Permit GraphShortlistSan Francisco building permits since 2000

Marc Andrew Steyer

License
S6022
Look the license up with the state
Listed as
engineer
Firm
Tipping Structural Engineers
Based in
Berkeley
On San Francisco permits
Aug 2016 to Sep 2026

40 permits since 2000 (engineer on 40 permits): 28 completed, 9 in progress, 2 never finaled, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Sep 16, 2026In progress
filed Sep 2026, not yet issued
1455 Market Stfloor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electric
Details
Permit
202609168183
Status
filed
Filed
Sep 16, 2026
Declared cost
$85,000
Address
1455 Market St

floor: 8 and 9; shall consist of interior demolition of portion of (e) south stair enclosure on floor 8 and new construction of non-structural elements including but not limited to new interior partitions to enclose existing floor 8 and 9 north stair, new door, and associated mechamical and electric

Open the permit page

$85,000
Sep 16, 2026In progress
filed Sep 2026, not yet issued
1455 Market Stfloor 11, shall consist of interior demolition of (e) south stair and new construction of structual floor infill. no mechanical, electrical or plumbing work to be performed.
Details
Permit
202609168178
Status
filed
Filed
Sep 16, 2026
Declared cost
$225,000
Address
1455 Market St

floor 11, shall consist of interior demolition of (e) south stair and new construction of structual floor infill. no mechanical, electrical or plumbing work to be performed.

Open the permit page

$225,000
Aug 4, 2026In progress
issued Sep 2026
590 Van Ness AvGci, Inc1st fl - structural reinforcement of existing floor. new columns and footings on basement level
Details
Permit
202608046044
Status
issued
Filed
Aug 4, 2026
Permit issued
Sep 2, 2026
Declared cost
$181,068
Address
590 Van Ness Av

1st fl - structural reinforcement of existing floor. new columns and footings on basement level

Open the permit page

$181,068
Jul 24, 2026In progress
issued Sep 2026
590 Van Ness AvGci, Inc2/f: office t.i. including offices, breakroom, confereence rooms. includes mep.
Details
Permit
202607245550
Status
issued
Filed
Jul 24, 2026
Permit issued
Sep 2, 2026
Declared cost
$1,591,400
Address
590 Van Ness Av

2/f: office t.i. including offices, breakroom, confereence rooms. includes mep.

Open the permit page

$1,591,400
Feb 23, 2026In progress
issued Mar 2026
201 03rd StPrima Acquire Inc Dba Lahue And Associatinstall a halo-illuminated reverse-channel letters, single faced mounted to aluminum raceways sign: "harvey" on the 3rd street
Details
Permit
202602236335
Status
issued
Filed
Feb 23, 2026
Permit issued
Mar 2, 2026
Declared cost
$70,000
Address
201 03rd St

install a halo-illuminated reverse-channel letters, single faced mounted to aluminum raceways sign: "harvey" on the 3rd street

Open the permit page

$70,000
Dec 22, 2025In progress
issued Mar 2026
555 California StBcci Construction Companyl45-46 interconnecting stair. new finishes & banquette platform landing
Details
Permit
202512222446
Status
issued
Filed
Dec 22, 2025
Permit issued
Mar 10, 2026
Declared cost
$125,000
Address
555 California St

l45-46 interconnecting stair. new finishes & banquette platform landing

Open the permit page

$125,000
Dec 1, 2025In progress
issued Dec 2025
555 California StBcci Construction Company45th fl - tenant improvement partitions, ceiing & finishes
Details
Permit
202512010639
Status
issued
Filed
Dec 1, 2025
Permit issued
Dec 18, 2025
Declared cost
$5,314,000
Address
555 California St

