Raymond Keane
- Listed as
- engineer
- Firm
- Engineering 350
- Based in
- San Francisco
- On San Francisco permits
- Feb 2012 to Jul 2026
34 permits since 2000 (engineer on 34 permits): 26 completed, 4 in progress, 3 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 9, 2026 | In progress issued Aug 2026 | 1 Zoo Rd | Ca United Mechanical, Inc | replace existing gas furnaces with electric heat pump split systems. replace existing gas water heater with heat pump water heater.Details
replace existing gas furnaces with electric heat pump split systems. replace existing gas water heater with heat pump water heater. | $814,075 |
| Sep 25, 2025 | In progress filed Sep 2025, not yet issued | 125 Mason St | D & H Construction | convert basement parking to loading zones only; electrification of bldg heating & water heating systems; upgrading lights to led; convert 3-units to mobility; 2-units to hvi; playground replacement 1/f; selective glazing; accessibility upgrade to comm romm @ 9/f lounge; roofing replacment; bldg signDetails
convert basement parking to loading zones only; electrification of bldg heating & water heating systems; upgrading lights to led; convert 3-units to mobility; 2-units to hvi; playground replacement 1/f; selective glazing; accessibility upgrade to comm romm @ 9/f lounge; roofing replacment; bldg sign | $13,000,000 |
| Sep 16, 2025 | In progress issued Jun 2026 | 421 Leavenworth St | Securecom Inc | installation of a new fire alarm and detection system. in 100% affordable housing project with priority permit processing under mayor's executive directive ed 13-01. ref pa# 202305057244.Details
installation of a new fire alarm and detection system. in 100% affordable housing project with priority permit processing under mayor's executive directive ed 13-01. ref pa# 202305057244. | $129,193 |
| Jun 11, 2025 | In progress issued Sep 2025 | 2970 16th St | Cahill Guzman Construction Group Jv | 100% affordable permanent supportive housing, 9-stories, type 1-a. 136-units. 65% studio & 35% 1-bedrooms. ground flr will house resident service offices, shared common areas, wellness clinic, and a secured outdoor courtyard. 2/f provide community laundry room & terrace. units lvl 2-9.Details
100% affordable permanent supportive housing, 9-stories, type 1-a. 136-units. 65% studio & 35% 1-bedrooms. ground flr will house resident service offices, shared common areas, wellness clinic, and a secured outdoor courtyard. 2/f provide community laundry room & terrace. units lvl 2-9. | $27,500,000 |
| Sep 3, 2024 | Expired or cancelled withdrawn Feb 2025 | 4220 Geary Bl | level 1 modification - to include business tenant space. includes business tenant restroom and converts part of business space into mail ara parcel room storage room and meeting room. rev 20209505561 -s2Details
level 1 modification - to include business tenant space. includes business tenant restroom and converts part of business space into mail ara parcel room storage room and meeting room. rev 20209505561 -s2 | $65,500 | |
| Jun 11, 2024 | Completed final sign-off Aug 2024 | 725 Greenwich St | Raven Heating & Air Conditioning Inc | rooftop: replace 7 split system heat pumps in same location (like for like). weights of replacement units equal to or less than existing units.Details
rooftop: replace 7 split system heat pumps in same location (like for like). weights of replacement units equal to or less than existing units. | $111,700 |
| Jul 21, 2023 | Completed final sign-off Dec 2023 | 55 Mason St | D & H Construction | revision to 202010106291. changed include revision to 6th fl laundry room layout and unit 628 entry door location. no residential rooms to be removed, altered or demolished.Details
revision to 202010106291. changed include revision to 6th fl laundry room layout and unit 628 entry door location. no residential rooms to be removed, altered or demolished. | |
| May 16, 2023 | Completed final sign-off Jul 2024 | 1990 41st Av | Acco Engineered Systems Inc. Dba Acco En | provide and install 2 new similar elecric rtus and 1 new similar electric water heater. roof structural design and accomodation installation included. electrical upgrade by electricianDetails
