Block 0160, lot 030
822 Pacific Ave
- City’s use
- Multi-Family Residential
- Built
- 1962
- Stories
- 12
- Units
- 200
- Lot
- 50,477 sq ft
- Zoning
- RM4
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 8, 2025 | Completed final sign-off Sep 2026 | 838 Pacific Av | Cahill Contractors Llc. | repair of "unsafe conditions" outlined in facade inspection and maintenance, ab-110. the repair will include the repair of exterior concrete wall spalling from eport by rgh, as required by the sf dbi facade ordinance for building facade inspection and maintenance, ab-110.Details
repair of "unsafe conditions" outlined in facade inspection and maintenance, ab-110. the repair will include the repair of exterior concrete wall spalling from eport by rgh, as required by the sf dbi facade ordinance for building facade inspection and maintenance, ab-110. | $200,000 |
| Feb 5, 2024 | Completed final sign-off May 2024 | 838 Pacific Av | San Francisco Fire Protection | to verify extg sound levels in sleeping areas. comply with sffc section 1103.7.6.1 indicating the dba reading in each living area and sleeping area of at least 75 dbaDetails
to verify extg sound levels in sleeping areas. comply with sffc section 1103.7.6.1 indicating the dba reading in each living area and sleeping area of at least 75 dba | |
| Jul 22, 2019 | Completed final sign-off Aug 2019 | 838 Pacific Av | Cahill Contractors Inc | revised extg parking to provide complying ada paving space. add loading zone, delete 2 parking space. revision to app#201510190132. n/a for maherDetails
revised extg parking to provide complying ada paving space. add loading zone, delete 2 parking space. revision to app#201510190132. n/a for maher | |
| May 30, 2019 | Completed final sign-off Jul 2019 | 838 Pacific Av | Westates Mechanical Corporation Inc | revision to pa #201902122758. add 19 sprinkler heads, 1 sidewall in trash enclosure, 4 pendants and 4 uprights in ground fl elvevator lobby. add 1 upright head in the (e) janitor closet from 2nd to 12th fl.Details
revision to pa #201902122758. add 19 sprinkler heads, 1 sidewall in trash enclosure, 4 pendants and 4 uprights in ground fl elvevator lobby. add 1 upright head in the (e) janitor closet from 2nd to 12th fl. | $9,785 |
| Feb 12, 2019 | Completed final sign-off Jul 2019 | 838 Pacific Av | Westates Mechanical Corporation Inc | replace existing fire sprinkler head with new. ref pa #201510190132-s4.Details
replace existing fire sprinkler head with new. ref pa #201510190132-s4. | $31,930 |
| Sep 7, 2018 | Completed final sign-off Aug 2019 | 838 Pacific Av | Siemens Industry, Inc. | 2 way communications system installation for the buildingDetails
2 way communications system installation for the building | $19,000 |
| Aug 22, 2018 | Completed final sign-off Jul 2019 | 838 Pacific Av | Cahill Contractors Llc. | revision to app#201510190132 to provide pipe wrap at shower per inspectionsDetails
revision to app#201510190132 to provide pipe wrap at shower per inspections | $1,000 |
| Oct 12, 2017 | Completed final sign-off Aug 2019 | 838 Pacific Av | Garnett Signs Llc | 64 evacuation maps: all floors (1-12).Details
64 evacuation maps: all floors (1-12). | $24,360 |
| Aug 25, 2017 | Completed final sign-off Jul 2019 | 838 Pacific Av | Cahill Contractors Inc | structural connection for roof top exterior building maintenance davit system - 24 locationsDetails
structural connection for roof top exterior building maintenance davit system - 24 locations | $2,500 |
| May 18, 2017 | Expired or cancelled withdrawn May 2017 | 838 Pacific Av | Westates Mechanical Corporation Inc | install fire sprinkler head 157 to tal, replace (e) fire pump and backflow preventerDetails
install fire sprinkler head 157 to tal, replace (e) fire pump and backflow preventer | $100,000 |
| Oct 19, 2015 | Completed final sign-off Oct 2019 | 838 Pacific Av | Cahill Contractors Llc. | horizontal addition. co gen enclosure. renov unit-kitchen/baths-new appl&plumbing fixtures.g/fl-offices,community rm,laundry.new interior main entrances on pacific ave.replac all windows in kind,new entry drs.landscaping along pacific ave.Details
horizontal addition. co gen enclosure. renov unit-kitchen/baths-new appl&plumbing fixtures.g/fl-offices,community rm,laundry.new interior main entrances on pacific ave.replac all windows in kind,new entry drs.landscaping along pacific ave. | $18,000,000 |