45th fl - tenant improvement partitions, ceiing & finishes

Open the permit page

$5,314,000
Sep 3, 2025Completed
final sign-off Apr 2026
376 Green StH C L Construction Inc.replacement of (e) dry-rot wooden rear egress stair in kind per sfbc 1011.12.3 as discussed at july 21, 2024 pre application plan review(option 1)
Details
Permit
202509034428
Status
complete
Filed
Sep 3, 2025
Permit issued
Sep 23, 2025
Final sign-off
Apr 22, 2026
Declared cost
$130,000
Address
376 Green St

replacement of (e) dry-rot wooden rear egress stair in kind per sfbc 1011.12.3 as discussed at july 21, 2024 pre application plan review(option 1)

Open the permit page

$130,000
Jul 29, 2025Completed
final sign-off Apr 2026
300 California StGci, Inc2/f: commericial ti, new drywall, partitios, ceilings and finishes, w/ mechanical and electrical.
Details
Permit
202507291861
Status
complete
Filed
Jul 29, 2025
Permit issued
Oct 28, 2025
Final sign-off
Apr 29, 2026
Declared cost
$800,000
Address
300 California St

2/f: commericial ti, new drywall, partitios, ceilings and finishes, w/ mechanical and electrical.

Open the permit page

$800,000
May 16, 2025In progress
issued Nov 2025
2675 Geary BlSevan Multi-Site Solutions Incl3- core "n" shell upgrade to vacant space. hvac, electrical, plumbing upgrades. structural strengthening space to remain vacant until future t.i.
Details
Permit
202505166648
Status
issued
Filed
May 16, 2025
Permit issued
Nov 12, 2025
Declared cost
$960,000
Address
2675 Geary Bl

l3- core "n" shell upgrade to vacant space. hvac, electrical, plumbing upgrades. structural strengthening space to remain vacant until future t.i.

Open the permit page

$960,000
May 9, 2025In progress
issued Aug 2025
555 California StBcci Construction Company52nd fl: tenant improvement. new partitions, ceilings, finishes with associated mep
Details
Permit
202505096128
Status
issued
Filed
May 9, 2025
Permit issued
Aug 12, 2025
Declared cost
$4,360,000
Address
555 California St

52nd fl: tenant improvement. new partitions, ceilings, finishes with associated mep

Open the permit page

$4,360,000
Sep 23, 2024Completed
final sign-off Feb 2025
162 Randall StYoung & Burton Increvision to permit 202209122271 to update required special inspections, removing special inspection on 6 and 18 bc as they are not required.
Details
Permit
202409231410
Status
complete
Filed
Sep 23, 2024
Permit issued
Oct 2, 2024
Final sign-off
Feb 5, 2025
Address
162 Randall St

revision to permit 202209122271 to update required special inspections, removing special inspection on 6 and 18 bc as they are not required.

Open the permit page

Mar 28, 2024Completed
final sign-off Jan 2025
535 Mission StSkyline Construction24th fl: interior tenant improvement of existing office. minor demolition of some existing walls and ceilings. mep deferred for separate permit.
Details
Permit
202403288831
Status
complete
Filed
Mar 28, 2024
Permit issued
Apr 22, 2024
Final sign-off
Jan 22, 2025
Declared cost
$1,500,000
Address
535 Mission St

24th fl: interior tenant improvement of existing office. minor demolition of some existing walls and ceilings. mep deferred for separate permit.

Open the permit page

$1,500,000
Mar 20, 2024Completed
final sign-off Jan 2025
535 Mission StSkyline Construction25th fl - interior tenant improvement of existing office; demolition of existing walls and ceilings (minor demo); deferred mep on separate permit
Details
Permit
202403208246
Status
complete
Filed
Mar 20, 2024
Permit issued
Apr 1, 2024
Final sign-off
Jan 29, 2025
Declared cost
$1,500,000
Address
535 Mission St

25th fl - interior tenant improvement of existing office; demolition of existing walls and ceilings (minor demo); deferred mep on separate permit

