Block 0564, lot 050
2295 Vallejo St
- City’s use
- Single Family Residential
- Built
- 1975
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 830 sq ft
- Zoning
- RM1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 2, 2024 | Completed final sign-off Sep 2024 | 2295 Vallejo St | Roofing Logistics | reroofingDetails
reroofing | $38,000 |
| Dec 23, 2020 | Completed final sign-off Oct 2021 | 2295 Vallejo St | Unicon Construction Solutions Llc | like for like bathroom remodelDetails
like for like bathroom remodel | $17,000 |
| May 27, 2016 | Completed final sign-off Jul 2016 | 2295 Vallejo St | Make Ready Maintenance Inc | ceiling joist reinforcement. roof framing reinforcement above unit 401. voluntary reinforce roof framing. area 350 sq ft. total.Details
ceiling joist reinforcement. roof framing reinforcement above unit 401. voluntary reinforce roof framing. area 350 sq ft. total. | $7,000 |
| Dec 3, 2012 | Completed final sign-off Dec 2013 | 2295 Vallejo St | replace (e) guardrails to meet current cbc/sfbc 2010 building codes to be 42" high with max pickett spacing 3 1/2" apart. no opening at bottom. replace deck boards with non combustible material in kind.Details
replace (e) guardrails to meet current cbc/sfbc 2010 building codes to be 42" high with max pickett spacing 3 1/2" apart. no opening at bottom. replace deck boards with non combustible material in kind. | $5,000 | |
| May 14, 2012 | Completed final sign-off Jun 2012 | 2295 Vallejo St | Sasso Construction Inc. | remodel bathroom and replace kitchen coutner tops, bathrm lighting shall comply with cec 150(k)8,10Details
remodel bathroom and replace kitchen coutner tops, bathrm lighting shall comply with cec 150(k)8,10 | $8,500 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.