Unicon Construction Solutions Llc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2018 to Jun 2022
- Last 24 months
- 0 permits filed
35 permits since 2000: 30 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2022 | Completed final sign-off Oct 2022 | 79 Summit Wy | (1) kitchen remodel: like for like, adding pot filler above range. two bathroom remodel: like for like. one powder room remodeling like for like. no removal of walls. non structural.Details
(1) kitchen remodel: like for like, adding pot filler above range. two bathroom remodel: like for like. one powder room remodeling like for like. no removal of walls. non structural. | $150,000 |
| Jun 1, 2022 | Completed final sign-off Dec 2022 | 2912 Steiner St | unit #6: kitchen remodel: subpanel upgrade to 100 amps, adding washer/dryer (220v), adding water line for ice maker. no removal of wallsDetails
unit #6: kitchen remodel: subpanel upgrade to 100 amps, adding washer/dryer (220v), adding water line for ice maker. no removal of walls | $50,000 |
| Jan 26, 2022 | Completed final sign-off Sep 2022 | 501 Beale St | full condo remodel: 1 kitchen remodel: like for like run dedicated wire to island via (e) conduit. 2. bathrm remodel turn tub into walk in shower and connect to second walk in shower to create 1 larger w/s with linear drains. 3. new tile flooring throughout. 4. replace lower 4' of drywall throughoutDetails
full condo remodel: 1 kitchen remodel: like for like run dedicated wire to island via (e) conduit. 2. bathrm remodel turn tub into walk in shower and connect to second walk in shower to create 1 larger w/s with linear drains. 3. new tile flooring throughout. 4. replace lower 4' of drywall throughout | $83,000 |
| Nov 12, 2021 | Completed final sign-off Dec 2022 | 123 Yukon St | (1) kitchen remodel. add plubming for island sink and island dishwasher. relocate gas stove. kitchen orientation stays the same.Details
(1) kitchen remodel. add plubming for island sink and island dishwasher. relocate gas stove. kitchen orientation stays the same. | $34,900 |
| Oct 1, 2021 | Completed final sign-off Mar 2022 | 1705 11th Av | legalize bathroom and room down stair, pre-existing construction room and bath down stairs. demo 1 window and demo stovetop @ ground fl. and approve further work to be done. add lighting and force heating, updade water heater, add gfci and regular duplex outlets.Details
legalize bathroom and room down stair, pre-existing construction room and bath down stairs. demo 1 window and demo stovetop @ ground fl. and approve further work to be done. add lighting and force heating, updade water heater, add gfci and regular duplex outlets. | $60,000 |
| Jul 2, 2021 | Never finaled issued Jul 2021, no final | 1785 San Jose Av | revision to pa 2019-0205-2082 s1 - add hot tub @ deck, widen stair from deck to grade and add gas heaters @ deckDetails
revision to pa 2019-0205-2082 s1 - add hot tub @ deck, widen stair from deck to grade and add gas heaters @ deck | $4,500 |
| Jun 15, 2021 | Expired or cancelled withdrawn Sep 2021 | 330 Los Palmos Dr | voluntary retrofit. minor front door relocation.Details
voluntary retrofit. minor front door relocation. | $60,000 |
| Jun 9, 2021 | Completed final sign-off Mar 2022 | 1011 Green St | interior remodel. remove wall between hall and dining room. increase opening between living room and dining room. provide new beams remove post at kitchen and provide steel beam. fill in openings at kitchen at removal walls. relocate laundry to 3rdfloor . remodel kitchen.Details
interior remodel. remove wall between hall and dining room. increase opening between living room and dining room. provide new beams remove post at kitchen and provide steel beam. fill in openings at kitchen at removal walls. relocate laundry to 3rdfloor . remodel kitchen. | $50,000 |
| Apr 26, 2021 | Completed final sign-off Jul 2022 | 2482 Great Hy | unit 2482 & 2484: remodel kitchen and bathroom laundry at both units, in-kind replacement of all windows, enlarge storage at ground floorDetails
unit 2482 & 2484: remodel kitchen and bathroom laundry at both units, in-kind replacement of all windows, enlarge storage at ground floor | $120,000 |