Open the permit page

$1,500,000
Sep 12, 2023Completed
final sign-off Oct 2024
2300 Harrison StField Construction Inc.roof deck to be enlarged & enhancced. increase the perimeter of deck by 4' along 3 sides, reconfigure the ramp system to be compliant w/accessibility
Details
Permit
202309126396
Status
complete
Filed
Sep 12, 2023
Permit issued
Jan 11, 2024
Final sign-off
Oct 16, 2024
Declared cost
$600,000
Address
2300 Harrison St

roof deck to be enlarged & enhancced. increase the perimeter of deck by 4' along 3 sides, reconfigure the ramp system to be compliant w/accessibility

Open the permit page

$600,000
Jun 16, 2023Completed
final sign-off Dec 2023
220 Montgomery StPrincipal Builders Inc.revision to pa# 202212198630, to incoporate the following changes- removal of items from t.i. scope and added to deffered submittals: 6.steel shelving @ axon & media wall, 7.steel framed structure @ reception hut. added typical anchorage details.
Details
Permit
202306160275
Status
complete
Filed
Jun 16, 2023
Permit issued
Jul 5, 2023
Final sign-off
Dec 5, 2023
Address
220 Montgomery St

revision to pa# 202212198630, to incoporate the following changes- removal of items from t.i. scope and added to deffered submittals: 6.steel shelving @ axon & media wall, 7.steel framed structure @ reception hut. added typical anchorage details.

Open the permit page

May 15, 2023Never finaled
issued Aug 2023, no final
100 ChannelJunoworksinstall artwork in front of building
Details
Permit
202305157784
Status
issued
Filed
May 15, 2023
Permit issued
Aug 14, 2023
Declared cost
$50,000
Address
100 Channel

install artwork in front of building

Open the permit page

$50,000
Dec 20, 2022Completed
final sign-off Jul 2023
220 Montgomery StField Construction Inc.mechanical, new energy recovery ventilator, 1 sound trap, 6 vrv condenser units. new electrical plumbing, new roof receptor for vrv. structural support for hvac equip
Details
Permit
202212208707
Status
complete
Filed
Dec 20, 2022
Permit issued
Feb 21, 2023
Final sign-off
Jul 28, 2023
Declared cost
$700,000
Address
220 Montgomery St

mechanical, new energy recovery ventilator, 1 sound trap, 6 vrv condenser units. new electrical plumbing, new roof receptor for vrv. structural support for hvac equip

Open the permit page

$700,000
Dec 19, 2022Completed
final sign-off Jan 2024
220 Montgomery StPrincipal Builders Inc.2nd floor t.i. non structural partitions, structural elements, ceilings, fixtures and finishes. mep deferred.
Details
Permit
202212198630
Status
complete
Filed
Dec 19, 2022
Permit issued
Mar 10, 2023
Final sign-off
Jan 23, 2024
Declared cost
$2,600,000
Address
220 Montgomery St

2nd floor t.i. non structural partitions, structural elements, ceilings, fixtures and finishes. mep deferred.

Open the permit page

$2,600,000
Oct 27, 2022Never finaled
issued Nov 2022, no final
1 Sansome StField Construction Inc.revision to ref#2022-0718-8654. structural revision for operable partition on 15th flr. also known as nana wall support.
Details
Permit
202210275321
Status
issued
Filed
Oct 27, 2022
Permit issued
Nov 7, 2022
Address
1 Sansome St

revision to ref#2022-0718-8654. structural revision for operable partition on 15th flr. also known as nana wall support.

Open the permit page

Sep 12, 2022Completed
final sign-off Feb 2025
162 Randall StYoung & Burton Inccomplete remodel of the interiors of an e 3 story wood framed, 2 unit house. replace select exterior windows and doors, removing a balcony at rear of building. all work to be done within the existing boundary of the building.
Details
Permit
202209122271
Status
complete
Filed
Sep 12, 2022
Permit issued
Jan 6, 2023
Final sign-off
Feb 5, 2025
Declared cost
$1,000,000
Address
162 Randall St

complete remodel of the interiors of an e 3 story wood framed, 2 unit house. replace select exterior windows and doors, removing a balcony at rear of building. all work to be done within the existing boundary of the building.

