Permit GraphShortlistSan Francisco building permits since 2000

Mauricio Melchor

License
C36829
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect, authorized agent-others
Firm
Aia
On San Francisco permits
Jan 2005 to Oct 2020

38 permits since 2000 (architect on 33 permits, authorized agent-others on 5 permits): 30 completed, 4 never finaled, 4 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
D.F.P.F Corp Dba Fine Line Construction (25), Cahill Contractors Llc. (4), Amone Corp (2), Nibbi Bros Assoc Inc. (2), Arana Group, Inc., James E Roberts-Obayashi Corporation, Pribuss Engineering Inc, Sabah International Incorporated
Architects
Lisa Gelfand (5)
Engineers
Daniel Manhelm (2), Meng Hsiu Chen (2)
Authorized agents
James D. Fagler (10)

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Oct 15, 2020Never finaled
filed Oct 2020, never issued
631 24th Avproposed 3rd story vertical and horizontal addition at rear portion of existing 2-story structure (separated by a seismic joint). addition includes new wet bar, laundry room, kitchen, 3.5 bathrooms, storage room and exterior decks.
Details
Permit
202010156600

proposed 3rd story vertical and horizontal addition at rear portion of existing 2-story structure (separated by a seismic joint). addition includes new wet bar, laundry room, kitchen, 3.5 bathrooms, storage room and exterior decks.

Open the permit page

$300,000
Dec 17, 2019Completed
final sign-off Jan 2023
2060 Folsom StAmone Corp, Arana Group, Inc.tenant improvement for (e) tenant space at ground lvl to host a group e family day care center. proposed improvements include non-structural walls, ceilings & finishes. (n) electrical, plumbing & automatic sprinkler system.
Details
Permit
201912179725
Permit issued
Dec 9, 2020
Final sign-off
Jan 6, 2023

tenant improvement for (e) tenant space at ground lvl to host a group e family day care center. proposed improvements include non-structural walls, ceilings & finishes. (n) electrical, plumbing & automatic sprinkler system.

Open the permit page

$1,000,000
Mar 15, 2019Completed
final sign-off Jul 2019
817 Ellsworth StD.F.P.F Corp Dba Fine Line Constructionbldg 25: moh rad priority permit #201809241174 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.
Details
Permit
201903155369
Permit issued
Jul 3, 2019
Final sign-off
Jul 19, 2019

bldg 25: moh rad priority permit #201809241174 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.

Open the permit page

Mar 15, 2019Completed
final sign-off Jul 2019
845 Ellsworth StD.F.P.F Corp Dba Fine Line Constructionbldg 23: moh rad priority permit #20189241173 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.
Details
Permit
201903155368
Permit issued
Jul 3, 2019
Final sign-off
Jul 19, 2019

bldg 23: moh rad priority permit #20189241173 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.

Open the permit page

Mar 15, 2019Completed
final sign-off Jul 2019
861 Ellsworth StD.F.P.F Corp Dba Fine Line Constructionbldg 22: moh rad priority permit #201809241175 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.
Details
Permit
201903155367
Permit issued
Jul 3, 2019
Final sign-off
Jul 22, 2019

bldg 22: moh rad priority permit #201809241175 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.

Open the permit page

Mar 15, 2019Completed
final sign-off Jul 2019
801 Ellsworth StD.F.P.F Corp Dba Fine Line Constructionbldg 26: moh rad priority permit #201809241179 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.
Details
Permit
201903155370
Permit issued
Jul 3, 2019
Final sign-off
Jul 22, 2019

bldg 26: moh rad priority permit #201809241179 to be modified by deleting 4 awnings above second fl entrance doors due to safety concerns.