| Apr 26, 2021 | Completed final sign-off Apr 2024 | 1122 Wawona St | revision to pa# 201912189947. move kitchen to lower level. construct new bed and bath at upper level. excavate approx 6" at rear 20'-0" of lower level.Details
revision to pa# 201912189947. move kitchen to lower level. construct new bed and bath at upper level. excavate approx 6" at rear 20'-0" of lower level. | $50,000 |
| Apr 16, 2021 | Completed final sign-off Nov 2021 | 383 Bartlett St | relocate furnace from garace to upper unit. turn hallway closet in that unit into furnace room. no moving/relocating/adding walls. not open to bedroom.Details
relocate furnace from garace to upper unit. turn hallway closet in that unit into furnace room. no moving/relocating/adding walls. not open to bedroom. | $7,000 |
| Apr 14, 2021 | Completed final sign-off Jun 2021 | 2050 Alemany Bl | repair & replace exterior siding at side of rear approx 35sf at rear & side (north/south) w/ 25sf overall, less than 50%. r/r like to like tomatch with (e) conditions and paint color.Details
repair & replace exterior siding at side of rear approx 35sf at rear & side (north/south) w/ 25sf overall, less than 50%. r/r like to like tomatch with (e) conditions and paint color. | $5,800 |
| Apr 12, 2021 | Completed final sign-off Feb 2022 | 2046 34th Av | bathroom & kitchen remodel. relocate toilet. delete walk-in shower. remove non-load bearing wall in kitchen.Details
bathroom & kitchen remodel. relocate toilet. delete walk-in shower. remove non-load bearing wall in kitchen. | $60,450 |
| Mar 9, 2021 | Completed final sign-off Aug 2021 | 146 Ripley St | kitchen remodeling; replacing cabinets, sink faucet,countertop same location. one powder room remodeling. replace toilet and vanity. no change to layout of walls and openings.Details
kitchen remodeling; replacing cabinets, sink faucet,countertop same location. one powder room remodeling. replace toilet and vanity. no change to layout of walls and openings. | $38,550 |
| Feb 22, 2021 | Completed final sign-off Nov 2021 | 381 Bartlett St | convert existing closet to laundry at unit 381.Details
convert existing closet to laundry at unit 381. | $2,500 |
| Feb 1, 2021 | Completed final sign-off Apr 2021 | 1825 44th Av | relocating hvac ductsDetails
relocating hvac ducts | $3,000 |
| Dec 23, 2020 | Expired or cancelled cancelled Feb 2021 | 1705 11th Av | like for like kitchen remodel.Details
like for like kitchen remodel. | $40,000 |
| Dec 23, 2020 | Completed final sign-off Oct 2021 | 2295 Vallejo St | like for like bathroom remodelDetails
like for like bathroom remodel | $17,000 |
| Dec 17, 2020 | Completed final sign-off Mar 2021 | 199 Tiffany Av | unit#311: like for like bathroom remodel, no change in layout of walls and openings.Details
unit#311: like for like bathroom remodel, no change in layout of walls and openings. | $17,000 |
| Dec 10, 2020 | Completed final sign-off Mar 2021 | 403 Main St | bath remodel like for like. turn single vanity to double. kitchen remodel like for like.new laminate flooring throughoutDetails
bath remodel like for like. turn single vanity to double. kitchen remodel like for like.new laminate flooring throughout | $8,500 |
| Nov 20, 2020 | Completed final sign-off Apr 2021 | 259 Prague St | run & install gas outlet, install outlet for gas insert, install duct for kitchen hood.Details
run & install gas outlet, install outlet for gas insert, install duct for kitchen hood. | $37,550 |
| Nov 20, 2020 | Completed final sign-off Feb 2021 | 3 Burnett Ave North Av | like for like bathroom remodel, no removal of walls.Details
like for like bathroom remodel, no removal of walls. | $40,000 |
| Oct 21, 2020 | Never finaled issued Mar 2021, no final | 571 Noe St | add 2 (n) chandliers, power outlet, 5 pendenat lights, route (n) water line. build led light permiters, steam shower to replace shower, wet bar plumbing hanging lights, move light switches, ext lighting, 3/f : (n) partiion wall, elec outlets, hanging lights, move light switches, expand ext window.Details
add 2 (n) chandliers, power outlet, 5 pendenat lights, route (n) water line. build led light permiters, steam shower to replace shower, wet bar plumbing hanging lights, move light switches, ext lighting, 3/f : (n) partiion wall, elec outlets, hanging lights, move light switches, expand ext window. | $71,000 |
