existing bedrooms, bathrooms, living room & dining room. included are new floor, | $125,000 |
| Sep 21, 2004 | Completed final sign-off Apr 2005 | 1080 Chestnut St | remodel bathroom & kitchen, hardwood flooring, electrical & plumbing, fixtures, painting, no structuDetails
remodel bathroom & kitchen, hardwood flooring, electrical & plumbing, fixtures, painting, no structu | $75,000 |
| Jul 27, 2004 | Expired or cancelled expired Feb 2005 | 1200 California St | new bath fixtures, light fixture, patch and paint throughout room. no structural workDetails
new bath fixtures, light fixture, patch and paint throughout room. no structural work | $4,500 |
| Jul 23, 2004 | Completed final sign-off Apr 2005 | 1200 California St | remodel 2 bathrooms, plumbing & electrical - no structural workDetails
remodel 2 bathrooms, plumbing & electrical - no structural work | $25,000 |
| Jul 16, 2004 | Completed final sign-off Mar 2005 | 1170 Sacramento St | remodel (2) bathroom + kitchen. plumbing, electrical, hardwood floors, paint. no structural work.Details
remodel (2) bathroom + kitchen. plumbing, electrical, hardwood floors, paint. no structural work. | $75,000 |
| Jul 7, 2004 | Completed final sign-off Feb 2005 | 1080 Chestnut St | remodel kitchen and bath. sheetrock and paintDetails
remodel kitchen and bath. sheetrock and paint | $23,000 |
| Mar 26, 2004 | Completed final sign-off Nov 2004 | 1200 California St | kithen and bath remodedl including plumbing , electical, cabinetry, tile, fixturesDetails
kithen and bath remodedl including plumbing , electical, cabinetry, tile, fixtures | $70,000 |
| Feb 11, 2004 | Completed final sign-off Jul 2004 | 2142 Lyon St | remodel (2) bathrooms, includes plumbing, plumbing fixtures, electrical, tile,marbleDetails
remodel (2) bathrooms, includes plumbing, plumbing fixtures, electrical, tile,marble | $75,000 |
| Jan 12, 2004 | Expired or cancelled expired Jul 2006 | 239 Brannan St | partial remodel of bathrooms, bedrooms & livingrm. minor repairs throughout. no structural workDetails