Unicon Construction Solutions Llc
- Based in
- San Francisco
- On San Francisco permits
- Oct 2018 to Jun 2022
- Last 24 months
- 0 permits filed
35 permits since 2000: 30 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 never finaled. Typically 13 days from filing to permit and 278 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 1, 2021 | Completed final sign-off Mar 2022 | 1705 11th Av | legalize bathroom and room down stair, pre-existing construction room and bath down stairs. demo 1 window and demo stovetop @ ground fl. and approve further work to be done. add lighting and force heating, updade water heater, add gfci and regular duplex outlets.Details
legalize bathroom and room down stair, pre-existing construction room and bath down stairs. demo 1 window and demo stovetop @ ground fl. and approve further work to be done. add lighting and force heating, updade water heater, add gfci and regular duplex outlets. | $60,000 |
| Jul 2, 2021 | Never finaled issued Jul 2021, no final | 1785 San Jose Av | revision to pa 2019-0205-2082 s1 - add hot tub @ deck, widen stair from deck to grade and add gas heaters @ deckDetails
revision to pa 2019-0205-2082 s1 - add hot tub @ deck, widen stair from deck to grade and add gas heaters @ deck | $4,500 |
| Feb 5, 2019 | Completed final sign-off Apr 2022 | 1785 San Jose Av | demolish & remove (e) lower & upper wood decks & stairs @ rear of the blg.construct new deck @ 1st floor & stairs leading to 2nd fl @ rear of blg,new fire rated property line walls @ stair & deck.Details
demolish & remove (e) lower & upper wood decks & stairs @ rear of the blg.construct new deck @ 1st floor & stairs leading to 2nd fl @ rear of blg,new fire rated property line walls @ stair & deck. | $27,000 |