| Oct 1, 2020 | Never finaled issued Nov 2020, no final | 1825 44th Av | structural changes: knocking down two walls to open the living room to kitchen. relocating switches to nearby wall. installing hardwood floors.Details
structural changes: knocking down two walls to open the living room to kitchen. relocating switches to nearby wall. installing hardwood floors. | $41,800 |
| Aug 21, 2020 | Completed final sign-off Mar 2021 | 498 35th Av | previously exterior fire damaged stucco to be replaced in front of building to match (e). approx 800 sq.ft. replacing damaged window.Details
previously exterior fire damaged stucco to be replaced in front of building to match (e). approx 800 sq.ft. replacing damaged window. | $14,000 |
| Jul 17, 2020 | Completed final sign-off Aug 2020 | 2474 Great Hy | minor dry rot repair - front face of buildingDetails
minor dry rot repair - front face of building | $21,500 |
| Feb 18, 2020 | Completed final sign-off May 2020 | 3132 Balboa St | 2nd fl - bathroom remodel; replace tub, toilet, vanity, tiles. add fan, 6" can lights. lighting per 2019 cen(150.0 ck)Details
2nd fl - bathroom remodel; replace tub, toilet, vanity, tiles. add fan, 6" can lights. lighting per 2019 cen(150.0 ck) | $20,000 |
| Jan 2, 2020 | Completed final sign-off May 2020 | 2474 Great Hy | add 15 recessed led lights. cover garage walls & ceiling with 5/8" drywall. crouch drain from garage to back yardDetails
add 15 recessed led lights. cover garage walls & ceiling with 5/8" drywall. crouch drain from garage to back yard | $11,000 |
| Dec 18, 2019 | Completed final sign-off Apr 2024 | 1122 Wawona St | renovation of (e) dwelling, new entry and conversion of (e) balcony to bay window, relocate ( 1 ) full bathroo, replace roof with 2 new skylights, convert to radiant heat.Details
renovation of (e) dwelling, new entry and conversion of (e) balcony to bay window, relocate ( 1 ) full bathroo, replace roof with 2 new skylights, convert to radiant heat. | $40,000 |
| Oct 23, 2019 | Completed final sign-off Feb 2020 | 778 Great Hy | apt 1: remodel bathroom (install tub, vanity, fixturs, tiles, fan led lights, gfci outlets), 6in led lights in the living room. provide min one vacancy sensor in bathroom.Details
apt 1: remodel bathroom (install tub, vanity, fixturs, tiles, fan led lights, gfci outlets), 6in led lights in the living room. provide min one vacancy sensor in bathroom. | $20,000 |
| Oct 7, 2019 | Completed final sign-off Nov 2019 | 1792 Green St | kitchen remodeling. replace sink, faucet, appliances, cabinets, countertop, floor. add 6 recessed led lightsDetails
kitchen remodeling. replace sink, faucet, appliances, cabinets, countertop, floor. add 6 recessed led lights | $20,000 |
| Jul 31, 2019 | Completed final sign-off Aug 2020 | 2474 Great Hy | interior remodel to both units of extg duplex, remodel to extg kitchen, bath, add new laundry to each unit. no added square footage, no increase to extg envelope.Details
interior remodel to both units of extg duplex, remodel to extg kitchen, bath, add new laundry to each unit. no added square footage, no increase to extg envelope. | $90,000 |
| Jun 3, 2019 | Completed final sign-off Jan 2022 | 2050 Alemany Bl | convert extg laundry area to one entertainment room. add one bathroom and 1 laundry room at 1st floor per plan. add one new bedroom. remodel extg kitchen on 2nd floor per plan.Details
convert extg laundry area to one entertainment room. add one bathroom and 1 laundry room at 1st floor per plan. add one new bedroom. remodel extg kitchen on 2nd floor per plan. | $12,000 |
| Feb 5, 2019 | Completed final sign-off Apr 2022 | 1785 San Jose Av | demolish & remove (e) lower & upper wood decks & stairs @ rear of the blg.construct new deck @ 1st floor & stairs leading to 2nd fl @ rear of blg,new fire rated property line walls @ stair & deck.Details
demolish & remove (e) lower & upper wood decks & stairs @ rear of the blg.construct new deck @ 1st floor & stairs leading to 2nd fl @ rear of blg,new fire rated property line walls @ stair & deck. | $27,000 |
| Oct 25, 2018 | Completed final sign-off Dec 2021 | 381 Bartlett St | remodel (e) workshop space to create a new apartment unit on ground floor. **maher n/a**Details
remodel (e) workshop space to create a new apartment unit on ground floor. **maher n/a** | $100,000 |