Back to kitchen remodel contractors
Unicon Construction Solutions Llc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2018 to Jun 2022
- Last 24 months
- 0 permits filed
35 permits since 2000: 30 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 14 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 231 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 1, 2022 | Completed final sign-off Oct 2022 | 79 Summit Wy | (1) kitchen remodel: like for like, adding pot filler above range. two bathroom remodel: like for like. one powder room remodeling like for like. no removal of walls. non structural.Details
(1) kitchen remodel: like for like, adding pot filler above range. two bathroom remodel: like for like. one powder room remodeling like for like. no removal of walls. non structural. | $150,000 |
| Jun 1, 2022 | Completed final sign-off Dec 2022 | 2912 Steiner St | unit #6: kitchen remodel: subpanel upgrade to 100 amps, adding washer/dryer (220v), adding water line for ice maker. no removal of wallsDetails
unit #6: kitchen remodel: subpanel upgrade to 100 amps, adding washer/dryer (220v), adding water line for ice maker. no removal of walls | $50,000 |
| Jan 26, 2022 | Completed final sign-off Sep 2022 | 501 Beale St | full condo remodel: 1 kitchen remodel: like for like run dedicated wire to island via (e) conduit. 2. bathrm remodel turn tub into walk in shower and connect to second walk in shower to create 1 larger w/s with linear drains. 3. new tile flooring throughout. 4. replace lower 4' of drywall throughoutDetails
full condo remodel: 1 kitchen remodel: like for like run dedicated wire to island via (e) conduit. 2. bathrm remodel turn tub into walk in shower and connect to second walk in shower to create 1 larger w/s with linear drains. 3. new tile flooring throughout. 4. replace lower 4' of drywall throughout | $83,000 |
| Nov 12, 2021 | Completed final sign-off Dec 2022 | 123 Yukon St | (1) kitchen remodel. add plubming for island sink and island dishwasher. relocate gas stove. kitchen orientation stays the same.Details
(1) kitchen remodel. add plubming for island sink and island dishwasher. relocate gas stove. kitchen orientation stays the same. | $34,900 |
| Jun 9, 2021 | Completed final sign-off Mar 2022 | 1011 Green St | interior remodel. remove wall between hall and dining room. increase opening between living room and dining room. provide new beams remove post at kitchen and provide steel beam. fill in openings at kitchen at removal walls. relocate laundry to 3rdfloor . remodel kitchen.Details
interior remodel. remove wall between hall and dining room. increase opening between living room and dining room. provide new beams remove post at kitchen and provide steel beam. fill in openings at kitchen at removal walls. relocate laundry to 3rdfloor . remodel kitchen. | $50,000 |
| Apr 26, 2021 | Completed final sign-off Jul 2022 | 2482 Great Hy | unit 2482 & 2484: remodel kitchen and bathroom laundry at both units, in-kind replacement of all windows, enlarge storage at ground floorDetails
unit 2482 & 2484: remodel kitchen and bathroom laundry at both units, in-kind replacement of all windows, enlarge storage at ground floor | $120,000 |
| Apr 26, 2021 | Completed final sign-off Apr 2024 | 1122 Wawona St | revision to pa# 201912189947. move kitchen to lower level. construct new bed and bath at upper level. excavate approx 6" at rear 20'-0" of lower level.Details
revision to pa# 201912189947. move kitchen to lower level. construct new bed and bath at upper level. excavate approx 6" at rear 20'-0" of lower level. | $50,000 |
| Apr 12, 2021 | Completed final sign-off Feb 2022 | 2046 34th Av | bathroom & kitchen remodel. relocate toilet. delete walk-in shower. remove non-load bearing wall in kitchen.Details
bathroom & kitchen remodel. relocate toilet. delete walk-in shower. remove non-load bearing wall in kitchen. | $60,450 |
| Mar 9, 2021 | Completed final sign-off Aug 2021 | 146 Ripley St | kitchen remodeling; replacing cabinets, sink faucet,countertop same location. one powder room remodeling. replace toilet and vanity. no change to layout of walls and openings.Details
kitchen remodeling; replacing cabinets, sink faucet,countertop same location. one powder room remodeling. replace toilet and vanity. no change to layout of walls and openings. | $38,550 |
| Dec 23, 2020 | Expired or cancelled cancelled Feb 2021 | 1705 11th Av | like for like kitchen remodel.Details
like for like kitchen remodel. | $40,000 |
| Dec 10, 2020 | Completed final sign-off Mar 2021 | 403 Main St | bath remodel like for like. turn single vanity to double. kitchen remodel like for like.new laminate flooring throughoutDetails
bath remodel like for like. turn single vanity to double. kitchen remodel like for like.new laminate flooring throughout | $8,500 |
| Nov 20, 2020 | Completed final sign-off Apr 2021 | 259 Prague St | run & install gas outlet, install outlet for gas insert, install duct for kitchen hood.Details
run & install gas outlet, install outlet for gas insert, install duct for kitchen hood. | $37,550 |
| Oct 1, 2020 | Never finaled issued Nov 2020, no final | 1825 44th Av | structural changes: knocking down two walls to open the living room to kitchen. relocating switches to nearby wall. installing hardwood floors.Details
structural changes: knocking down two walls to open the living room to kitchen. relocating switches to nearby wall. installing hardwood floors. | $41,800 |
| Oct 7, 2019 | Completed final sign-off Nov 2019 | 1792 Green St | kitchen remodeling. replace sink, faucet, appliances, cabinets, countertop, floor. add 6 recessed led lightsDetails
kitchen remodeling. replace sink, faucet, appliances, cabinets, countertop, floor. add 6 recessed led lights | $20,000 |
| Jul 31, 2019 | Completed final sign-off Aug 2020 | 2474 Great Hy | interior remodel to both units of extg duplex, remodel to extg kitchen, bath, add new laundry to each unit. no added square footage, no increase to extg envelope.Details
interior remodel to both units of extg duplex, remodel to extg kitchen, bath, add new laundry to each unit. no added square footage, no increase to extg envelope. | $90,000 |
| Jun 3, 2019 | Completed final sign-off Jan 2022 | 2050 Alemany Bl | convert extg laundry area to one entertainment room. add one bathroom and 1 laundry room at 1st floor per plan. add one new bedroom. remodel extg kitchen on 2nd floor per plan.Details
convert extg laundry area to one entertainment room. add one bathroom and 1 laundry room at 1st floor per plan. add one new bedroom. remodel extg kitchen on 2nd floor per plan. | $12,000 |