Open the permit page

Sep 24, 2018Completed
final sign-off Aug 2019
524 Alemany BlD.F.P.F Corp Dba Fine Line Constructionrevision to pa 201602189892 mohrad. building 17, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code
Details
Permit
201809241180
Permit issued
Oct 2, 2018
Final sign-off
Aug 16, 2019

revision to pa 201602189892 mohrad. building 17, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code

Open the permit page

Sep 24, 2018Completed
final sign-off Aug 2019
548 Alemany BlD.F.P.F Corp Dba Fine Line Constructionbldg 14 - moh rad priority mod permit per 2016-0218-9879 revision to approver permit 2016-0218-9879 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code
Details
Permit
201809241176
Permit issued
Oct 2, 2018
Final sign-off
Aug 12, 2019

bldg 14 - moh rad priority mod permit per 2016-0218-9879 revision to approver permit 2016-0218-9879 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code

Open the permit page

Sep 24, 2018Completed
final sign-off Aug 2019
901 Ellsworth StD.F.P.F Corp Dba Fine Line Constructionrevision to pa 201602189893 mohrad. building 19, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code
Details
Permit
201809241182
Permit issued
Oct 2, 2018
Final sign-off
Aug 16, 2019

revision to pa 201602189893 mohrad. building 19, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code

Open the permit page

Sep 24, 2018Completed
final sign-off Jul 2019
945 Ellsworth StD.F.P.F Corp Dba Fine Line Constructionbldg 12 moh rad priority mod permit per 2016-0218-9878 revision to approver permit 2016-0218-9878 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code
Details
Permit
201809241171
Permit issued
Oct 2, 2018
Final sign-off
Jul 18, 2019

bldg 12 moh rad priority mod permit per 2016-0218-9878 revision to approver permit 2016-0218-9878 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code

Open the permit page

Sep 24, 2018Completed
final sign-off Jul 2019
957 Ellsworth StD.F.P.F Corp Dba Fine Line Constructionrevision to pa 201602189871 mohrad. building 11, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code
Details
Permit
201809241183
Permit issued
Oct 2, 2018
Final sign-off
Jul 10, 2019

revision to pa 201602189871 mohrad. building 11, clarify full cope of accessibility by mayor's office of disability enforcement of 2010 ada standards and cal build code

Open the permit page

Sep 24, 2018Completed
final sign-off Jul 2019
925 Ellsworth StD.F.P.F Corp Dba Fine Line Constructionbldg 15 - moh rad priority mod permit per 2016-0218-9890 revision to approver permit 2016-0218-9890 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code
Details
Permit
201809241178
Permit issued
Oct 2, 2018
Final sign-off
Jul 31, 2019

bldg 15 - moh rad priority mod permit per 2016-0218-9890 revision to approver permit 2016-0218-9890 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code

Open the permit page

Sep 24, 2018Completed
final sign-off Aug 2019
536 Alemany BlD.F.P.F Corp Dba Fine Line Constructionbldg 16 - moh rad priority mod permit per 2016-0218-9891 revision to approver permit 2016-0218-9891 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code
Details
Permit
201809241177
Permit issued
Oct 2, 2018
Final sign-off
Aug 16, 2019

bldg 16 - moh rad priority mod permit per 2016-0218-9891 revision to approver permit 2016-0218-9891 to clarify full scope of accessibility by the mayor's office of disability in the enforcement of the 2010 ada standards and the ca bldg code

Open the permit page

Sep 24, 2018Completed
final sign-off Aug 2019
817 Ellsworth StD.F.P.F Corp Dba Fine Line Constructionmoh rad priority-mod permit per permit 201602189880 rev to approved permit 2011602189880 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbc
Details
Permit
201809241174
Permit issued
Oct 2, 2018
Final sign-off
Aug 16, 2019

moh rad priority-mod permit per permit 201602189880 rev to approved permit 2011602189880 to clarify full scope of accessibility by the mayors office of disability in the enforcement to the 2010 ada standards and the cbc

Open the permit page

Aug 22, 2018Completed
final sign-off Jul 2019
838 Pacific AvCahill Contractors Llc.revision to app#201510190132 to provide pipe wrap at shower per inspections
Details
Permit
201808227984
Permit issued
Aug 27, 2018
Final sign-off
Jul 29, 2019

revision to app#201510190132 to provide pipe wrap at shower per inspections

Open the permit page

$1,000
Aug 22, 2018Completed
final sign-off Mar 2019
795 Pacific AvCahill Contractors Llc.revision to app#201510200191 to provide wrap at shower pipe per field inspection
Details
Permit
201808227985
Permit issued
Aug 27, 2018
Final sign-off
Mar 21, 2019

revision to app#201510200191 to provide wrap at shower pipe per field inspection

Open the permit page

$1,000
Sep 26, 2017Never finaled
issued Sep 2017, no final
1760 Bush StNibbi Bros Assoc Inc.rooftop: moh rad priority permit: rev to pa#201510270955: provide 2 access panels for elevator hoistway / smoke detector access.
Details
Permit
201709269596
Permit issued
Sep 26, 2017

rooftop: moh rad priority permit: rev to pa#201510270955: provide 2 access panels for elevator hoistway / smoke detector access.