Open the permit page

$1,000,000
Aug 19, 2022Completed
final sign-off Dec 2022
216 Eddy StD & H Constructionminor revision to permit 202112084018 to reflect changes to bathrooms at mobility unit #205, smoke detectors, sidewalk.
Details
Permit
202208190923
Status
complete
Filed
Aug 19, 2022
Permit issued
Oct 13, 2022
Final sign-off
Dec 28, 2022
Declared cost
$30,000
Address
216 Eddy St

minor revision to permit 202112084018 to reflect changes to bathrooms at mobility unit #205, smoke detectors, sidewalk.

Open the permit page

$30,000
May 26, 2022Completed
final sign-off Feb 2023
1960 Bryant StPrincipal Builders Inc.change of use from light manufacturing (pdr) to arts activity space. work includes tenant improvement work - walls, partitions, millwork, lighting, mep.
Details
Permit
202205265100
Status
complete
Filed
May 26, 2022
Permit issued
Dec 15, 2022
Final sign-off
Feb 16, 2023
Declared cost
$465,000
Address
1960 Bryant St

change of use from light manufacturing (pdr) to arts activity space. work includes tenant improvement work - walls, partitions, millwork, lighting, mep.

Open the permit page

$465,000
Apr 27, 2022Completed
final sign-off Jan 2023
1960 Bryant StPrincipal Builders Inc.1/f: partial demo of common interior walls as well as a connection between buildings at 575 florida st & 1960 bryant st. roll-up fire door on 1960 side. no egress through this connection.
Details
Permit
202204273084
Status
complete
Filed
Apr 27, 2022
Permit issued
Jun 2, 2022
Final sign-off
Jan 27, 2023
Declared cost
$5,000
Address
1960 Bryant St

1/f: partial demo of common interior walls as well as a connection between buildings at 575 florida st & 1960 bryant st. roll-up fire door on 1960 side. no egress through this connection.

Open the permit page

$5,000
Dec 22, 2021Completed
final sign-off Nov 2022
226 Santa Rosa AvGil Construction & Assoc Inc.to comply with nov 202044851 - replace exterior damaged stair in kind
Details
Permit
202112224895
Status
complete
Filed
Dec 22, 2021
Permit issued
Apr 20, 2022
Final sign-off
Nov 22, 2022
Declared cost
$5,000
Address
226 Santa Rosa Av

to comply with nov 202044851 - replace exterior damaged stair in kind

Open the permit page

$5,000
Dec 8, 2021Completed
final sign-off Dec 2022
216 Eddy StD & H Constructionrevisions to pa #202008061226 & 202109077832: changes to the trash/laundry rooms/elevator vestibule layout in basement & service offices on the g/f. wheel chair lift omitted as no longer needed; inclusion of stair shop drawings for stair 00 previously deferred; g/f (e) steel beams along
Details
Permit
202112084018
Status
complete
Filed
Dec 8, 2021
Permit issued
Apr 12, 2022
Final sign-off
Dec 28, 2022
Address
216 Eddy St

revisions to pa #202008061226 & 202109077832: changes to the trash/laundry rooms/elevator vestibule layout in basement & service offices on the g/f. wheel chair lift omitted as no longer needed; inclusion of stair shop drawings for stair 00 previously deferred; g/f (e) steel beams along

Open the permit page

Oct 5, 2021Completed
final sign-off Apr 2022
575 Florida StPrincipal Builders Inc.structural demo and arch. infill of an exterior wall at level 1, a new 3 stop ada lift and an elevated platform at level 2.
Details
Permit
202110059875
Status
complete
Filed
Oct 5, 2021
Permit issued
Nov 17, 2021
Final sign-off
Apr 15, 2022
Declared cost
$50,000
Address
575 Florida St

structural demo and arch. infill of an exterior wall at level 1, a new 3 stop ada lift and an elevated platform at level 2.