provide and install 2 new similar elecric rtus and 1 new similar electric water heater. roof structural design and accomodation installation included. electrical upgrade by electrician | $440,000 |
| Aug 29, 2022 | Completed final sign-off Dec 2024 | 683 Florida St | Amone Corp | g/f: creating a multi-purpose space with a recording studio, dance rehearsal space, a kitchen and maker's space on ground floor of the base building. signage design will be under separate permit shown here for reference only.Details
g/f: creating a multi-purpose space with a recording studio, dance rehearsal space, a kitchen and maker's space on ground floor of the base building. signage design will be under separate permit shown here for reference only. | $1,750,000 |
| Dec 8, 2021 | Completed final sign-off Dec 2022 | 216 Eddy St | D & H Construction | revisions to pa #202008061226 & 202109077832: changes to the trash/laundry rooms/elevator vestibule layout in basement & service offices on the g/f. wheel chair lift omitted as no longer needed; inclusion of stair shop drawings for stair 00 previously deferred; g/f (e) steel beams alongDetails
revisions to pa #202008061226 & 202109077832: changes to the trash/laundry rooms/elevator vestibule layout in basement & service offices on the g/f. wheel chair lift omitted as no longer needed; inclusion of stair shop drawings for stair 00 previously deferred; g/f (e) steel beams along | |
| Sep 27, 2021 | Completed final sign-off Sep 2023 | 2206 Great Hy | Guzman Construction Group Inc. | priority processing: 100% affordable housing. rehabilitation of 10 public housing in north bldg: units 2206, 2210, 2215, 2217, 2020, 2222, 2225, 2227, 2228, 2232. replace windows & doors throughout. (n) roof, exterior finishes, fixtures & appliances. (n) mep fixtures. replace north carport in kind.Details
priority processing: 100% affordable housing. rehabilitation of 10 public housing in north bldg: units 2206, 2210, 2215, 2217, 2020, 2222, 2225, 2227, 2228, 2232. replace windows & doors throughout. (n) roof, exterior finishes, fixtures & appliances. (n) mep fixtures. replace north carport in kind. | $6,000,000 |
| Sep 27, 2021 | Completed final sign-off Sep 2023 | 2206 Great Hy | Guzman Construction Group Inc. | priority processing: 100% affordable housing. rehabilitation of 6 public housing town homes in south building: units 2243, 2252, 2253, 2260, 2263, 2268. windows and doors to be replaced throughout, (n) roofing, exterior finishes, fixtures & appliances. (n) mep fixtures. repair central carport.Details
priority processing: 100% affordable housing. rehabilitation of 6 public housing town homes in south building: units 2243, 2252, 2253, 2260, 2263, 2268. windows and doors to be replaced throughout, (n) roofing, exterior finishes, fixtures & appliances. (n) mep fixtures. repair central carport. | $5,000,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1361 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1357 0748/016b,1353 0748/016c | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1353 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1361 0748/016a,1357 0748/016bDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1365 0748/016,1361 0748/016a,1357 0748/016b | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1365 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1357 0748/016b,1361 0748/016a,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. unit connected to 1357 0748/016b,1361 0748/016a,1353 0748/016c | $925,000 |
| Aug 10, 2021 | Completed final sign-off Jun 2023 | 1357 Eddy St | Amone Corp | mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. units connected to 1365 0748/016,1361 0748/016a,1353 0748/016cDetails
mayor dir 13-01. priority 100% affordable. rehab units, improve accessibility, windows & doors replaced throughout, front facade window repair. n roofing, finishes, fixtures, appliances, lighting & mep fixtures/equip throughout. units connected to 1365 0748/016,1361 0748/016a,1353 0748/016c | $925,000 |
