Pacheco Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Jun 2026
- Last 24 months
- 2 permits filed
21 permits since 2000: 20 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2026 | Completed final sign-off Sep 2026 | 35 Alton Av | 2nd floor: bathroom remodel. tub to shower. convert existing shower stall to closet.Details
2nd floor: bathroom remodel. tub to shower. convert existing shower stall to closet. | $35,000 |
| May 22, 2025 | Completed final sign-off Aug 2025 | 459 Hazelwood Av | replace (e) double doors and a pair of windows located on lower level at the rear of the house. also replace or repair all dryrot associated to the installtion of each. not visible at street view.Details
replace (e) double doors and a pair of windows located on lower level at the rear of the house. also replace or repair all dryrot associated to the installtion of each. not visible at street view. | $15,000 |
| Jul 16, 2024 | Completed final sign-off Dec 2024 | 26 Urbano Dr | replacing stair framing (entrance of the house). (2) new door openings at the kitchen.Details
replacing stair framing (entrance of the house). (2) new door openings at the kitchen. | $5,000 |
| Apr 16, 2021 | Completed final sign-off Feb 2022 | 459 Hazelwood Av | interior remodel of the existing first floor bathroom.Details
interior remodel of the existing first floor bathroom. | $27,000 |
| Sep 17, 2020 | Completed final sign-off Mar 2022 | 1312 Page St | replace front door/single to a dboule door/victorian per plans. replace (e) 2x overhead lts at top hall w/ led down lts. add overhead downlights & sconces at parlor and dining room.Details
replace front door/single to a dboule door/victorian per plans. replace (e) 2x overhead lts at top hall w/ led down lts. add overhead downlights & sconces at parlor and dining room. | $37,500 |
| Jul 17, 2020 | Completed final sign-off Sep 2020 | 2089 10th Av | replace (e) shower and sink in kind.Details
replace (e) shower and sink in kind. | $17,575 |
| Jul 17, 2020 | Completed final sign-off Oct 2020 | 1312 Page St | replace two exterior doors @ rear of house in kind.Details
replace two exterior doors @ rear of house in kind. | $7,525 |
| Dec 30, 2019 | Completed final sign-off Apr 2020 | 18 Quintara St | replace (e) cabinets, counter tops, & backsplash w/ new as kind.Details
replace (e) cabinets, counter tops, & backsplash w/ new as kind. | $42,000 |
| Oct 9, 2018 | Completed final sign-off Jul 2019 | 1312 Page St | repair all cracks on walls, remodel master bathroom and powder room. add laundry facility at lower floor. replace front door back to original 7 ft heightDetails
repair all cracks on walls, remodel master bathroom and powder room. add laundry facility at lower floor. replace front door back to original 7 ft height | $150,000 |
| Oct 9, 2018 | Completed final sign-off Oct 2018 | 1326 29th Av | repair siding 112 sq ft. not visible from streetDetails
repair siding 112 sq ft. not visible from street | $3,750 |
| Jul 13, 2018 | Completed final sign-off Sep 2020 | 200 Ripley St | add new beam to replace load bearing wall ref pa 2018-0601-0824Details
add new beam to replace load bearing wall ref pa 2018-0601-0824 | $3,000 |
| Jun 1, 2018 | Completed final sign-off Oct 2018 | 200 Ripley St | full kitchen remodel, w/ exterior access from kitchenDetails
full kitchen remodel, w/ exterior access from kitchen | $47,500 |
| Feb 23, 2018 | Completed final sign-off Apr 2018 | 261 32nd Av | interior remodel of existing second floor guest bathroom and reinstall glass panel at master bathroom.Details
interior remodel of existing second floor guest bathroom and reinstall glass panel at master bathroom. | $28,000 |
| Jan 22, 2018 | Completed final sign-off Jun 2018 | 273 Clipper St | repair and replace as kind. dryrot at rear lower framing below rear door entryDetails
repair and replace as kind. dryrot at rear lower framing below rear door entry | $17,000 |
| Jul 27, 2017 | Completed final sign-off Feb 2018 | 632 Diamond St | kitchen remodeling and add skylight; replace windowsDetails
kitchen remodeling and add skylight; replace windows | $20,000 |
| Apr 4, 2017 | Completed final sign-off Jun 2017 | 1326 29th Av | replace existing exterior front finishes and stairs due to failed water barrier. repair stucco due to moisture penetration on south wall, all work to be done in kind. restore existing railing in kind.Details
replace existing exterior front finishes and stairs due to failed water barrier. repair stucco due to moisture penetration on south wall, all work to be done in kind. restore existing railing in kind. | $26,500 |
| Dec 28, 2016 | Completed final sign-off May 2017 | 261 32nd Av | interior remodel of (e) 1st flr kitchen. range and new ventilation duct to roofDetails
interior remodel of (e) 1st flr kitchen. range and new ventilation duct to roof | $3,800 |
| Oct 23, 2015 | Completed final sign-off Feb 2016 | 1326 29th Av | replace existing shower with a in wall tub, plumbing rough-in to accomodate new tub, install new tiles 3x walls & repair wood floor to tub.Details
replace existing shower with a in wall tub, plumbing rough-in to accomodate new tub, install new tiles 3x walls & repair wood floor to tub. | $8,322 |
| Jun 24, 2015 | Completed final sign-off Dec 2015 | 634 Diamond St | interior remodel of existing apartment including: replacement of kitchen cabinets, plumbing & appliances, removal of (e) fireplace in den, relocate laundry closet. no work to common areas nor to (e) building envelope.Details
interior remodel of existing apartment including: replacement of kitchen cabinets, plumbing & appliances, removal of (e) fireplace in den, relocate laundry closet. no work to common areas nor to (e) building envelope. | $60,000 |
| Feb 18, 2015 | Completed final sign-off Aug 2015 | 630 Diamond St | interior remodel: remodel (e) kitchen,dining & living room - new cabinets, finishes to replace existing.Details
interior remodel: remodel (e) kitchen,dining & living room - new cabinets, finishes to replace existing. | $78,000 |
| Nov 30, 2009 | Expired or cancelled cancelled Mar 2010 | 30 Levant St | replace extg tile with new. upgrade rough plumg to code, new supply. add 1 mechanical fan/electrical.Details
replace extg tile with new. upgrade rough plumg to code, new supply. add 1 mechanical fan/electrical. | $6,000 |