Open the permit page

$1,500
May 4, 2016Never finaled
issued May 2016, no final
174 Appleton AvD.F.P.F Corp Dba Fine Line Constructionrevision to 2015 0402 2642 to document accessibility features bldg e 174, 176, 178, 180, 182, 184, 186, 188, 190, 192, 194, 196, 198 appleton 717 & 719 holly park cir
Details
Permit
201605046505
Permit issued
May 5, 2016

revision to 2015 0402 2642 to document accessibility features bldg e 174, 176, 178, 180, 182, 184, 186, 188, 190, 192, 194, 196, 198 appleton 717 & 719 holly park cir

Open the permit page

May 4, 2016Completed
final sign-off Sep 2017
45 Patton StD.F.P.F Corp Dba Fine Line Constructionrevision to 2015 0402 2638 to document accessibility features bldg j 45, 51, 57, 63, 69, 75, 83, 85 patton st 129, 129a, 131, 133 highland
Details
Permit
201605046510
Permit issued
May 5, 2016
Final sign-off
Sep 27, 2017

revision to 2015 0402 2638 to document accessibility features bldg j 45, 51, 57, 63, 69, 75, 83, 85 patton st 129, 129a, 131, 133 highland

Open the permit page

May 4, 2016Completed
final sign-off Feb 2017
112 Appleton AvD.F.P.F Corp Dba Fine Line Constructionrevision to 2015 0402 2639 to document accessibility features bldg b 112, 114, 116, 118, 120, 122, 124, 126, 128, 130, 132, 134 appleton ave
Details
Permit
201605046502
Permit issued
May 5, 2016
Final sign-off
Feb 27, 2017

revision to 2015 0402 2639 to document accessibility features bldg b 112, 114, 116, 118, 120, 122, 124, 126, 128, 130, 132, 134 appleton ave

Open the permit page

May 4, 2016Completed
final sign-off Dec 2016
169 Highland AvD.F.P.F Corp Dba Fine Line Constructionrevision to 2015 0402 2635 to document accessibility features bldg g 169-179 highland ave; includes 169a, 171a, 1763a
Details
Permit
201605046507
Permit issued
May 5, 2016
Final sign-off
Dec 9, 2016

revision to 2015 0402 2635 to document accessibility features bldg g 169-179 highland ave; includes 169a, 171a, 1763a

Open the permit page

May 4, 2016Never finaled
issued May 2016, no final
156 Appleton AvD.F.P.F Corp Dba Fine Line Constructionrevision to 2015 0402 2641 to document accessibility features bldg d 156, 158, 160, 162, 164, 166, 168, 170, 172 appleton
Details
Permit
201605046504
Permit issued
May 5, 2016

revision to 2015 0402 2641 to document accessibility features bldg d 156, 158, 160, 162, 164, 166, 168, 170, 172 appleton

Open the permit page

May 4, 2016Completed
final sign-off Dec 2016
181 Highland AvD.F.P.F Corp Dba Fine Line Constructionrevision to 2015 0402 2634 to document accessibility features bldg f 181-199 & 199a highland ave; includes 183a, 185a 725, 727 holly park cir
Details
Permit
201605046506
Permit issued
May 5, 2016
Final sign-off
Dec 9, 2016

revision to 2015 0402 2634 to document accessibility features bldg f 181-199 & 199a highland ave; includes 183a, 185a 725, 727 holly park cir