| Jul 6, 2021 | Completed final sign-off Aug 2023 | 200 Randolph St | Guzman Construction Group Inc. | priority 100% affordable housing. bldg b:3 of 3 structures. proposed rehabilitation of 6 of 16 public housing apts, replacement of cement plaster cladding, new windows & roofing. related bldg permits: bldg a pa# 202107063834; bldg c pa#202103237113.Details
priority 100% affordable housing. bldg b:3 of 3 structures. proposed rehabilitation of 6 of 16 public housing apts, replacement of cement plaster cladding, new windows & roofing. related bldg permits: bldg a pa# 202107063834; bldg c pa#202103237113. | $3,000,000 |
| Mar 23, 2021 | Completed final sign-off Aug 2023 | 200 Randolph St | Guzman Construction Group Inc. | priority 100% affordable housing. community rm bldg:1 of 3 structures. no dwelling units in this structure. proposed work is rehab. of comm. rm, addition of management & resident office. replacment of cement plaster cladding, n windows & roofing. site work includes all new flatwork & landscaping...Details
priority 100% affordable housing. community rm bldg:1 of 3 structures. no dwelling units in this structure. proposed work is rehab. of comm. rm, addition of management & resident office. replacment of cement plaster cladding, n windows & roofing. site work includes all new flatwork & landscaping... | $2,000,000 |
| Feb 18, 2021 | Completed final sign-off Jan 2022 | 2200 Van Ness Av | F D C Construction Inc | mep designs for office t.i. per app#202001303133Details
mep designs for office t.i. per app#202001303133 | |
| Nov 2, 2020 | Never finaled issued Mar 2021, no final | 898 La Salle Av | Lennar Homes Of California Inc. | mayor dir# 17-02. plumbing only: alternate water plumbing system & cistern systems systems for future work under pa# 201603141951-s. ** maher: n/a **Details
mayor dir# 17-02. plumbing only: alternate water plumbing system & cistern systems systems for future work under pa# 201603141951-s. ** maher: n/a ** | $10,000 |
| Nov 2, 2020 | Never finaled issued Mar 2021, no final | 888 La Salle Av | Lennar Homes Of California Inc. | mayor dir# 17-02. plumbing only: alternate water plumbing system & cistern systems systems for future work under pa# 201603141960-s. ** maher: n/a **Details
mayor dir# 17-02. plumbing only: alternate water plumbing system & cistern systems systems for future work under pa# 201603141960-s. ** maher: n/a ** | $10,000 |
| Oct 13, 2020 | Never finaled filed Oct 2020, never issued | 75 Dore St | Guzman Construction Group Inc. | priority processing. general alterations including accessible apartment upgrades, cabinetry, some fixtures & fittings, new heating at common area, some altered power & lighting. code / life safety upgrades and maintenance replacements.Details
priority processing. general alterations including accessible apartment upgrades, cabinetry, some fixtures & fittings, new heating at common area, some altered power & lighting. code / life safety upgrades and maintenance replacements. | $3,000,000 |
| Oct 10, 2020 | Completed final sign-off Sep 2023 | 55 Mason St | D & H Construction | voluntary seismic upgrade of steel horizontal bracing system installed below (e) floor framing levels 2-6. 14 units will be converted to %100 accessible apts. remaining 120 housing units receive interior finish upgrades. 6 units to receive communication devices. common area and mep upgrades as well.Details
voluntary seismic upgrade of steel horizontal bracing system installed below (e) floor framing levels 2-6. 14 units will be converted to %100 accessible apts. remaining 120 housing units receive interior finish upgrades. 6 units to receive communication devices. common area and mep upgrades as well. | $12,000,000 |
| Mar 12, 2019 | Completed final sign-off Nov 2019 | 951 Eddy St | Guzman Construction Group Inc. | unit 102. renovation of unit to provide a fully accessible mobility unit. (n) finishes throughoutDetails
