Pacheco Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Jun 2026
- Last 24 months
- 2 permits filed
21 permits since 2000: 20 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 completed. Typically 4 days from filing to permit and 106 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 16, 2024 | Completed final sign-off Dec 2024 | 26 Urbano Dr | replacing stair framing (entrance of the house). (2) new door openings at the kitchen.Details
replacing stair framing (entrance of the house). (2) new door openings at the kitchen. | $5,000 |
| Apr 4, 2017 | Completed final sign-off Jun 2017 | 1326 29th Av | replace existing exterior front finishes and stairs due to failed water barrier. repair stucco due to moisture penetration on south wall, all work to be done in kind. restore existing railing in kind.Details
replace existing exterior front finishes and stairs due to failed water barrier. repair stucco due to moisture penetration on south wall, all work to be done in kind. restore existing railing in kind. | $26,500 |