Block 0336, lot 005
430 Turk St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
21 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 6, 2016 | Never finaled issued Sep 2016, no final | 430 Turk St | street space w/mtaDetails
street space w/mta | ||
| May 11, 2016 | Completed final sign-off Jan 2017 | 430 Turk St | Sabah International Incorporated | replace existing fa devices with new. n/a maher ord. 155-13Details
replace existing fa devices with new. n/a maher ord. 155-13 | $50,419 |
| Mar 14, 2016 | Completed final sign-off Jan 2017 | 430 Turk St | Tony Ng Plumbing Co | relocate 46 sprinklers to center of tile, plug 8, add 9 total 55 sprinklers due to new ceiling grid and partition changes in an extg fully sprinklered 9 story residential type 1b bldg with 1 basement. replace extg fire pump in kind. ref #201603010848 n/a for maherDetails
relocate 46 sprinklers to center of tile, plug 8, add 9 total 55 sprinklers due to new ceiling grid and partition changes in an extg fully sprinklered 9 story residential type 1b bldg with 1 basement. replace extg fire pump in kind. ref #201603010848 n/a for maher | $69,600 |
| Mar 8, 2016 | Never finaled issued Mar 2016, no final | 430 Turk St | street spaceDetails
street space | ||
| Mar 4, 2016 | Expired or cancelled withdrawn Jun 2016 | 430 Turk St | D.F.P.F Corp Dba Fine Line Construction | revision to add exterior building maintenance system permit 201603010848.Details
revision to add exterior building maintenance system permit 201603010848. | $100,000 |
| Mar 1, 2016 | Completed final sign-off Jan 2017 | 430 Turk St | D.F.P.F Corp Dba Fine Line Construction | revision ot pa# 201504173911 in order to clarify the full scope of accessibility improvemts, required (mod). rad program submittal, structural improvements on 9th flr,moderization of units kitchen,bathroom,floor finishes, re-configursation for accessiblility(5units) sprinklers under seperate permit,Details
revision ot pa# 201504173911 in order to clarify the full scope of accessibility improvemts, required (mod). rad program submittal, structural improvements on 9th flr,moderization of units kitchen,bathroom,floor finishes, re-configursation for accessiblility(5units) sprinklers under seperate permit, | |
| Apr 17, 2015 | Completed final sign-off Jan 2017 | 430 Turk St | D.F.P.F Corp Dba Fine Line Construction | moh rad program structural improvements at 9th floor modernization of units to include kitchens, bathrooms, flooring and finishes, reconfiguring units for accessibility (5) sprinklers under separate permitDetails
moh rad program structural improvements at 9th floor modernization of units to include kitchens, bathrooms, flooring and finishes, reconfiguring units for accessibility (5) sprinklers under separate permit | $11,186,639 |
| Oct 10, 2013 | Completed final sign-off Nov 2013 | 440 Turk St | Kent M Lim & Company Inc | revision to appl #2013.03.14.2231 - removal of smoke detector shutdown.Details
revision to appl #2013.03.14.2231 - removal of smoke detector shutdown. | |
| Mar 14, 2013 | Completed final sign-off Nov 2013 | 440 Turk St | Kent M Lim & Company Inc | install mechancial cooling at commission room & i.t. room at commercial floors (1st & 2nd floors).Details
install mechancial cooling at commission room & i.t. room at commercial floors (1st & 2nd floors). | $325,000 |
| Mar 12, 2013 | Completed final sign-off Nov 2018 | 440 Turk St | San Francisco Fire Protection | voluntary replacement of the panel with new at the same location in fully sprinklered building. replace 34 (e) smoke detectors, 29 pull stations, 20 horn/strobes with new devices at the same location. tie-in (e) waterflow, tamper switches. install modules to monitor (e) fire pump control unitDetails
voluntary replacement of the panel with new at the same location in fully sprinklered building. replace 34 (e) smoke detectors, 29 pull stations, 20 horn/strobes with new devices at the same location. tie-in (e) waterflow, tamper switches. install modules to monitor (e) fire pump control unit | $26,000 |
| Mar 26, 2012 | Expired or cancelled cancelled Jan 2026 | 430 Turk St | upgrade e dhw system. replace e dhw storage tank with 2 new condensing water heatersDetails
upgrade e dhw system. replace e dhw storage tank with 2 new condensing water heaters | $15,000 | |
| Nov 10, 2011 | Expired or cancelled revoked Nov 2011 | 440 Turk St | no changes in use. for shelter only. no structural work.Details
no changes in use. for shelter only. no structural work. | $200 | |
| Sep 26, 2007 | Completed final sign-off Oct 2007 | 430 Turk St | Western Roofing Service | reroofingDetails
reroofing | $215,919 |
| Jan 30, 2006 | Completed final sign-off Jun 2007 | 430 Turk St | Imr Contractor Corp. | roof, gutter, downspout replacement. repairs to existing exterior insulation and finish system (eifs) replacment of (eifs) replacement of existing flashing at windows, doors, replacement of sealants. door replacement is in kind or better.Details
roof, gutter, downspout replacement. repairs to existing exterior insulation and finish system (eifs) replacment of (eifs) replacement of existing flashing at windows, doors, replacement of sealants. door replacement is in kind or better. | |
| Jun 20, 2005 | Never finaled issued Jun 2005, no final | 430 Turk St | streetspaceDetails
streetspace | ||
| Jun 6, 2005 | Expired or cancelled cancelled Apr 2007 | 430 Turk St | standby generator installation @ (e) garage with remote redator on 3rd floor roof.Details
standby generator installation @ (e) garage with remote redator on 3rd floor roof. | $250,000 | |
| Apr 15, 2005 | Completed final sign-off Jun 2005 | 430 Turk St | Western Roofing Service | renovation to men's and women's tiolet rooms at ground flr of 430 turk st & to front doorDetails
renovation to men's and women's tiolet rooms at ground flr of 430 turk st & to front door | |
| Mar 29, 2005 | Never finaled issued Mar 2005, no final | 430 Turk St | streetspaceDetails
streetspace | ||
| May 18, 2004 | Completed final sign-off Jun 2005 | 440 Turk St | reroofingDetails
reroofing | $150,000 | |
| May 17, 2004 | Completed final sign-off Jun 2005 | 440 Turk St | Western Roofing Service | replace (e)built up roof assembly @3/f withnew built up roof w/protected membrane roof panels.Details
replace (e)built up roof assembly @3/f withnew built up roof w/protected membrane roof panels. | $80,000 |
| Jun 24, 2003 | Expired or cancelled cancelled Mar 2009 | 440 Turk St | Steiny & Co Inc | install emergency generator on 3rd fl roof. steel framed platform to support generator. fuel supply line for generator. electrical wiring to tie-in generator to building existing electrical systemDetails
install emergency generator on 3rd fl roof. steel framed platform to support generator. fuel supply line for generator. electrical wiring to tie-in generator to building existing electrical system | $248,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- D.F.P.F Corp Dba Fine Line Construction (3), Western Roofing Service (3), Kent M Lim & Company Inc (2), Imr Contractor Corp., Sabah International Incorporated, San Francisco Fire Protection, Steiny & Co Inc, Tony Ng Plumbing Co
- Architects
- Mauricio Melchor
- Engineers
- Daniel N. Manheim, Peter H. Johnson, Raymond Joseph Keane
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.