| Apr 22, 2013 | Expired or cancelled cancelled Sep 2023 | 838 Pacific Av | upgrade fire alarm system with new programmed fire alarm panel & new fire alarm annunciator panel, new horn/strobes to replace existing horn/strobes or bells, new pull stations to replace existing pull stations & new smoke detectors to replace existing.Details
upgrade fire alarm system with new programmed fire alarm panel & new fire alarm annunciator panel, new horn/strobes to replace existing horn/strobes or bells, new pull stations to replace existing pull stations & new smoke detectors to replace existing. | $80,000 | |
| Feb 14, 2012 | Expired or cancelled cancelled Jan 2026 | 838 Pacific Av | remove & replace existing domestic hot water heaters & cogeneration unit.Details
remove & replace existing domestic hot water heaters & cogeneration unit. | $300,000 | |
| May 21, 2008 | Never finaled issued May 2008, no final | 838 Pacific Av | revision to pa# 2005/11/14/8049 to relocate previously proposed disabled accessible parking space, provide new accessable path of travel from the new diabled parking space to the new curb rampDetails
revision to pa# 2005/11/14/8049 to relocate previously proposed disabled accessible parking space, provide new accessable path of travel from the new diabled parking space to the new curb ramp | $2,000 | |
| Mar 12, 2008 | Completed final sign-off Mar 2008 | 838 Pacific Av | F D C Construction Inc | to renew app#2006/02/27/5475 for final inspection only.Details
to renew app#2006/02/27/5475 for final inspection only. | |
| Dec 10, 2007 | Completed final sign-off Mar 2008 | 838 Pacific Av | refer to pa# 2005/11/14/8049. new concrete ramp for disables access near elevators and added directional signs to elevator entrance. no structural work.Details
refer to pa# 2005/11/14/8049. new concrete ramp for disables access near elevators and added directional signs to elevator entrance. no structural work. | $10,000 | |
| Sep 6, 2007 | Never finaled issued Sep 2007, no final | 838 Pacific Av | K Y J Construction Company | install (n) quick response pendent heads in the youth center on ground floor in accordance to p.a. #200602275475.Details
install (n) quick response pendent heads in the youth center on ground floor in accordance to p.a. #200602275475. | $2,500 |
| Apr 26, 2007 | Completed final sign-off Oct 2008 | 838 Pacific Av | install fire sprinklers (total: 73 each) at 6 units residence on 12th floor.Details
install fire sprinklers (total: 73 each) at 6 units residence on 12th floor. | $11,000 | |
| Mar 14, 2006 | Never finaled issued Mar 2006, no final | 838 Pacific Av | relocation of mailboxes to a new furred wallDetails
relocation of mailboxes to a new furred wall | $21,000 | |
| Feb 27, 2006 | Expired or cancelled expired Mar 2008 | 838 Pacific Av | conversion of (e) tenant association room into a (n) youth center. also 1 (e) toilet room will be converted to handicap accessible (unisex r.r.)Details
conversion of (e) tenant association room into a (n) youth center. also 1 (e) toilet room will be converted to handicap accessible (unisex r.r.) | $200,000 | |
| Nov 14, 2005 | Completed final sign-off Oct 2008 | 838 Pacific Av | J M A Construction | interior remodeling extg space at 12 floor for six dwelling units/construction of new van accessible parking/upgrades to the accessible path of travel including h.c. ramp modification to one extg elevator including new control and signageDetails
interior remodeling extg space at 12 floor for six dwelling units/construction of new van accessible parking/upgrades to the accessible path of travel including h.c. ramp modification to one extg elevator including new control and signage | $808,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cahill Contractors Llc. (3), Westates Mechanical Corporation Inc (3), Cahill Contractors Inc (2), F D C Construction Inc, Garnett Signs Llc, J M A Construction, K Y J Construction Company, San Francisco Fire Protection, Siemens Industry, Inc.
- Architects
- Jim Fagler (2), Steve Kodama (2), Zahary Nathan (2), Mauricio Melchor
- Engineers
- Ali G Mahalatinia, Donald Wulschleger, Edward Wong, R.E. Spitzka, Thomas L. Swayze
- Authorized agent-otherss
- James Fagler
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.