Open the permit page

$50,000
Jun 29, 2021Completed
final sign-off Sep 2021
600 Battery StHillhouse Construction Company Increvision to bpa 202009023304. minor adjustment to roof deck area, guardrail location changed and minor structural modifications.
Details
Permit
202106293398
Status
complete
Filed
Jun 29, 2021
Permit issued
Jun 29, 2021
Final sign-off
Sep 24, 2021
Declared cost
$10,000
Address
600 Battery St

revision to bpa 202009023304. minor adjustment to roof deck area, guardrail location changed and minor structural modifications.

Open the permit page

$10,000
Apr 22, 2021Expired or cancelled
cancelled Jan 2026
301 Toland StC & J Contracting Increnovation of an existing warehouse including new exterior openings, and new accessible entry.
Details
Permit
202104229179
Status
cancelled
Filed
Apr 22, 2021
Declared cost
$350,000
Address
301 Toland St

renovation of an existing warehouse including new exterior openings, and new accessible entry.

Open the permit page

$350,000
Apr 6, 2021Completed
final sign-off Apr 2022
575 Florida StPrincipal Builders Inc.revision to previously approved permit 202009265042. work includes partial wall removal and 2 hr rated shaft enclosure. (n) shotcrete wall & (n) boiler.
Details
Permit
202104068011
Status
complete
Filed
Apr 6, 2021
Permit issued
Jul 22, 2021
Final sign-off
Apr 11, 2022
Address
575 Florida St

revision to previously approved permit 202009265042. work includes partial wall removal and 2 hr rated shaft enclosure. (n) shotcrete wall & (n) boiler.

Open the permit page

Feb 3, 2021Completed
final sign-off Apr 2021
56 Forest View DrAlvarado & Son Construction Increpair with tributary less than 15% of the total building area consisting of supplemental floor beam and post with new spread footing.
Details
Permit
202102033874
Status
complete
Filed
Feb 3, 2021
Permit issued
Mar 8, 2021
Final sign-off
Apr 21, 2021
Declared cost
$6,000
Address
56 Forest View Dr

repair with tributary less than 15% of the total building area consisting of supplemental floor beam and post with new spread footing.

Open the permit page

$6,000
Dec 3, 2020Completed
final sign-off Feb 2023
301 Toland StC & J Contracting Incconstruction of new structural & new non-structural partitions, ceiling, lighting, plumbing, and finishes. exterior improvements for accessibility scope of work under pa# 202011058335.
Details
Permit
202012030199
Status
complete
Filed
Dec 3, 2020
Permit issued
Aug 11, 2021
Final sign-off
Feb 6, 2023
Declared cost
$750,000
Address
301 Toland St

construction of new structural & new non-structural partitions, ceiling, lighting, plumbing, and finishes. exterior improvements for accessibility scope of work under pa# 202011058335.

Open the permit page

$750,000
Jul 13, 2020Completed
final sign-off Oct 2020
1301 Stockton StBai Constructionadditional structural details for soft story retrofit under construction (issued permit #2018-0914-0258).
Details
Permit
202007139997
Status
complete
Filed
Jul 13, 2020
Permit issued
Aug 26, 2020
Final sign-off
Oct 23, 2020
Declared cost
$8,000
Address
1301 Stockton St

additional structural details for soft story retrofit under construction (issued permit #2018-0914-0258).

Open the permit page

$8,000
Feb 7, 2020Completed
final sign-off Oct 2021
633 Folsom StPrincipal Builders Inc.interior ti at leve 7; buildout of office with meeting space & storage, kitchenette, coffee prep, huddle rooms, phone rooms, conference rooms. one all gender restroom.
Details
Permit
202002073858
Status
complete
Filed
Feb 7, 2020
Permit issued
Aug 4, 2020
Final sign-off
Oct 15, 2021
Declared cost
$3,000,000
Address
633 Folsom St

interior ti at leve 7; buildout of office with meeting space & storage, kitchenette, coffee prep, huddle rooms, phone rooms, conference rooms. one all gender restroom.