unit 102. renovation of unit to provide a fully accessible mobility unit. (n) finishes throughout | $48,500 |
| Feb 1, 2018 | Completed final sign-off Sep 2018 | 761 03rd St | R 3 Builders Inc. | interior ti to include new partitions, ada restrooms, & meps. maher naDetails
interior ti to include new partitions, ada restrooms, & meps. maher na | $140,000 |
| Feb 1, 2018 | Completed final sign-off Sep 2018 | 761 03rd St | R 3 Builders Inc. | exterior facade - improvements to include replacement of door, glazing & lighting exterior.Details
exterior facade - improvements to include replacement of door, glazing & lighting exterior. | $50,000 |
| Oct 24, 2017 | Completed final sign-off Nov 2024 | 76 14th St | Polytec Construction Company Inc | renovate the interior of an (e) ground floor garage & storage space to owner operated wholesale bagel manafacturing facility. no retail, sale, services or public access. ** maher: n/a **Details
renovate the interior of an (e) ground floor garage & storage space to owner operated wholesale bagel manafacturing facility. no retail, sale, services or public access. ** maher: n/a ** | $150,000 |
| Oct 16, 2017 | Completed final sign-off Oct 2018 | 855 Brannan St | Cookline Construction Inc | 1/f #b3- 1st time t.i. for new restaurant in a new construction bldg. work to include new partitions, counter seating, take out window, walk-in refrig., storage area, commercial kitchen, title 24, mechanical. signage under separate permit. n/a ordinance #155-13Details
1/f #b3- 1st time t.i. for new restaurant in a new construction bldg. work to include new partitions, counter seating, take out window, walk-in refrig., storage area, commercial kitchen, title 24, mechanical. signage under separate permit. n/a ordinance #155-13 | $550,000 |
| Aug 14, 2017 | Completed final sign-off Oct 2017 | 1201 Tennessee St | Devcon Construction | mechanical revisions to pa#201312234917 as built of fire smoke dampers. n/a ordinance #155-13Details
mechanical revisions to pa#201312234917 as built of fire smoke dampers. n/a ordinance #155-13 | |
| Jul 18, 2017 | Completed final sign-off Aug 2017 | 477 Ofarrell St | Cahill Contractors Llc. | revision to pa #201704244680 - as-built - revision to emergency generator:comments incorporated from fire inspector.Details
revision to pa #201704244680 - as-built - revision to emergency generator:comments incorporated from fire inspector. | |
| Apr 24, 2017 | Completed final sign-off Aug 2017 | 477 Ofarrell St | Cahill Contractors Llc. | revision to p #201606301292 - revision to emergency generator, comments incorporated from fire inspector only. ref. pa#201402148536 addendum #1Details
revision to p #201606301292 - revision to emergency generator, comments incorporated from fire inspector only. ref. pa#201402148536 addendum #1 | |
| Aug 19, 2016 | Completed final sign-off Mar 2020 | 1294 Shotwell St | Cahill Contractors Llc. | mayor's office housing project. to erect 9 stories, no basement, type 1a, 94 units residential senior apartment.Details
mayor's office housing project. to erect 9 stories, no basement, type 1a, 94 units residential senior apartment. | $33,000,000 |
| Mar 1, 2016 | Completed final sign-off Jan 2017 | 430 Turk St | D.F.P.F Corp Dba Fine Line Construction | revision ot pa# 201504173911 in order to clarify the full scope of accessibility improvemts, required (mod). rad program submittal, structural improvements on 9th flr,moderization of units kitchen,bathroom,floor finishes, re-configursation for accessiblility(5units) sprinklers under seperate permit,Details
revision ot pa# 201504173911 in order to clarify the full scope of accessibility improvemts, required (mod). rad program submittal, structural improvements on 9th flr,moderization of units kitchen,bathroom,floor finishes, re-configursation for accessiblility(5units) sprinklers under seperate permit, | |
| Feb 9, 2012 | Completed final sign-off Apr 2012 | 447 Battery St | Raven Heating & Air Conditioning Inc | replace interior ductwork on 4-5 ton hvac systemsDetails
replace interior ductwork on 4-5 ton hvac systems | $17,750 |