Back to bathroom remodel contractors
Pacheco Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Nov 2009 to Jun 2026
- Last 24 months
- 2 permits filed
21 permits since 2000: 20 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 1 days from filing to permit and 174 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2026 | Completed final sign-off Sep 2026 | 35 Alton Av | 2nd floor: bathroom remodel. tub to shower. convert existing shower stall to closet.Details
2nd floor: bathroom remodel. tub to shower. convert existing shower stall to closet. | $35,000 |
| Apr 16, 2021 | Completed final sign-off Feb 2022 | 459 Hazelwood Av | interior remodel of the existing first floor bathroom.Details
interior remodel of the existing first floor bathroom. | $27,000 |
| Oct 9, 2018 | Completed final sign-off Jul 2019 | 1312 Page St | repair all cracks on walls, remodel master bathroom and powder room. add laundry facility at lower floor. replace front door back to original 7 ft heightDetails
repair all cracks on walls, remodel master bathroom and powder room. add laundry facility at lower floor. replace front door back to original 7 ft height | $150,000 |
| Feb 23, 2018 | Completed final sign-off Apr 2018 | 261 32nd Av | interior remodel of existing second floor guest bathroom and reinstall glass panel at master bathroom.Details
interior remodel of existing second floor guest bathroom and reinstall glass panel at master bathroom. | $28,000 |