Open the permit page

May 4, 2016Completed
final sign-off Jan 2017
136 Appleton AvD.F.P.F Corp Dba Fine Line Constructionrevision to 2015 0402 2640 to document accessibility features bldg c 136, 138, 140, 142, 144, 146, 148, 150, 152, 154 appleton ave
Details
Permit
201605046503
Permit issued
May 5, 2016
Final sign-off
Jan 23, 2017

revision to 2015 0402 2640 to document accessibility features bldg c 136, 138, 140, 142, 144, 146, 148, 150, 152, 154 appleton ave

Open the permit page

May 4, 2016Completed
final sign-off Sep 2017
137 Highland AvD.F.P.F Corp Dba Fine Line Constructionrevision to 2015 0402 2637 to document accessibility features bldg i 137-153 highlands; includes 137a, 145a, 147a
Details
Permit
201605046509
Permit issued
May 5, 2016
Final sign-off
Sep 27, 2017

revision to 2015 0402 2637 to document accessibility features bldg i 137-153 highlands; includes 137a, 145a, 147a

Open the permit page

May 4, 2016Completed
final sign-off Feb 2017
3 Patton StD.F.P.F Corp Dba Fine Line Constructionrevision to 2015 0402 2626 to document accessibility features 1,3, 9,15,21,27,33,39 - patton st 102, 104, 106, 108, 110 appleton ave
Details
Permit
201605046499
Permit issued
May 5, 2016
Final sign-off
Feb 28, 2017

revision to 2015 0402 2626 to document accessibility features 1,3, 9,15,21,27,33,39 - patton st 102, 104, 106, 108, 110 appleton ave

Open the permit page

May 4, 2016Completed
final sign-off Jan 2017
155 Highland AvD.F.P.F Corp Dba Fine Line Constructionrevision to 2015 0402 2636 to document accessibility features bldg h 155-167 highland; includes 155a, 159a, 161a
Details
Permit
201605046508
Permit issued
May 5, 2016
Final sign-off
Jan 23, 2017

revision to 2015 0402 2636 to document accessibility features bldg h 155-167 highland; includes 155a, 159a, 161a

Open the permit page

Mar 16, 2016Completed
final sign-off Aug 2019
989 Ellsworth StD.F.P.F Corp Dba Fine Line Constructionrad priority processing. erect 1 story, 4-dwelling, no basement, type v-b. deferred til issuance of addenda #1,approved by director.
Details
Permit
201603162239
Permit issued
Aug 29, 2016
Final sign-off
Aug 27, 2019

rad priority processing. erect 1 story, 4-dwelling, no basement, type v-b. deferred til issuance of addenda #1,approved by director.

Open the permit page

$1,768,000
Mar 16, 2016Completed
final sign-off Sep 2019
560 Alemany BlD.F.P.F Corp Dba Fine Line Constructionrad priority processing.erect 1 story, no basement, type v-b, community, office bldg. deferred til issuance of addenda #1,approved by director.
Details
Permit
201603162236
Permit issued
Aug 29, 2016
Final sign-off
Sep 20, 2019

rad priority processing.erect 1 story, no basement, type v-b, community, office bldg. deferred til issuance of addenda #1,approved by director.

Open the permit page

$2,409,000
Mar 4, 2016Expired or cancelled
withdrawn Jun 2016
430 Turk StD.F.P.F Corp Dba Fine Line Constructionrevision to add exterior building maintenance system permit 201603010848.
Details
Permit
201603041293

revision to add exterior building maintenance system permit 201603010848.

Open the permit page

$100,000
Jan 28, 2016Completed
final sign-off Sep 2017
227 Bay StAmone Corpmoh rad priority permit- mod permit per permit #201503060182; maher n/a
Details
Permit
201601288191
Permit issued
Jan 29, 2016
Final sign-off
Sep 7, 2017

moh rad priority permit- mod permit per permit #201503060182; maher n/a

Open the permit page

Oct 27, 2015Completed
final sign-off Aug 2018
895 Pacific AvCahill Contractors Llc., Sabah International Incorporated(moh rad priority project) sprinker upgrade, mep upgrades, finish upgrade, mobilth units, accessible path of tralver, common area upgrades. ---payment defer till addendum issue per mr. tom hui director, 2/4/16. n/a for maher ordinance.155-13.
Details
Permit
201510270842
Permit issued
May 17, 2016
Final sign-off
Aug 30, 2018

(moh rad priority project) sprinker upgrade, mep upgrades, finish upgrade, mobilth units, accessible path of tralver, common area upgrades. ---payment defer till addendum issue per mr. tom hui director, 2/4/16. n/a for maher ordinance.155-13.