Open the permit page

$3,000,000
Jan 24, 2020Completed
final sign-off Oct 2021
633 Folsom StPrincipal Builders Inc.1st fl - interior ti including all hands area, connecting stair fromlevel 1 to level 2 and support including 2 unisex restrooms & beverage bar for employee use only (not open to public). finishes, millwork, ceilings & lighting
Details
Permit
202001242753
Status
complete
Filed
Jan 24, 2020
Permit issued
Aug 4, 2020
Final sign-off
Oct 15, 2021
Declared cost
$4,000,000
Address
633 Folsom St

1st fl - interior ti including all hands area, connecting stair fromlevel 1 to level 2 and support including 2 unisex restrooms & beverage bar for employee use only (not open to public). finishes, millwork, ceilings & lighting

Open the permit page

$4,000,000
Jan 13, 2020Completed
final sign-off Mar 2021
633 Folsom StPlant Construction Co, Lprevision to pa 2017-0601-8184 s1 (structural); adding steel beams for voluntary floor strengthening at level 2
Details
Permit
202001131709
Status
complete
Filed
Jan 13, 2020
Permit issued
Jan 16, 2020
Final sign-off
Mar 19, 2021
Address
633 Folsom St

revision to pa 2017-0601-8184 s1 (structural); adding steel beams for voluntary floor strengthening at level 2

Open the permit page

Nov 21, 2019Completed
final sign-off Oct 2020
1301 Stockton StBai Constructionportion of (e) wood floor framing over electrical basement space to be removed & replaced w (n) light weight concrete fill over metal deck. hss steel members will be used to span over (e) opening & bear directly on (e) below grade brick walls. portion of (e) wood floor framing to be removed/ replace
Details
Permit
201911217858
Status
complete
Filed
Nov 21, 2019
Permit issued
Feb 12, 2020
Final sign-off
Oct 23, 2020
Declared cost
$70,000
Address
1301 Stockton St

portion of (e) wood floor framing over electrical basement space to be removed & replaced w (n) light weight concrete fill over metal deck. hss steel members will be used to span over (e) opening & bear directly on (e) below grade brick walls. portion of (e) wood floor framing to be removed/ replace

Open the permit page

$70,000
Aug 16, 2018Completed
final sign-off Mar 2021
633 Folsom StPlant Construction Co, Lprevision to s1 (structural). modifications to foundation retrofits at 11 existing foundations. 28 new micropiles were added to the plans. ref. pa#2017-06-01-8184s1.
Details
Permit
201808167579
Status
complete
Filed
Aug 16, 2018
Permit issued
Sep 12, 2018
Final sign-off
Mar 19, 2021
Address
633 Folsom St

revision to s1 (structural). modifications to foundation retrofits at 11 existing foundations. 28 new micropiles were added to the plans. ref. pa#2017-06-01-8184s1.

Open the permit page

Jul 3, 2018Completed
final sign-off Apr 2021
633 Folsom StPlant Construction Co, Lptower crane & foundation for pa# 2017/06/01/8184-s.
Details
Permit
201807033700
Status
complete
Filed
Jul 3, 2018
Permit issued
Jul 26, 2018
Final sign-off
Apr 15, 2021
Declared cost
$200,000
Address
633 Folsom St

tower crane & foundation for pa# 2017/06/01/8184-s.

Open the permit page

$200,000
Aug 4, 2016Completed
final sign-off Mar 2017
3501 Laguna StB-Side Inc.common area- provide targeted voluntary seismic strengthening to imrpove continuity of diaphragm at 1st elevated story. n/a ordinance #155-13
Details
Permit
201608044160
Status
complete
Filed
Aug 4, 2016
Permit issued
Sep 29, 2016
Final sign-off
Mar 6, 2017
Declared cost
$8,000
Address
3501 Laguna St

common area- provide targeted voluntary seismic strengthening to imrpove continuity of diaphragm at 1st elevated story. n/a ordinance #155-13

Open the permit page

$8,000