Block 6617, lot 050
79 Valley St
- City’s use
- Single Family Residential
- Built
- 1900
- Stories
- 2
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,521 sq ft
- Zoning
- NA
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 23, 2023 | Completed final sign-off Oct 2023 | 79 Valley St | Velox Construction Inc/Velox Des & Const | repair water damage - drywall ceiling and walls. repalce water damaged ceiling cans. reinstall finish plumbing in bathrooms. reinstall finishes in bathroom. all non structural work.Details
repair water damage - drywall ceiling and walls. repalce water damaged ceiling cans. reinstall finish plumbing in bathrooms. reinstall finishes in bathroom. all non structural work. | $54,000 |
| Sep 23, 2020 | Completed final sign-off Feb 2021 | 79 Valley St | Robison Nieri White Construction | renew permit application #201701177271 for final inspectionDetails
renew permit application #201701177271 for final inspection | |
| Jan 17, 2017 | Completed final sign-off Feb 2021 | 79 Valley St | Robison Nieri White Construction | new lvl 1 3/4 x 11 7/8 ledger for widened opening between kitchen and living roomDetails
new lvl 1 3/4 x 11 7/8 ledger for widened opening between kitchen and living room | $1,000 |
| Oct 21, 2016 | Completed final sign-off Apr 2017 | 79 Valley St | Robison Nieri White Construction | remodel kitchen and two baths. kitchen - new cabinets, countertop, appliances in same locations. bathroom - new vanities, countertops, plumbing fixtures in same locations, new tile. new hardwood floor, approx 1200 sf, throughout except in bathrooms. paint. no structural work. no change in layout.Details
remodel kitchen and two baths. kitchen - new cabinets, countertop, appliances in same locations. bathroom - new vanities, countertops, plumbing fixtures in same locations, new tile. new hardwood floor, approx 1200 sf, throughout except in bathrooms. paint. no structural work. no change in layout. | $80,000 |
| Jun 13, 2016 | Completed final sign-off Aug 2016 | 79 Valley St | Saturn Construction Co | patch drywall on all floors due to water damage; replace speaker on ground floor; replace on light on 2/f; touch up paint on all floors; all repairs in-kind; no structural work.Details
patch drywall on all floors due to water damage; replace speaker on ground floor; replace on light on 2/f; touch up paint on all floors; all repairs in-kind; no structural work. | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Robison Nieri White Construction (3), Saturn Construction Co, Velox Construction Inc/Velox Des & Const
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.