Open the permit page

$5,000,000
Oct 27, 2015Completed
final sign-off Sep 2018
1760 Bush StPribuss Engineering Inc, Nibbi Bros Assoc Inc.(moh rad priority project) sprinker upgrade, mep upgrades, finish upgrade, remodel (e) units to be mobility units, roofing, accessible path of tralver, common area rehabilitation. n/a for maher ordinance.155-13.
Details
Permit
201510270955
Permit issued
May 12, 2016
Final sign-off
Sep 21, 2018

(moh rad priority project) sprinker upgrade, mep upgrades, finish upgrade, remodel (e) units to be mobility units, roofing, accessible path of tralver, common area rehabilitation. n/a for maher ordinance.155-13.

Open the permit page

$7,000,000
Oct 27, 2015Completed
final sign-off Mar 2019
655 Pacific AvCahill Contractors Llc.(moh rad priority project)sprinker upgrade, mep upgrades, finish upgrade, mobilth units, accessible path of tralver, common area upgrades.
Details
Permit
201510270832
Permit issued
May 17, 2016
Final sign-off
Mar 15, 2019

(moh rad priority project)sprinker upgrade, mep upgrades, finish upgrade, mobilth units, accessible path of tralver, common area upgrades.

Open the permit page

$5,000,000
Feb 24, 2009Expired or cancelled
cancelled Jan 2026
1675 Eddy Stbldg #3 -remove (e) low walls @ existing balconies; construct new walls to enclose (e) balconies; new fibercement siding & new wood trim to match adjacent existing; new modif bit roofing over newly enclosed area to match existing; new pvc windows @ new wall to match existing.
Details
Permit
200902242663

bldg #3 -remove (e) low walls @ existing balconies; construct new walls to enclose (e) balconies; new fibercement siding & new wood trim to match adjacent existing; new modif bit roofing over newly enclosed area to match existing; new pvc windows @ new wall to match existing.

Open the permit page

$24,000
Feb 24, 2009Expired or cancelled
cancelled Jan 2026
1150 Pierce Stbldg #2 - remove (e) low walls @ (e) ballonies; construct new walls to enclose balconies; new fibercement siding & new wood trim to match adjacent existing; new pvc windows @ new wall to match existing.; new mod bit roofing over newly enclosed area to match existing.
Details
Permit
200902242661

bldg #2 - remove (e) low walls @ (e) ballonies; construct new walls to enclose balconies; new fibercement siding & new wood trim to match adjacent existing; new pvc windows @ new wall to match existing.; new mod bit roofing over newly enclosed area to match existing.

Open the permit page

$18,000
Jan 31, 2008Expired or cancelled
expired Dec 2009
1035 Market Strevision to p/a #2007.07.28.6439. deletion of restroom fixtures @ basement and floor #2,3,4,5,7. installation of smoke guard smoke doors at elevators on all floors. revision of restroom layout at 6th & 7th floor.
Details
Permit
200801313685
Permit issued
Feb 21, 2008
Final sign-off
Aug 10, 2009

revision to p/a #2007.07.28.6439. deletion of restroom fixtures @ basement and floor #2,3,4,5,7. installation of smoke guard smoke doors at elevators on all floors. revision of restroom layout at 6th & 7th floor.

Open the permit page

Jan 3, 2005Completed
final sign-off Mar 2005
34 Turk StJames E Roberts-Obayashi Corporationpatch and repair of (e) wallboard part of a 1-hr assembly. new wallboard to be 5/8" type -x wall boa
Details
Permit
200501032448
Permit issued
Jan 3, 2005
Final sign-off
Mar 8, 2005

patch and repair of (e) wallboard part of a 1-hr assembly. new wallboard to be 5/8" type -x wall boa

Open the permit page

$100