Christopher Duncan
- Listed as
- architect, engineer
- Firm
- Gelfand Partners
- Based in
- San Francisco
- On San Francisco permits
- Oct 2015 to Dec 2022
18 permits since 2000 (architect on 17 permits, engineer on 1 permit): 13 completed, 4 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 22, 2022 | Completed final sign-off Dec 2022 | 216 Eddy St | D & H Construction | as built electrical for administrative permit 202008061226Details
as built electrical for administrative permit 202008061226 | |
| Nov 16, 2022 | Completed final sign-off Dec 2022 | 216 Eddy St | D & H Construction | revision to permit 202208190923 and 202008061226 for mobility unit and communication matrix to reflect as-built conditions. add room numbers (where missing) on basement and g/f plans per mod request.Details
revision to permit 202208190923 and 202008061226 for mobility unit and communication matrix to reflect as-built conditions. add room numbers (where missing) on basement and g/f plans per mod request. | |
| Aug 19, 2022 | Completed final sign-off Dec 2022 | 216 Eddy St | D & H Construction | minor revision to permit 202112084018 to reflect changes to bathrooms at mobility unit #205, smoke detectors, sidewalk.Details
minor revision to permit 202112084018 to reflect changes to bathrooms at mobility unit #205, smoke detectors, sidewalk. | $30,000 |
| Jul 21, 2022 | Completed final sign-off Sep 2022 | 777 Stockton St | F D C Construction Inc | unit 201: revision to permit pa#202203311341 . changing bathroom sinks.Details
unit 201: revision to permit pa#202203311341 . changing bathroom sinks. | |
| Mar 31, 2022 | Completed final sign-off Sep 2022 | 777 Stockton St | F D C Construction Inc | suite 201, front building: 777 stockton street: barrier removal incl. removing doors and lowering lavatories. retile for flush thresholds.Details
suite 201, front building: 777 stockton street: barrier removal incl. removing doors and lowering lavatories. retile for flush thresholds. | $80,000 |
| Feb 3, 2022 | Completed final sign-off Apr 2022 | 2200 Van Ness Av | Amone Corp | revision to permit #202001303133. provide window in extg window opening. provide handrails at extg entrance.Details
revision to permit #202001303133. provide window in extg window opening. provide handrails at extg entrance. | |
| Dec 8, 2021 | Completed final sign-off Dec 2022 | 216 Eddy St | D & H Construction | revisions to pa #202008061226 & 202109077832: changes to the trash/laundry rooms/elevator vestibule layout in basement & service offices on the g/f. wheel chair lift omitted as no longer needed; inclusion of stair shop drawings for stair 00 previously deferred; g/f (e) steel beams alongDetails
revisions to pa #202008061226 & 202109077832: changes to the trash/laundry rooms/elevator vestibule layout in basement & service offices on the g/f. wheel chair lift omitted as no longer needed; inclusion of stair shop drawings for stair 00 previously deferred; g/f (e) steel beams along | |
| Apr 15, 2021 | Completed final sign-off Jan 2022 | 2200 Van Ness Av | Amone Corp | revision to pa 202001303133. revise opening to accessible alcove, moving interior walls, changing concrete strength. ground floor office is accessory to ccdc housing.Details
revision to pa 202001303133. revise opening to accessible alcove, moving interior walls, changing concrete strength. ground floor office is accessory to ccdc housing. | |
| Oct 13, 2020 | Never finaled filed Oct 2020, never issued | 75 Dore St | Guzman Construction Group Inc. | priority processing. general alterations including accessible apartment upgrades, cabinetry, some fixtures & fittings, new heating at common area, some altered power & lighting. code / life safety upgrades and maintenance replacements.Details
priority processing. general alterations including accessible apartment upgrades, cabinetry, some fixtures & fittings, new heating at common area, some altered power & lighting. code / life safety upgrades and maintenance replacements. | $3,000,000 |
| Aug 6, 2020 | Completed final sign-off Dec 2022 | 216 Eddy St | D & H Construction | general renovation of existing residential group housing and voluntary seismic upgrade.Details
general renovation of existing residential group housing and voluntary seismic upgrade. | $6,500,000 |
| Jan 30, 2020 | Completed final sign-off May 2022 | 2200 Van Ness Av | Amone Corp | change of use to office. accessory office t.i. demo bathrooms provide new walls, doors, windows, bathrooms and ada entranceDetails
change of use to office. accessory office t.i. demo bathrooms provide new walls, doors, windows, bathrooms and ada entrance | $1,150,000 |
| Oct 17, 2019 | Never finaled issued Dec 2019, no final | 701 Post St | 2/f:rev. pa#201805179396; enlarge access door/opening to ada restrooms. removing 1 wall at stair. providing 3 hour rated fire/smoke curtain with egress opening, providing new flooring in the storage room and finishes in lobby.Details
2/f:rev. pa#201805179396; enlarge access door/opening to ada restrooms. removing 1 wall at stair. providing 3 hour rated fire/smoke curtain with egress opening, providing new flooring in the storage room and finishes in lobby. | $45,000 | |
| Sep 24, 2019 | Completed final sign-off Oct 2021 | 1535 Jackson St | Amone Corp | mayor ed# 13-01. construction of 11 affordable sleeping units at 1st floor. general renovation of (e) residential group housing on 2nd & 3rd floor. **maher n/a**Details
mayor ed# 13-01. construction of 11 affordable sleeping units at 1st floor. general renovation of (e) residential group housing on 2nd & 3rd floor. **maher n/a** | $1,000,000 |
| May 16, 2019 | Expired or cancelled cancelled Jan 2026 | 701 Post St | comply with be ordinance 51-16. barrier removal (step at main entrance) remove exterior vestibule doors, reverse swing interior vestibule doors gelfand partners plans 4/5/19 a1.0, a2.0, a2.2 structur inc s2-1, s2-2, s2-3 (note minor sidewalk wor reqd)Details
comply with be ordinance 51-16. barrier removal (step at main entrance) remove exterior vestibule doors, reverse swing interior vestibule doors gelfand partners plans 4/5/19 a1.0, a2.0, a2.2 structur inc s2-1, s2-2, s2-3 (note minor sidewalk wor reqd) | $180,000 | |
| Mar 15, 2019 | Completed final sign-off May 2019 | 320 Clementina St | D.F.P.F Corp Dba Fine Line Construction | rev to pa# 201510301361; delete the previously approved trash compactor enclosure and continue to use the existing trash rooms. install two new trash compactors in the existing trash rooms.Details
rev to pa# 201510301361; delete the previously approved trash compactor enclosure and continue to use the existing trash rooms. install two new trash compactors in the existing trash rooms. | |
| May 3, 2017 | Never finaled issued May 2017, no final | 320 Clementina St | D.F.P.F Corp Dba Fine Line Construction | revision to 201510301361 to revise typical unit balcony door threshold detailDetails
revision to 201510301361 to revise typical unit balcony door threshold detail | |
| Dec 19, 2016 | Never finaled issued Mar 2017, no final | 701 Post St | restore basement retaining wall & stair structure drawing s2.1, s2.2 seismic upgrade work repairs - basement levels, not visibleDetails
restore basement retaining wall & stair structure drawing s2.1, s2.2 seismic upgrade work repairs - basement levels, not visible | $28,000 | |
| Oct 30, 2015 | Completed final sign-off May 2019 | 320 Clementina St | Tony Ng Plumbing Co, D.F.P.F Corp Dba Fine Line Construction | moh rad priority project. clementina tower are identical concrete buildings with 13 floors of seior and disable housing, scope of work includes structural, life safety and accessibility upgrades and general renovations.Details
moh rad priority project. clementina tower are identical concrete buildings with 13 floors of seior and disable housing, scope of work includes structural, life safety and accessibility upgrades and general renovations. | $36,000,000 |